Améliorer l'efficacité énergétique du réseau électrique du sud de Dhaka
admin
✓Data quality: Source-backedSeen at source 18 Aug 2026Verified source
Published
Improving the energy efficiency of south Dhaka electrical grid evof@afd.frTue, 11 Aug, 2026 - 10:49 March 19, 2025 Désactivé CBD1023 Ongoing Bangladesh Energy Energy Bangladesh European Union Affordable and Clean Energy Delegation of European Union FundsLoan Legal notice EU (project) The content of this project information sheet falls under the sole responsibility of the AFD and does not necessarily reflect the opinions of the European Union.ContextBangladesh, the eighth most populous country in the world with more than 164 million people, has seen recent economic growth that has significantly reduced the proportion of the population living below the poverty line. It has also led to improvements in certain infrastructure, such as the percentage of households connected to the power grid, which rose from 10% in 1994 to a target of 96% by 2020.However, the gap in electrification between urban and rural areas remains wide, as does the growth in electricity demand. Starting in the 1990s, a series of reforms led to the creation of the Dhaka Power Distribution Company (DPDC), an electricity distribution company operating primarily in the southern part of the capital, Dhaka. With electricity demand on the DPDC grid projected to rise sharply in the coming years, there are many challenges to be addressed in order to meet those needs.In this context, smart grids have a vital role to play. They facilitate the flow of information between consumers and the electricity provider, enabling real-time adjustments to the flow of electricity for more efficient management of the power grid.DescriptionThis project is part of the ongoing effort to modernize and strengthen DPDC’s distribution network. It introduces innovative solutions for energy efficiency, along with capacity-building for DPDC’s teams in the area of smart grids.The main objective is to improve the reliability and availability of sufficient electricity through a more resilient and smarter grid by: 810 MVAR of capacitor banks (power factor correction) The construction of 6 new 132/33 kV and 33/11 kV substationsRenovation and refurbishment of existing substations,A smart grid pilot project (funded by a 12-million-euro grant from the European Union)Deployment of smart solutions in 5 existing substations and automatic reconfiguration of MV loops.ImpactsEconomic impacts: improved quality of energy distributed to 241,000 households (or 1,141,000 people)Financial impacts: reduction in undistributed energy, reduction in lossesEnvironmental and social impacts: 108,400 metric tons of CO2 saved per year, progress toward gender equality within the World Bank’s WePower program. December 1, 2019 December 1, 2028 Improve the safety and environmental footprint of textile factories 2018 - 2038BangladeshFinancing amount : € 50 000 000Improving the energy efficiency of south Dhaka electrical grid 2019 - 2028BangladeshFinancing amount : € 112 000 000Saidabad-3: Securing and sustainably managing Dhaka’s drinking water supply 2018 - 2038BangladeshFinancing amount : € 115 000 000Otjikoto Biomass Power Station Project 2024 - 2029NamibiaFinancing amount : € 100 000 000Energy Green Transition Programme 2024 - 2039MoldovaFinancing amount : € 65 000 000Contributing to the development of the power grid in the north of the country 2015 - 2020TanzaniaFinancing amount : € 14000000Adresse AFD's office in Bangladesh
Improving the energy efficiency of south Dhaka electrical grid
evof@afd.fr
Tue, 11 Aug, 2026 - 10:49
March 19, 2025
Désactivé CBD1023 Ongoing Bangladesh Energy Energy Bangladesh European Union Affordable and Clean Energy Delegation of European Union FundsLoan
Legal notice EU (project) The content of this project information sheet falls under the sole responsibility of the AFD and does not necessarily reflect the opinions of the European Union.
Through a resilient, strengthened electrical power grid, the goal of this project is to insure access to sufficient and reliable electricity in Dhaka.
Context
Bangladesh, the eighth most populous country in the world with more than 164 million people, has seen recent economic growth that has significantly reduced the proportion of the population living below the poverty line. It has also led to improvements in certain infrastructure, such as the percentage of households connected to the power grid, which rose from 10% in 1994 to a target of 96% by 2020.
However, the gap in electrification between urban and rural areas remains wide, as does the growth in electricity demand. Starting in the 1990s, a series of reforms led to the creation of the Dhaka Power Distribution Company (DPDC), an electricity distribution company operating primarily in the southern part of the capital, Dhaka. With electricity demand on the DPDC grid projected to rise sharply in the coming years, there are many challenges to be addressed in order to meet those needs.
In this context, smart grids have a vital role to play. They facilitate the flow of information between consumers and the electricity provider, enabling real-time adjustments to the flow of electricity for more efficient management of the power grid.
Description
This project is part of the ongoing effort to modernize and strengthen DPDC’s distribution network. It introduces innovative solutions for energy efficiency, along with capacity-building for DPDC’s teams in the area of smart grids.
The main objective is to improve the reliability and availability of sufficient electricity through a more resilient and smarter grid by:
• 810 MVAR of capacitor banks (power factor correction)
• The construction of 6 new 132/33 kV and 33/11 kV substations
• Renovation and refurbishment of existing substations,
• A smart grid pilot project (funded by a 12-million-euro grant from the European Union)
• Deployment of smart solutions in 5 existing substations and automatic reconfiguration of MV loops.
Impacts
• Economic impacts: improved quality of energy distributed to 241,000 households (or 1,141,000 people)
• Financial impacts: reduction in undistributed energy, reduction in losses
• Environmental and social impacts: 108,400 metric tons of CO2 saved per year, progress toward gender equality within the World Bank’s WePower program.
December 1, 2019
December 1, 2028
On the same region
Improve the safety and environmental footprint of textile factories
• Decent Work
• Employment
Ongoing
2018 - 2038
Bangladesh
Financing amount : € 50 000 000
Improving the energy efficiency of south Dhaka electrical grid
Energy
Ongoing
2019 - 2028
Bangladesh
Financing amount : € 112 000 000
Saidabad-3: Securing and sustainably managing Dhaka’s drinking water supply
• Water and Sanitation
• Climate
Ongoing
2018 - 2038
Bangladesh
Financing amount : € 115 000 000
On the same topic
Otjikoto Biomass Power Station Project
Energy
Ongoing
2024 - 2029
Namibia
Financing amount : € 100 000 000
Energy Green Transition Programme
Energy
Ongoing
2024 - 2039
Moldova
Financing amount : € 65 000 000
Contributing to the development of the power grid in the north of the country
Energy
Completed
2015 - 2020
Tanzania
Financing amount : € 14000000
Dhaka 112 000 000 € 9 years Republic of Bangladesh government
Adresse
AFD's office in Bangladesh
Provenance
Agence Française de Développement (AFD)(official channel)✓Data quality: Source-backed
Publisher
Agence Française de Développement (AFD)· FR
Source system
Agence Française de Développement (AFD) — Official API or feed
Verification
Verified — the publisher's own channel
Published
Open this signal in the GLODA terminal
The notice above is the public record. Signing in adds the analysis: saved views and alerts on searches like this one, workflow and pipeline, exports and full workspace tooling.