Skip to main content

tender · indexed from Contracts Finder API

Wigan Combined Fire Station Refurbishment - Carbon Works

THE GREATER MANCHESTER COMBINED AUTHORITY

Published
24 Aug 2026
Deadline
01 Oct 2025
Coverage
GB
Buyer
THE GREATER MANCHESTER COMBINED AUTHORITY
Notice type
Contract
Reference
GMCA 1342.1

Awarded contract | £250,000 - £0 | THE GREATER MANCHESTER COMBINED AUTHORITY | Construction work

Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure.The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide control, monitoring (including energy consumption data), and analytics.•The scheme at Wigan is expected to reduce the annual carbon emissions by circa 12.5 tonnes.•The works are to be coordinated in a manner that minimises disruption to daily fire station operations and activities.•The contractor will take responsibility for the design from RIBA Stage 4b and construction RIBA Stage 5.•The formal construction programme will be issued once the formal contractor award is made. •It is proposed that the contract will be awarded on a JCT Minor Works with Contractor's Design 2024 form of contract. Construction work Contract start: 2025-12-01T00:00:00Z Contract end: 2026-03-31T00:00:00+01:00 Suitable for SMEs Suitable for VCSEs

Provenance

Indexed from Contracts Finder API · fetched 24 Aug 2026 · last updated 24 Aug 2026.

View the original notice at the source

Open this tender in the GLODA terminal

The notice above is the public record. Signing in adds the analysis: saved views and alerts on searches like this one, workflow and pipeline, exports, contract value and benchmarks, contacts, and document links.