tender · indexed from Contracts Finder API
Tunnel Segment Production Monitoring System
Sizewell C Limited
- Published
- 06 Aug 2026
- Deadline
- 14 Aug 2026
- Coverage
- GB
- Buyer
- Sizewell C Limited
- Notice type
- Contract
- Reference
- C4N117106794
Open contract | £250,000 - £500,000 | Sizewell C Limited | Tunnelling works
This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Construction work, Works for complete or part construction and civil engineering work, Engineering works and construction works, Construction work for bridges and tunnels, shafts and subways
Contract start: 2027-03-03T00:00:00Z
Contract end: 2034-12-03T00:00:00Z
Provenance
Indexed from Contracts Finder API · fetched 06 Aug 2026 · last updated 12 Aug 2026.
Open this tender in the GLODA terminal
The notice above is the public record. Signing in adds the analysis: saved views and alerts on searches like this one, workflow and pipeline, exports, contract value and benchmarks, contacts, and document links.