Skip to main content

tender · indexed from Contracts Finder API

Catcliffe & Treeton Flood Alleviation Scheme (Treeton Lane Bridge) - 2 Stage Pre-Construction Services and Works

Rotherham Metropolitan Borough Council

Published
11 Aug 2026
Deadline
01 May 2026
Coverage
GB
Buyer
Rotherham Metropolitan Borough Council
Notice type
Contract
Reference
20260811133141-104118

Awarded contract | £164,854 - £6,000,000 | Rotherham Metropolitan Borough Council | Flood-prevention works

This is a two stage design and build for Catcliffe and Treeton Flood Alleviation Shceme (Treeton lane Bridge). The site is located South of Rotherham on B6067 Treeton Lane, Catcliffe, Rotherham, South Yorkshire. A detailed hydrological and hydraulic analysis has been undertaken and concluded the existing bridge can not accommodate the flow during flood conditions. Therefore, the freeboard and the hydraulic capacity of the bridge needed to be increased. Based on the structural condition of the existing structure, the economic and financial feasibility of road improvements, and road capacity issues, it is proposed that the existing structure be raised by approximately 900mm at the same location over the Rother River. The preferred option would be a precast ""TY"" beam with an in-situ concrete deck slab supported by the existing abutments. However, the suitability of this option will need to be assessed as part of the Design phase. This is a further competition via YORCivil 3 South and West Region Lot 3 Construction work, Works for complete or part construction and civil engineering work, Construction work for water projects, River regulation and flood control works Contract start: 2026-06-01T00:00:00+01:00 Contract end: 2030-03-31T00:00:00Z Suitable for SMEs

Provenance

Indexed from Contracts Finder API · fetched 11 Aug 2026 · last updated 11 Aug 2026.

View the original notice at the source

Open this tender in the GLODA terminal

The notice above is the public record. Signing in adds the analysis: saved views and alerts on searches like this one, workflow and pipeline, exports, contract value and benchmarks, contacts, and document links.