Skip to main content

tender · indexed from Contracts Finder API

Manchester International Airport - Demolition Works

Kier Transportation - CP7 NWC

Published
27 Aug 2026
Deadline
03 Sept 2026
Coverage
GB
Buyer
Kier Transportation - CP7 NWC
Notice type
Contract
Reference
C4N118428038

Open contract | £50,000 - £100,000 | Kier Transportation - CP7 NWC | Track construction works and Demolition work and Demolition, site preparation and clearance work and Railway-track maintenance services

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements." Construction work, Works for complete or part construction and civil engineering work, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction work for railways and cable transport systems, Site preparation work, Building demolition and wrecking work and earthmoving work, Demolition, site preparation and clearance work, Repair and maintenance services, Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment, Repair, maintenance and associated services related to railways and other equipment Contract start: 2027-02-02T00:00:00Z Contract end: 2028-04-17T00:00:00+01:00 Suitable for SMEs

Provenance

Indexed from Contracts Finder API · fetched 27 Aug 2026 · last updated 29 Aug 2026.

View the original notice at the source

Open this tender in the GLODA terminal

The notice above is the public record. Signing in adds the analysis: saved views and alerts on searches like this one, workflow and pipeline, exports, contract value and benchmarks, contacts, and document links.