Tender · indexed from World Bank Procurement Notices
World Bank
Buyer: World Bank — see their procurement performance.
Request for BidsFramework Agreement(s)Goods(Two-Envelope Bidding Process)PROCUREMENT OF DISTRIBUTION TRANSFORMERS, ELECTRICITY METERS AND READY BOARDSFORAccelerating Sustainable and Clean Energy Access Transformation in Eswatini (ASCENT ESWATINI)Project ID No: P508960Specific Procurement Notice (SPN)TemplateRequest for BidsFramework Agreement(s) for Goods(Primary Procurement, Two-Envelope Bidding Process)Procuring Agency: Eswatini Electricity CompanyCountry: Kingdom of EswatiniName of Project: Accelerating Sustainable and Clean Energy Transformation in Eswatini (ASCENT Eswatini)Framework Agreement Title: Supply and Delivery of Distribution Transformers, Electricity Meters and Ready BoardsRFB Reference No.: SZ-ECC-575165-GO-RFBLoan No./Credit No./Grant No.: P895069• The Government of the Kingdom of Eswatini has received financing from the World Bank toward the cost of the Accelerating Sustainable and Clean Energy Access Transformation in Eswatini Project (ASCENT in Eswatini), and intends to apply part of the proceeds toward payments under Call-off Contracts that may be awarded under the Framework Agreements (FAs)] for Procurement of Distribution Transformers, Electricity Meters and Ready Boards for the Construction of the Distribution Network to increase electricity access to households in the Kingdom of Eswatini concluded through this RFB Primary Procurement process.• The Procuring Agency is undertaking the Primary Procurement with a view to concluding Framework Agreements. The Procuring Agency is the sole Purchaser under the Framework Agreement[s]. The Procuring Agency now invites sealed Bids from eligible Bidders for Procurement of Electrical Materials and Equipment, over the Term of the Framework Agreement(s). Distribution Transformers, Minisubs and Ring Main Units, Metering Materials and Accessories.• The Framework Agreements to be concluded will be Single-User. The Single-User entitled to purchase under the Framework Agreements is Eswatini Electricity Company.• The Framework Agreements to be concluded will be Multi-Supplier.• The selection of a FA Supplier to be awarded a Call-off Contract will be done through a Secondary Procurement process as defined in Framework Agreement. However, the conclusion of a Framework Agreement shall not impose any obligation on the Procuring Agency, including participating Purchasers, to purchase Goods under a Call-off Contract. The conclusion Framework Agreement does not guarantee that a FA Supplier will be awarded a Call-off Contract.• Bidding will be conducted through International Competitive Procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” Procurement Regulations for IPF Borrowers (July 2016) (Procurement Regulations) first published in July 2016, seventh edition in September 2025, and is open to all eligible Bidders as defined in the Procurement Regulations.• Bidders may submit Bids for one or more items.• The Framework Agreements shall be concluded for a Term of 3 years, from the commencement date stated in the Framework Agreement. The initial term may be extended by a maximum of two additional years.• The Primary Procurement shall establish a Closed Framework Agreement(s).• Bids will be evaluated in accordance with the evaluation process set out in the bidding documents (in two stages). The technical bids will be evaluated first and only those that meet the minimum technical qualification will proceed to financial bid envelopes opening stage. The following weightings shall apply for Rated Criteria (including technical and non-price factors): 20%.• Interested eligible Bidders may obtain further information from Eswatini Electricity Company, Mr. Bongani Chauke, using email bongani.chauke@eec.co.sz copied thobeka.gama@eec.co.sz and new suppliers who have never supplied EEC in the past are welcome to visit the Main Stores warehouse (which is the delivery location) situated at Matsapha, Eswatini, King Sobhuza 11 Avenue, opposite Eswatini Railways next to Eswatini Fire and Emergency Services to verify material specifications and samples during office hours i.e. 0800 to 1630 hours at the address given below.• The Bidding document in English may be downloaded from www.eec.co.sz and www.esppra.co.sz. A non-refundable tender fee of E1,000.00 is payable by electronic transfer in any of the below listed EEC BANK ACCOUNTS or any of the EEC REVENUE OFFICES. The reference to be used when making payment is ASCENT:Name | Bank | Account Number | Branch Code | BranchEswatini Electricity Company | Standard bank | 9110003236261 | 663164 | Swazi PlazaEswatini Electricity Company | Nedbank | 020000286843 | 360164 | MbabaneEswatini Electricity Company | First National Bank | 62154679735 | 280164 | Mbabane• Bids must be delivered to the address below on or before 30 December 2026 @ 11.00AM. Electronic Bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked “Original Bid”, and the inner envelopes marked “Technical Part” will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below on 30 December 2026 @ 11.15 AM. All envelopes marked “Second Envelope: Financial Part” shall remain unopened and will be held in safe custody of the Procuring Agency until the second public opening.• Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s/bidders’ beneficial ownership, as part of the publication of the conclusion of framework agreement notice, using the Beneficial Ownership Disclosure Form included in the bidding document.• The address(es) referred to above is (are):Eswatini Electricity CompanyAttention: Mr. Bongani Chauke,Procurement ManagerP. O. Box 258, Mbabane, H100Tel: +268 409 4165Email: bongani.chauke@eec.co.sz copied thobeka.gama@eec.co.szWebsite: www.eec.co.szRequest for BidsFramework Agreement(s)Goods(Primary Procurement, Two-Envelope Bidding Process)Procurement of:Distribution Transformers, Electricity Meters and Ready BoardsProcuring Agency: Eswatini Electricity CompanyCountry: Kingdom of EswatiniName of Project: Accelerating Sustainable and Clean Energy Access Transformation in Eswatini (ASCENT)Framework Agreement Title: The Procurement of Distribution Transformers, Electricity Meters and Ready Boards.RFB Reference No.: SZ-ECC-575165-GO-RFBLoan No./Credit No./Grant No.: P508960RFB Issued on: 26 October 2026.Request for BidsFramework Agreement(s)GoodsTable of ContentsPART 1 – Bidding Procedures. 2Section I - Instructions to Bidders (ITB) 3Section II - Bid Data Sheet (BDS) 39Section III - Evaluation and Qualification Criteria. 49Section IV - Bid Forms. 56Section V - Eligible Countries. 78Section VI - Fraud and Corruption. 79PART 2 – Supply Requirements. 81Section VII - Schedule of Requirements. 83PART 3 – Procuring Agency Forms. 92PART 4 – Framework Agreement 100Framework Agreement Provisions (FAP) 104Appendix to the Framework Agreement: Fraud and Corruption. 122Framework Agreement – Schedules. 124SCHEDULE 1: Schedule of Requirements. 124SCHEDULE 2: Price Schedules. 126SCHEDULE 3: Security Forms. 127SCHEDULE 4: Secondary Procurement 132SCHEDULE 5: List of Purchasers (if applicable) 161PART 1 – Bidding ProceduresSection I - Instructions to Bidders (ITB)ContentsA. General 61. Scope of Bid. 62. Source of Funds. 93. Fraud and Corruption. 94. Eligible Bidders. 105. Eligible Goods and Related Services. 13B. Contents of the RFB Document 146. Sections of Bidding Document 147. Clarification of Bidding Document 158. Amendment of Bidding Document. 15C. Preparation of Bids. 169. Cost of Bidding. 1610. Language of Bid. 1611. Documents Comprising the Bid. 1612. Letters of Bid. 1813. Alternative Bids. 1814. Bid Prices and Discounts. 1815. Currencies of Bid and Payment. 2016. Documents Establishing the Eligibility and Conformity of Goods. 2017. Documents Establishing the Eligibility and Qualifications of the Bidder. 2118. Period of Validity of Bids. 2219. No Bid Security or Bid Securing Declaration. 2220. Format and Signing of Bid. 23D. Submission of Bids. 2321. Sealing and Marking of Bids. 2322. Deadline for Submission of Bids. 2423. Late Bids. 2424. Withdrawal, Substitution, and Modification of Bids. 24E. Public Opening of Technical Parts of Bids. 2525. Public Opening of Technical Parts of Bids. 25F. Evaluation of Bids – General Provisions. 2726. Confidentiality. 2727. Clarification of Bids. 2728. Deviations, Reservations, and Omissions. 2829. Nonconformities, Errors and Omissions. 28G. Evaluation of Technical Parts of Bids. 2830. Evaluation of Technical Parts. 28H. Notification of Evaluation of Technical Parts and Public Opening of Financial Parts of Bids. 3031. Notification of Evaluation of Technical Parts and Public Opening of Financial Parts. 30I. Evaluation of Financial Parts of Bids. 3232. Evaluation of Financial Parts. 3233. Correction of Arithmetical Errors. 3434. Conversion to Single Currency. 3435. No Margin of Preference. 3436. Comparison of Financial Parts. 34J. Evaluation of Combined Technical and Financial Parts and Notification of Intention to Conclude A Framework Agreement 3437. Evaluation of combined Technical and Financial Parts, Procuring Agency’s Right to Accept or Reject Bids. 3438. Standstill Period. 3539. Notification of Intention to Conclude a Framework Agreement 35K. Conclusion of a Framework Agreement 3640. Framework Agreement Criteria. 3641. Notification to Conclude a Framework Agreement 3642. No Obligation to Purchase. 3643. Non-exclusivity. 3644. Debriefing by the Procuring Agency. 3645. Signing the Framework Agreement 3746. Publication of the Conclusion of Framework Agreement Notice. 3747. Procurement Related Complaint 38L. Secondary Procurement Process for awarding a Call-off Contract 3848. Method and criteria for award of Call-off Contract. 3849. Adjustment to the Base Price. 38Section I. Instructions to BiddersGeneralScope of Bid | In connection with the Specific Procurement Notice, Request for Bids (RFB) Framework Agreement(s) Goods, specified in the Bid Data Sheet (BDS), the Procuring Agency, as specified in the BDS, issues this Request for Bids (RFB) document as part of the Primary Procurement process for Goods, and may lead to Framework Agreement(s) being concluded with the successful Bidder(s). The name and identification of this RFB are specified in the BDS.Throughout this Bidding document:“in writing” means communicated in written form (e.g. by mail, e-mail, fax, including if specified in the BDS, distributed or received through the electronic-procurement system used by the Procuring Agency) with proof of receipt;if the context so requires, “singular” means “plural” and vice versa;“Day” means calendar day, unless otherwise specified as “Business Day”. A Business Day is any day that is an official working day of the Borrower. It excludes the Borrower’s official public holidays;“Call-off Contract” means a contract awarded, under a Framework Agreement, through a Secondary Procurement process, for the supply of Goods, and any Related Services. The parties to the contract are the Purchaser and Supplier;“Closed Framework Agreement”: A Closed Framework Agreement is where no new firm(s) may conclude Framework Agreement(s) during the Term of the Framework Agreement;“Country” means the Procuring Agency’s/Purchaser’s country;“Delivery Period” is the specified period from the date of formation of a Call-off contract for delivery of the Goods, as per the applicable Incoterms;“Framework Agreement (FA)” means the agreement between the Procuring Agency and Supplier (s) (the successful Bidder(s)) to establish the terms and procedures governing the award of Call-off contracts under the agreement;“FA Supplier” means a Supplier;“Goods” means all goods, materials or items that the Supplier is required to supply to a Purchaser under a Call-off Contract placed under a Framework Agreement. Details of such Goods are set out in Part 2, Supply Requirements, and the Framework Agreement and particularly described in a Call-off Contract. Where appropriate, for the purpose of interpretation, the definition for Goods includes Related Services;“Lead Purchaser” when named in the Framework Agreement, a Lead Purchaser is a party to the Framework Agreement, in its capacity as: (a) the lead agency acting on behalf of all participating Purchasers in managing and administering the Framework Agreement, and (b) as a Purchaser in its own right;“Multi-User Framework Agreement” means a Framework Agreement where there is more than one Purchaser permitted to purchase through a Call-off Contract;“Multi-Supplier Framework Agreement” means where more than one Bidder (Supplier) concludes a Framework Agreement for the supply of each item;“Primary Procurement” means the procurement process that results in concluding a Framework Agreement(s) with a successful Bidder(s), as described in this RFB;“Procuring Agency” means the agency that undertakes the Primary Procurement process and concludes the Framework Agreement(s);“Purchaser”, as specified in the BDS, means the agency(ies) that is/are permitted to purchase Goods from a Supplier under a Call-off Contract awarded through a Framework Agreement;“Related Services” if applicable, means the services incidental to the supply of the Goods, such as insurance, installation, training, initial maintenance and other such obligations of the Supplier, as specified in Framework Agreement Schedule 1: Schedule of Requirements, and specifically described in a Call-off Contract;“Responsible Agency” when named in the Framework Agreement, is a party to the Framework Agreement, but only in its capacity to conclude the Framework Agreement(s) with successful Suppliers, and, as the agency responsible for managing and administering the Framework Agreement, on behalf of the Purchaser or Purchasers, once it has been concluded. A Responsible Agency is not a Purchaser under the Framework Agreement;“Secondary Procurement” means the process described in the Framework Agreement and followed by a Purchaser to select a FA Supplier, and award a Call-off Contract for the supply of Goods;“Single-User Framework Agreement” means a Framework Agreement where there is only one Purchaser;“Single-Supplier Framework Agreement” means a Framework Agreement where only one Bidder (Supplier) concludes a Framework Agreement for the supply of each item;“Supplier” means a Bidder that has concluded a Framework Agreement through the Primary Procurement process and may be considered for the award of a Call-off Contract, to deliver the Goods, and, if applicable, Related Services, as and when required. A Supplier may also be referred to as a “FA Supplier”;“Term” mean the duration of a Framework Agreement starting on the Commencement Date. Where applicable, it includes any extension(s) to the initial Term, if permitted and agreed.Source of Funds | The Borrower or Recipient (hereinafter called “Borrower”) specified in the BDS has applied for, or received financing (hereinafter called “funds”) from the International Bank for Reconstruction and Development or the International Development Association (hereinafter called “the Bank”) in an amount specified in the BDS, toward the project named in the BDS. The Borrower intends to apply a portion of the funds to eligible payments under Call-off Contracts to be awarded under the Framework Agreement(s) for which this Bidding document is issued.Payment by the Bank will be made only at the request of the Borrower and upon approval by the Bank in accordance with the terms and conditions of the Loan (or other financing) Agreement. The Loan (or other financing) Agreement prohibits a withdrawal from the Loan account for the purpose of any payment to persons or entities, or for any import of Goods, if such payment or import is prohibited by decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No party other than the Borrower shall derive any rights from the Loan (or other financing) Agreement or have any claim to the proceeds of the Loan (or other financing).Fraud and Corruption | The Bank requires compliance with the Bank’s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework, as set forth in Section VI, Fraud and Corruption.In further pursuance of this policy, Bidders shall permit and shall cause their agents (whether declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit the Bank to inspect all accounts, records and other documents relating to any, Bid submission, Primary Procurement process, Framework Agreement performance, Secondary Procurement process, and/or Call-off Contract performance (in the case of award of a Call-off Contract), and to have them audited by auditors appointed by the Bank.Eligible Bidders | A Bidder may be a firm that is a private entity, a state-owned enterprise or institution subject to ITB 4.6, or any combination of such entities in the form of a joint venture (JV) under an existing agreement or with the intent to enter into such an agreement supported by a letter of intent. In the case of a joint venture, all members shall be jointly and severally liable for the execution of any Call-off Contract(s) awarded under the Framework Agreement in accordance with the Call-off Contract conditions that apply. The JV shall nominate a Representative who shall have the authority to conduct all business for and on behalf of any and all the members of the JV during the Bidding process and, in the event the JV is awarded a Call-off Contract under the Framework Agreement, during contract execution. Unless specified in the BDS, there is no limit on the number of members in a JV.A Bidder shall not have a conflict of interest. Any Bidder found to have a conflict of interest shall be disqualified. A Bidder may be considered to have a conflict of interest for the purpose of this Bidding process, if the Bidder:directly or indirectly controls, is controlled by or is under common control with another Bidder that submits a bid for the same item; orreceives or has received any direct or indirect subsidy from another Bidder that submits a bid for the same item; orhas the same legal representative as another Bidder that submits a bid for the same item; orhas a relationship with another Bidder that submits a bid for the same item, directly or through common third parties, that puts it in a position to influence the Bid of another Bidder, or influence the decisions of the Procuring Agency regarding this Primary Procurement process; oror any of its affiliates participated as a consultant in the preparation of the design or technical specifications of the Goods, or Related Services, that are the subject of the Bid; oror any of its affiliates has been hired (or is proposed to be hired) by the Procuring Agency or Purchaser or Borrower in implementing the Framework Agreement or a Call-off Contract; orwould be providing Goods, works, or non-consulting services resulting from, or directly related to consulting services for the preparation or implementation of the project specified in the BDS ITB 2.1 that it provided or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm; orhas a close business or family relationship with a professional staff of the Borrower (or of the project implementing agency, or of a recipient of a part of the loan) who:are directly or indirectly involved in the preparation of the Bidding document or specifications of the Framework Agreement or Call-off Contract, and/or the Bid evaluation process of such Framework Agreement or Call-off Contract; orwould be involved in the implementation or supervision of such Framework Agreement or Call-off Contract unless the conflict stemming from such relationship has been resolved in a manner acceptable to the Bank throughout the Bidding process and execution of the Framework Agreement and/or Call-off Contract.A firm that is a Bidder (either individually or as a JV member) shall not participate in more than one Bid. This includes participation as a subcontractor. Such participation shall result in the disqualification of all Bids in which the firm is involved. A firm that is not a Bidder or a JV member, may participate as a subcontractor in more than one Bid.A Bidder may have the nationality of any country, subject to the restrictions pursuant to ITB 4.8. A Bidder shall be deemed to have the nationality of a country if the Bidder is constituted, incorporated or registered in, and operates in conformity with, the provisions of the laws of that country, as evidenced by its articles of incorporation (or equivalent documents of constitution or association) and its registration documents, as the case may be. This criterion also shall apply to the determination of the nationality of proposed subcontractors or subconsultants for any part of a Call-off Contract including Related Services.A Bidder that has been sanctioned by the Bank, pursuant to the Bank’s Anti-Corruption Guidelines, in accordance with its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework as described in Section VI paragraph 2.2 d., shall be ineligible to be prequalified for, initially selected for, Bid for, propose for, or conclude a Bank-financed Framework Agreement or Call-off Contract or benefit from a Bank-financed Framework Agreement or Call-off Contract, financially or otherwise, during such period of time as the Bank shall have determined. The list of debarred firms and individuals is available at the electronic address specified in the BDS.Bidders that are state-owned enterprises or institutions in the Procuring Agency’s Country may be eligible to compete and conclude a Framework Agreement or be awarded a Call-off Contract(s) only if they can establish, in a manner acceptable to the Bank, that they:are legally and financially autonomous;operate under commercial law; andare not under supervision of the Procuring Agency, Responsible Agency or a Purchaser.Eligibility of Bidders suspended, as a result of the execution of a Bid–Securing Declaration or Proposal-Securing Declaration, shall be as follows:A Bidder that is under suspension from Bidding, as the result of the operation of a Bid–Securing Declaration or Proposal-Securing Declaration, by the Purchaser in case of a Single-User Framework Agreement or all Purchasers in a Multi-User Framework Agreement shall not be eligible to bid to conclude a framework agreement.A Bidder that has concluded a framework agreement is ineligible to quote for or to be awarded a Call-off Contract by a Purchaser that has suspended the bidder as the result of the operation of a Bid–Securing Declaration or Proposal-Securing Declaration.Subject to (a) above, a Bidder that is under suspension, as the result of the operation of a Bid–Securing Declaration or Proposal-Securing Declaration, by a Procuring Agency is eligible to bid for the framework agreement.Firms and individuals may be ineligible if so indicated in Section V and:as a matter of law or official regulations, the Borrower’s country prohibits commercial relations with that country, provided that the Bank is satisfied that such exclusion does not preclude effective competition for the supply of Goods or the contracting of works or services required; orby an act of compliance with a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations, the Borrower’s country prohibits any import of Goods or contracting of works or services from that country, or any payments to any country, person, or entity in that country.A Bidder shall provide such documentary evidence of eligibility satisfactory to the Procuring Agency, as the Procuring Agency shall reasonably request.A firm that is under a sanction of debarment by the Borrower from concluding a contract, or a Framework Agreement or being awarded a Call-off Contract is eligible to participate in this procurement, unless the Bank, at the Borrower’s request, is satisfied that the debarment;relates to fraud or corruption; andfollowed a judicial or administrative proceeding that afforded the firm adequate due process.Eligible Goods and Related Services | All the Goods and Related Services to be supplied under a Call-off Contract awarded under a Framework Agreement and financed by the Bank, may have their origin in any country in accordance with Section V, Eligible Countries.For purposes of this ITB, the term “Goods” includes commodities, raw materials, machinery, equipment, and industrial plants; and “Related Services” includes services such as insurance, installation, training, and initial maintenance.The term “origin” means the country where the Goods have been mined, grown, cultivated, produced, manufactured or processed; or, through manufacture, processing, or assembly, another commercially recognized article results that differs substantially in its basic characteristics from its components.Contents of the RFB DocumentSections of Bidding Document | The Bidding document consists of Parts 1, 2, 3, and 4, which include all sections, schedules, annexes. and should be read in conjunction with any addenda issued in accordance with ITB 8.PART 1 - Bidding ProceduresSection I - Instructions to Bidders (ITB)Section II - Bidding Data Sheet (BDS)Section III - Evaluation and Qualification CriteriaSection IV - Bidding FormsSection V - Eligible CountriesSection VI - Fraud and CorruptionPART 2 - Supply RequirementsSection VII - Schedule of RequirementsPART 3 - Procuring Agency FormsPART 4 - Framework Agreement (FA)SCHEDULE 1: Schedule of RequirementsSCHEDULE 2: Price SchedulesSCHEDULE 3: Secondary Procurement SCHEDULE 4: Call-off Contract General Conditions of ContractSCHEDULE 5: Secondary Procurement FormsSCHEDULE 6: List of Purchasers (if applicable)The Specific Procurement Notice “Request for Bids to conclude a Framework Agreement(s) for Goods”, issued by the Procuring Agency is not part of this Bidding document.Unless obtained directly from the Procuring Agency, the Procuring Agency is not responsible for the completeness of the document, responses to requests for clarification, the Minutes of the pre-Bid meeting (if any), or addenda to the Bidding document in accordance with ITB 8. In case of any contradiction, documents obtained directly from the Procuring Agency shall prevail.The Bidder is expected to examine all instructions, forms, terms, and specifications in the Bidding document and to furnish with its Bid all information or documentation as is required by the Bidding document.Clarification of Bidding Document | A Bidder requiring any clarification of the Bidding document shall contact the Procuring Agency in writing at the Procuring Agency’s address specified in the BDS. The Procuring Agency will respond in writing to any request for clarification, provided that such request is received prior to the deadline for submission of Bids within a period specified in the BDS. The Procuring Agency shall forward copies of its response to all Bidders who have acquired the Bidding document in accordance with ITB 6.3, including a description of the inquiry but without identifying its source. If so specified in the BDS, the Procuring Agency shall also promptly publish its response at the web page identified in the BDS. Should the clarification result in changes to the essential elements of the Bidding document, the Procuring Agency shall amend the Bidding document following the procedure under ITB 8 and ITB 22.2.Amendment of Bidding Document | At any time prior to the deadline for submission of Bids, the Procuring Agency may amend the Bidding document by issuing addenda.Any Addendum issued shall be part of the Bidding document and shall be communicated in writing to all who have obtained the Bidding document from the Procuring Agency in accordance with ITB 6.3. The Procuring Agency shall also promptly publish the addendum on the Procuring Agency’s web page in accordance with ITB 7.1.To give prospective Bidders reasonable time in which to take an addendum into account in preparing their Bids, the Procuring Agency may, at its discretion, extend the deadline for the submission of Bids, pursuant to ITB 22.2.Preparation of BidsCost of Bidding | The Bidder shall bear all costs associated with the preparation and submission of its Bid, in relation to this Primary Procurement process, (and if successful any Secondary Procurement process) and the Procuring Agency shall not be responsible or liable for those costs, regardless of the conduct or outcome of the Bidding process.Language of Bid | The Bid, as well as all correspondence and documents relating to the Bid exchanged by the Bidder and the Procuring Agency, shall be written in the language specified in the BDS. Supporting documents and printed literature that are part of the Bid may be in another language provided they are accompanied by an accurate translation of the relevant passages into the language specified in the BDS, in which case, for purposes of interpretation of the Bid, such translation shall govern.Documents Comprising the Bid | The Bid shall comprise two Parts, namely the Technical Part and the Financial Part. These two Parts shall be submitted simultaneously in two separate sealed envelopes (two-envelope Bidding process). One envelope shall contain only information relating to the Technical Part and the other, only information relating to the Financial Part. These two envelopes shall be enclosed in a separate sealed outer envelope marked “Original Bid”.The Technical Part shall contain the following:Letter of Bid -Technical Part: prepared in accordance with ITB 12;Authorization: written confirmation authorizing the signatory of the Bid to commit the Bidder, in accordance with ITB 20.3;Qualifications: documentary evidence in accordance with ITB 17 establishing the Bidder’s qualifications to conclude a Framework Agreement and perform any Call-off Contract, if awarded;Bidder’s Eligibility: documentary evidence in accordance with ITB 17 establishing the Bidder’s eligibility to Bid;Eligibility of Goods and Related Services: documentary evidence in accordance with ITB 16, establishing the eligibility of the Goods and Related Services to be supplied by the Bidder;Conformity: documentary evidence in accordance with ITB 16, that the Goods and Related Services conform to the Bidding document; andany other document required in the BDS.The Financial Part envelope shall contain the following:Letter of Bid – Financial Part: prepared in accordance with ITB 12 and ITB 14;Price Schedules: completed prepared in accordance with ITB 12 and ITB 14;any other document required in the BDS.The Technical Part shall not include any financial information related to the Bid price. Where material financial information related to the Bid price is contained in the Technical Part the Bid shall be declared non-responsive.In addition to the requirements under ITB 11.2, Bids submitted by a JV shall include a copy of the Joint Venture agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed agreement.The Bidder shall furnish in the Letter of Bid information on commissions and gratuities, if any, paid or to be paid to agents or any other party relating to this Bid.Letters of Bid | The Bidder shall prepare the Letter of Bid – Technical Part, and Letter of Bid – Financial Part using the relevant forms furnished in Section IV, Bidding Forms. The forms must be completed without any alterations to the text, and no substitutes shall be accepted except as provided under ITB 20.3. All blank spaces shall be filled in with the information requested.Alternative Bids | Alternative Bids shall not be permitted in this Primary Procurement process.Bid Prices and Discounts | The prices and unconditional discounts quoted by the Bidder in the Letter of Bid – Financial Part and in the Price Schedules shall conform to the requirements specified below.Bidders shall provide their prices in the Price Schedules, as specified ITB 14.7 below.The price to be quoted in the Letter of Bid -Financial Part in accordance with ITB 12.1 shall be, as specified in the BDS.The Bidder shall indicate the methodology for the application of any unconditional discounts in the Letter of Bid, in accordance with ITB 12.1.For the purpose of Secondary Procurement, the price(s) offered by the Bidder shall be treated as set out in the Framework Agreement Specific Provisions.The terms EXW, CIP, and other similar terms shall be governed by the rules prescribed in the current edition of Incoterms, published by the International Chamber of Commerce, as specified in the BDS.Unit prices in the Price Schedules shall be quoted against either estimated quantities over the duration of the Framework Agreement (Term) or indicative range of individual Call-off quantities as specified in the BDS. Prices shall be quoted as specified in each Price Schedule included in Section IV, Bidding Forms. The disaggregation of price components is required solely for the purpose of facilitating the comparison of Bids by the Procuring Agency. This shall not in any way limit the Purchaser’s right to award a Call-off Contract on any of the terms offered. In quoting prices, the Bidder shall be free to use transportation through carriers registered in any eligible country, in accordance with Section V, Eligible Countries. Similarly, the Bidder may obtain insurance services from any eligible country in accordance with Section V, Eligible Countries. Prices shall be entered in the following manner:For Goods to be supplied from within the Procuring Agency’s Country:If manufactured in the Procuring Agency’s Country: the price of the Goods quoted EXW (ex-works, ex-factory, ex warehouse, ex showroom, or off-the-shelf, as applicable), including all customs duties and sales and other taxes already paid or payable on the components and raw material used in the manufacture or assembly of the Goods, including the price for inland transportation, insurance, and other local services required to convey the Goods to a place of destination as specified in the Bid Data Sheet;If manufactured outside the Procuring Agency’s Country and already imported at the time of Call-off Contract: the price of the Goods quoted EXW (ex-works, ex-factory, ex warehouse, ex showroom, or off-the-shelf, as applicable) including the price for inland transportation, insurance, and other local services required to convey the Goods to a place of destination as specified in the Bid Data Sheet, but excluding any custom duties and other import taxes on the Goods.For Goods manufactured outside the Procuring Agency’s Country, to be imported for supply under a Call-off Contract:the price of the Goods, quoted CIP named place of destination, in the Procuring Agency’s Country, as specified in the BDS;for Related Services, other than inland transportation and other services required to convey the Goods to their final destination, whenever such Related Services are specified in the Schedule of Requirements, the price of each item comprising the Related Services (inclusive of any applicable taxes).During the Call-off process, suppliers may be required to include the additional prices for inland transportation, insurance, and other incidental services required to convey the Goods to their final destination/s.Currencies of Bid and Payment | The currency(ies) of the Bid and the currency(ies) of payments shall be the same. The Bidder shall quote in the currency of the Procuring Agency’s Country the portion of the Bid price that corresponds to expenditures incurred in the currency of the Procuring Agency’s Country, unless otherwise specified in the BDS.The Bidder may express the Bid price in any currency. If the Bidder wishes to be paid in a combination of amounts in different currencies, it may quote its price accordingly but shall use no more than three foreign currencies in addition to the currency of the Procuring Agency’s Country.Documents Establishing the Eligibility and Conformity of Goods | To establish the eligibility of the Goods and Related Services in accordance with ITB 5, Bidders shall complete the country of origin declarations in the Price Schedule Forms, included in Section IV, Bidding Forms.To establish the conformity of the Goods and Related Services to the Bidding document, the Bidder shall furnish as part of its Bid the documentary evidence that the Goods conform to the technical specifications and standards specified in Section VII, Schedule of Requirements.The documentary evidence may be in the form of literature, drawings or data, and shall consist of a detailed item by item description of the essential technical and performance characteristics of the Goods and Related Services, demonstrating substantial responsiveness of the Goods and Related Services to the technical specification, and if applicable, a statement of deviations and exceptions to the provisions of the Section VII, Schedule of Requirements.The Bidder shall also furnish a list giving full particulars, including available sources and current prices of spare parts, special tools, etc., necessary for the proper and continuing functioning of the Goods during the period specified in the BDS following acceptance of the Goods by the Purchaser (if a Call-off Contract is awarded to the Bidder as a FA Supplier).Standards for workmanship, process, material, and equipment, as well as references to brand names or catalogue numbers specified by the Procuring Agency in the Schedule of Requirements, are intended to be descriptive only and not restrictive. The Bidder may offer other standards of quality, brand names, and/or catalogue numbers, provided that it demonstrates, to the Procuring Agency’s satisfaction, that the substitutions ensure substantial equivalence or are superior to those specified in the Section VII, Schedule of Requirements.Documents Establishing the Eligibility and Qualifications of the Bidder | To establish Bidder’s eligibility in accordance with ITB 4, Bidders shall complete the Letter of Bid, included in Section IV, Bidding Forms.The documentary evidence of the Bidder’s qualifications to conclude a Framework Agreement, and/or to perform any Call-off Contract(s) if awarded, shall establish to the Procuring Agency’s satisfaction:that, if required in the BDS, a Bidder that does not manufacture or produce the Goods it offers to supply shall submit the Manufacturer’s Authorization using the form included in Section IV, Bidding Forms to demonstrate that it has been duly authorized by the manufacturer or producer of the Goods to supply these Goods in the Procuring Agency’s Country;that, if required in the BDS, in case of a Bidder not doing business within the Procuring Agency’s Country, the Bidder is, or will be, (if awarded the call off Contract) represented by an Agent in the country, equipped and able to carry out the Supplier’s maintenance, repair, and spare parts stocking obligations in respect of the Goods; andthat the Bidder meets each of the qualification criterion specified in Section III, Evaluation and Qualification Criteria.Period of Validity of Bids | Bids shall remain valid until the date specified in the BDS or any extended date if amended by the Procuring Agency in accordance with ITB 8. A Bid that is not valid until the date specified in the BDS, or any extended date if amended by the Procuring Agency in accordance with ITB 8, shall be rejected by the Procuring Agency as nonresponsive.In exceptional circumstances, prior to the expiry of the Bid validity, the Procuring Agency may request Bidders to extend the period of validity of their Bids. The request and the responses shall be made in writing. A Bidder may refuse the request to extend the validity of their bids. A Bidder granting the request shall not be required or permitted to modify its Bid, except as provided in ITB 18.3.If the conclusion of a Framework Agreement is delayed by a period exceeding fifty-six (56) days beyond the expiry of the initial Bid validity period, the Framework Agreement Base Price shall be determined as follows:in the case of a fixed price Framework Agreement, the Base Price shall be the Bid price adjusted by the factor specified in the BDS;in the case of an adjustable price Framework Agreement, no adjustment shall be made;in any case, Bid evaluation shall be based on the Bid price without taking into consideration the applicable correction from those indicated above.No Bid Security or Bid Securing Declaration | Bid Security or Bid-Securing Declaration is not required for this Primary Procurement process.Format and Signing of Bid | The Bidder shall prepare the Bid, in accordance with ITB 11 and ITB 21.Bidders shall mark as “CONFIDENTIAL” information in their Bids which is confidential to their business. This may include proprietary information, trade secrets, or commercial or financially sensitive information.The original and all copies of the Bid shall be typed or written in indelible ink and shall be signed by a person duly authorized to sign on behalf of the Bidder. This authorization shall consist of a written confirmation as specified in the BDS and shall be attached to the Bid. The name and position held by each person signing the authorization must be typed or printed below the signature. All pages of the Bid where entries or amendments have been made shall be signed or initialed by the person signing the Bid.In case the Bidder is a JV, the Bid shall be signed by an authorized representative of the JV on behalf of the JV, and so as to be legally binding on all the members as evidenced by a power of attorney signed by their legally authorized representative(s).Any inter-lineation, erasures, or overwriting shall be valid only if they are signed or initialed by the person signing the Bid.Submission of BidsSealing and Marking of Bids | The Bidder shall deliver the Bid in two separate, sealed envelopes (the Technical Part and the Financial Part). These two envelopes shall be enclosed in a sealed outer envelope marked “Original Bid”.In addition, the Bidder shall submit copies of the Bid in the number specified in the BDS. Copies of the Technical Part shall be placed in a separate sealed envelope marked “Copies: Technical Part”. Copies of the Financial Part shall be placed in a separate sealed envelope marked “Copies: Financial Part”. The Bidder shall place both of these envelopes in a separate, sealed outer envelope marked “Bid Copies”. In the event of any discrepancy between the original and the copies, the original shall prevail.The envelopes marked “Original Bid” and “Bid Copies” shall be enclosed in a separate sealed outer envelope for submission to the Procuring Agency.All inner and outer envelopes, shall:bear the name and address of the Bidder;be addressed to the Procuring Agency in accordance with ITB 22.1;bear the specific identification of this Bidding process indicated in ITB 1.1; andbear a warning not to open before the time and date for Bid opening.If all envelopes are not sealed and marked as required, the Procuring Agency will assume no responsibility for the misplacement or premature opening of the Bid.Deadline for Submission of Bids | Bids must be received by the Procuring Agency at the address and no later than the date and time specified in the BDS. When so specified in the BDS, Bidders shall have the option of submitting their Bids electronically. Bidders submitting Bids electronically shall follow the electronic Bid submission procedures specified in the BDS.The Procuring Agency may, at its discretion, extend the deadline for the submission of Bids by amending the Bidding document in accordance with ITB 8, in which case all rights and obligations of the Procuring Agency and Bidders previously subject to the deadline shall thereafter be subject to the deadline as extended.Late Bids | The Procuring Agency shall not consider any Bid that arrives after the deadline for submission of Bids, in accordance with ITB 22. Any Bid received by the Procuring Agency after the deadline for submission of Bids shall be declared late, rejected, and returned unopened to the Bidder.Withdrawal, Substitution, and Modification of Bids | A Bidder may withdraw, substitute, or modify its Bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and shall include a copy of the authorization (the power of attorney) in accordance with ITB 20.3, (except that withdrawal notices do not require copies). The corresponding substitution or modification of the Bid must accompany the respective written notice. All notices must be:prepared and submitted in accordance with ITB 20 and ITB 21 (except that withdrawal notices do not require copies), and in addition, the respective envelopes shall be clearly marked “Withdrawal,” “Substitution,” or “Modification;” andreceived by the Procuring Agency prior to the deadline prescribed for submission of Bids, in accordance with ITB 22.Bids requested to be withdrawn in accordance with ITB 24.1 shall be returned unopened to the Bidders.No Bid may be withdrawn, substituted, or modified in the interval between the deadline for submission of Bids and the expiration of the period of Bid validity specified by the Bidder on the Letter of Bid -Technical Part and repeated in the Letter of Bid - Financial Part, or any extension thereof.Public Opening of Technical Parts of BidsPublic Opening of Technical Parts of Bids | Except as in the cases specified in ITB 23 and ITB 24.2, the Procuring Agency shall, at this Bid opening, publicly open and read out, in accordance with this ITB, all Bids received by the deadline at the date, time and place specified in the BDS in the presence of Bidders’ designated representatives and anyone who chooses to attend. Any specific electronic Bid opening procedures required if electronic Bidding is permitted in accordance with ITB 22.1, shall be as specified in the BDS.First, the written notice of withdrawal in the envelopes marked “Withdrawal” shall be opened and read out and the envelope with the corresponding Bid shall not be opened, but returned to the Bidder. If the withdrawal envelope does not contain a copy of the “power of attorney” confirming the signature as a person duly authorized to sign on behalf of the Bidder, the corresponding Bid will be opened. No Bid withdrawal shall be permitted unless the corresponding withdrawal notice contains a valid authorization to request the withdrawal and is read out at Bid opening.Next, envelopes marked “Substitution” shall be opened and read out and exchanged with the corresponding Bid being substituted, and the substituted Bid shall not be opened, but returned to the Bidder. No Bid substitution shall be permitted unless the corresponding substitution notice contains a valid authorization to request the substitution and is read out at Bid opening.Next, envelopes marked “Modification” shall be opened and read out with the corresponding Bid. No Bid modification shall be permitted unless the corresponding modification notice contains a valid authorization to request the modification and is read out at Bid opening. Only Bids that are opened and read out at Bid opening shall be considered further.Next, all other envelopes marked “Technical Part” shall be opened one at a time. All envelopes marked “Financial Part” shall remain sealed, and kept by the Procuring Agency in safe custody until they are opened, at a later public opening, following the evaluation of the Technical Part of the Bids. On opening the envelopes marked “Technical Part” the Procuring Agency shall read out: the name of the Bidder and whether there is a modification; and any other details as the Procuring Agency may consider appropriate.Only Technical Parts of Bids that are read out at Bid opening shall be considered further in the evaluation. The Letter of Bid – Technical Part and the separate sealed envelope marked “Financial Part” are to be initialed by representatives of the Procuring Agency attending Bid opening in the manner specified in the BDS.At the Bid opening, the Procuring Agency shall neither discuss the merits of any Bid nor reject any Bid (except for late Bids, in accordance with ITB 23.1).Following the opening of the Technical Parts of the Bid the Procuring Agency shall prepare a record that shall include, as a minimum:the name of the Bidder and whether there is a withdrawal, substitution, or modification; andthe presence or absence of a duly sealed envelope marked “Financial Part”.The Bidders’ representatives who are present shall be requested to sign the record. The omission of a Bidder’s signature on the record shall not invalidate the contents and effect of the record. A copy of the record shall be distributed to all Bidders.Evaluation of Bids – General ProvisionsConfidentiality | Information relating to the evaluation of the Technical Part shall not be disclosed to Bidders or any other persons not officially concerned with the Bidding process until the notification of evaluation of the Technical Part in accordance with ITB 31. Information relating to the evaluation of Financial Part, the evaluation of combined Technical Part and Financial Part shall not be disclosed to Bidders or any other persons not officially concerned with the RFB process until the Notification of Intention to conclude a Framework Agreement is transmitted to Bidders in accordance with ITB 39.Any effort by a Bidder to influence the Procuring Agency in the evaluation or decision to conclude a Framework Agreement(s) may result in the rejection of its Bid.Notwithstanding ITB 26.2, from the time of Bid opening to the time of the Framework Agreement being concluded, if any Bidder wishes to contact the Procuring Agency on any matter related to the Bidding process, it should do so in writing.Clarification of Bids | To assist in the examination, evaluation, comparison of Bids, and qualification of Bidders, the Procuring Agency may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder in respect to its Bid and that is not in response to a request by the Procuring Agency shall not be considered. The Procuring Agency’s request for clarification and the response shall be in writing. No change, including any voluntary increase or decrease, in the prices or substance of the Bid shall be sought, offered, or permitted.If a Bidder does not provide clarifications of its Bid by the date and time set in the Procuring Agency’s request for clarification, its Bid may be rejected.Deviations, Reservations, and Omissions | During the evaluation of Bids, the following definitions apply:“Deviation” is a departure from the requirements specified in the Bidding document;“Reservation” is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding document; and“Omission” is the failure to submit part or all of the information or documentation required in the Bidding document.Nonconformities, Errors and Omissions | Provided that a Bid is substantially responsive, the Procuring Agency may waive any nonconformities in the Bid.Provided that a Bid is substantially responsive, the Procuring Agency may request that the Bidder submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Bid related to documentation requirements. Such omission shall not be related to any aspect of the price of the Bid. Failure of the Bidder to comply with the request may result in the rejection of its Bid.Evaluation of Technical Parts of BidsEvaluation of Technical Parts | In evaluating the Technical Parts of each Bid, the Procuring Agency shall use the criteria and methodologies listed in this ITB 30 and the BDS, if applicable, and Section III, Evaluation and Qualification Criteria. No other evaluation criteria or methodologies shall be permitted.The Procuring Agency’s determination of a Bid’s responsiveness is to be based on the contents of the Bid itself, as defined in ITB 11.A substantially responsive Bid is one that meets the requirements of the bidding document without material deviation, reservation, or omission. A material deviation, reservation, or omission is one that:if accepted, would:affect in any substantial way the scope, quality, or performance of the specified Goods and Related Services; orlimit in any substantial way, inconsistent with the bidding document, the Procuring Agency’s rights or the Bidder’s obligations; orif rectified, would unfairly affect the competitive position of other Bidders presenting substantially responsive Bids.The Procuring Agency shall examine the technical aspects of the Bid submitted in accordance with ITB 16 and ITB 17, in particular, to confirm that all requirements of Section VII, Schedule of Requirements have been met without any material deviation or reservation, or omission.If a Bid is not substantially responsive to the requirements of bidding document, it shall be rejected by the Procuring Agency and may not subsequently be made responsive by correction of the material deviation, reservation, or omission.the Procuring Agency shall determine, to its satisfaction, whether the eligible Bidder(s) with substantially responsive Bid(s) that are able to meet the Framework Agreement criteria, meet(s) the qualifying criteria specified in Section III, Evaluation and Qualification Criteria.The determination shall be based upon an examination of the documentary evidence of the Bidder’s qualifications submitted by the Bidder, pursuant to ITB 17. The determination shall not take into consideration the qualifications of other firms such as the Bidder’s subsidiaries, parent entities, affiliates, subcontractors (other than specialized subcontractors if permitted in the bidding document), or any other firm different from the Bidder.Prior to conclusion of the Framework Agreement, the Procuring Agency will verify that the successful Bidder (including each member of a JV) is not disqualified by the Bank due to noncompliance with contractual SEA/SH prevention and response obligations. The Procuring Agency will conduct the same verification for each subcontractor proposed by the successful Bidder. If any proposed subcontractor does not meet the requirement, the Procuring Agency will require the Bidder to propose a replacement subcontractor.Only substantially responsive bids submitted by eligible and qualified bidders shall proceed to the detailed technical evaluation to assess adequacy of the Technical Part followed by evaluation applying technical factors/subfactors and corresponding scores and weightings as specified in the BDS.Notification of Evaluation of Technical Parts and Public Opening of Financial Parts of BidsNotification of Evaluation of Technical Parts and Public Opening of Financial Parts | Following the completion of the evaluation of the Technical Parts of the Bids, and the Bank has issued its no objection (if applicable), the Procuring Agency shall notify in writing those Bidders who have failed to meet the Qualification Criteria and/or whose Bids were considered non-responsive to the requirements in the bidding document, advising them of the following information:the grounds on which their Technical Part of Bid failed to meet the requirements of the bidding document;their envelope marked “Financial Part” will be returned to them unopened after the completion of the bid evaluation process and the signing of the Framework Agreement;notify them of the date, time and location of the public opening of the envelopes marked ‘Financial Part”.The Procuring Agency shall, simultaneously, notify in writing those Bidders whose Technical Parts have been evaluated as substantially responsive to the bidding document and met the Qualification Criteria, advising them of the following information:their Bid has been evaluated as substantially responsive to the bidding document and met the Qualification Criteria; andtheir envelope marked “Financial Part” will be opened at the public opening of Financial Parts;notify them of the date, time and location of the public opening of the envelopes marked “Financial Part”.The opening date shall be not less than ten (10) Business Days from the date of notification of the results of the technical evaluation, specified in ITB 31.1 and 31.2. However, if the Procuring Agency receives a complaint on the results of the technical evaluation within the ten (10) Business Days, the opening date shall be subject to ITB 47.1. The Financial Part of the Bid shall be opened publicly in the presence of Bidders’ designated representatives and anyone who chooses to attend.At this public opening the Financial Parts will be opened by the Procuring Agency in the presence of Bidders, or their designated representatives and anyone else who chooses to attend. Bidders who met the Qualification Criteria and whose Bids were evaluated as substantially responsive will have their envelopes marked “Financial Part” opened at the second public opening. Each of these envelopes marked “Financial Part” shall be inspected to confirm that they have remained sealed and unopened. These envelopes shall then be opened by the Procuring Agency. The Procuring Agency shall read out the names of each Bidder, the technical score and the Bid prices, including any discounts, and any other details as the Procuring Agency may consider appropriate.Only envelopes of Financial Part of Bids, and discounts that are opened and read out at Bid opening shall be considered further for evaluation. The Letter of Bid - Financial Part and the Price Schedules are to be initialed by a representative of the Procuring Agency attending the Bid opening in the manner specified in the BDS.The Procuring Agency shall neither discuss the merits of any Bid nor reject any envelopes marked “Financial Part”.The Procuring Agency shall prepare a record of the Financial Part of the Bid opening that shall include, as a minimum:(a) the name of the Bidder whose Financial Part was opened; and(b) the Bid price, per item, including any discounts,The Bidders whose envelopes marked ‘Financial Part” have been opened or their representatives who are present shall be requested to sign the record. The omission of a Bidder’s signature on the record shall not invalidate the contents and effect of the record. A copy of the record shall be distributed to all Bidders.Evaluation of Financial Parts of BidsEvaluation of Financial Parts | Provided that a Bid is substantially responsive, the Procuring Agency shall rectify quantifiable nonmaterial nonconformities related to the Bid Price. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of a missing or non-conforming item or component, by adding the average price of the item or component quoted by substantially responsive Bidders. If the price of the item or component cannot be derived from the price of other substantially responsive Bids, the Procuring Agency shall use its best estimate.To evaluate the Financial Part of each Bid, the Procuring Agency shall consider the following:evaluation will be done item-wise as quoted in accordance with ITB 14;price adjustment for correction of arithmetic errors in accordance with ITB 33.1;price adjustment due to unconditional discounts offered in accordance with ITB 14.4;converting the amount resulting from applying (a) to (c) above, if relevant, to a single currency in accordance with ITB 34.1;price adjustment due to quantifiable nonmaterial nonconformities in accordance with ITB 32.1; and;the additional evaluation factors are specified in Section III, Evaluation and Qualification Criteria.If applicable, the estimated effect of price adjustment provisions in the Framework Agreement(s), applied over the Term of the Framework Agreement, shall not be taken into account in the Primary Procurement Bid evaluation.The Procuring Agency’s evaluation of a Bid will exclude and not take into account:in the case of Goods manufactured in the Procuring Agency’s Country, sales and other similar taxes, which will be payable on the Goods if a Call-off Contract is awarded to the Bidder;in the case of Goods manufactured outside the Procuring Agency’s Country, already imported or to be imported, customs duties and other import taxes levied on the imported Goods sales and other similar taxes, which will be payable on the Goods if the Call-off Contract is awarded to the Bidder;if applicable, any allowance for price adjustment during the period of execution of the Call-off Contract, if provided in Section B: Framework Agreement Specific Provisions.The Procuring Agency’s evaluation of a Bid may require the consideration of other factors, in addition to the Bid Price quoted in accordance with ITB 14. These factors may be related to the characteristics, performance, and terms and conditions of purchase of the Goods and Related Services or geographic location. The effect of the factors selected, if any, shall be expressed in monetary terms to facilitate comparison of Bids, unless otherwise specified in the BDS from amongst those set out in Section III, Evaluation and Qualification Criteria. The criteria and methodologies to be used shall be as specified in ITB 32.2(f).Correction of Arithmetical Errors | In evaluating the Financial Part of each Bid, the Procuring Agency shall correct arithmetical errors on the following basis:if there is a discrepancy between the unit prices in the Price Schedule Summary and the individual Price Schedules, the unit prices in the latter shall prevail; and if there is a discrepancy between amounts in words and figures, the amounts in words shall prevail, unless the amount expressed in words is related to an error, in which case the amount in figures shall prevail subject to (a) above.Bidders shall be requested to accept correction of arithmetical errors. Failure to accept the correction in accordance with ITB 33.1, shall result in the rejection of the Bid.Conversion to Single Currency | For evaluation and comparison purposes, the currency(ies) of the Bid shall be converted in a single currency as specified in the BDS.No Margin of Preference | No margin of preference shall apply in the Primary Procurement process and in any Secondary Procurement processes.Comparison of Financial Parts | The Procuring Agency will compare the evaluated costs of the Bids to determine the Bid/s with lowest evaluated cost/s. The comparison shall be on the basis of unit rates quoted in accordance with ITB 14, plus any required Related Services, as bid in accordance with ITB 14. The evaluation of prices shall not take into account custom duties and other taxes levied on imported Goods and sales and similar taxes levied in connection with the sale or delivery of Goods.Evaluation of Combined Technical and Financial Parts and Notification of Intention to Conclude A Framework AgreementEvaluation of combined Technical and Financial Parts, Procuring Agency’s Right to Accept or Reject Bids | The Procuring Agency’s evaluation of responsive Bids will take into account technical factors, in addition to cost factors in accordance with Section III Evaluation and Qualification Criteria. The weight to be assigned for the Technical factors and cost is specified in the BDS. The Procuring Agency will rank the Bids based on the evaluated Bid score (B).The Procuring Agency will determine the Most Advantageous Bid. The Most Advantageous Bid is the Bid of the Bidder that meets the Qualification Criteria and whose Bid has been determined to be substantially responsive to the Bidding document and is the Bid with the highest combined technical and financial score.The Procuring Agency reserves the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids at any time prior to the conclusion of a Framework Agreement(s), without thereby incurring any liability to Bidders. In case of annulment, all Bids submitted shall be promptly returned to the Bidders.Standstill Period | The Framework Agreement(s) shall not be concluded earlier than the expiry of the Standstill Period. The Standstill Period shall be ten (10) Business Days unless extended in accordance with ITB 44. The Standstill Period commences the day after the date the Procuring Agency has transmitted to each Bidder the Notification of Intention to Conclude a Framework Agreement. Where only one Bid is submitted, or if this Primary Procurement process is in response to an emergency situation recognized by the Bank, the Standstill Period shall not apply.Notification of Intention to Conclude a Framework Agreement | The Procuring Agency shall send to each Bidder (that has not already been notified that it has been unsuccessful), the Notification of Intention to Conclude a Framework Agreement(s) with the successful Bidder(s). The Notification(s) of Intention to Conclude shall contain, at a minimum, the following information:the name and address of the Bidder(s) submitting the successful Bid(s);the price(s) of the successful Bid(s), or pricing mechanism(s);the names of all Bidders who submitted Bids, and their Bid prices, or pricing mechanism(s), as readout, and as evaluated and technical scores;a statement of the reason(s) the Bid (of the unsuccessful Bidder to whom the Notification on Intention to Conclude a Framework Agreement(s) is addressed) was unsuccessful;the expiry date of the Standstill Period;instructions on how to request a debriefing and/or submit a complaint during the standstill period.Conclusion of a Framework AgreementFramework Agreement Criteria | This is a Closed Framework Agreement.The Procuring Agency shall specify in the BDS and/or Section III Evaluation and Qualification Criteria, the criteria that will apply in the selection of Bidder(s), with whom a Framework Agreement(s) may be concluded.Notification to Conclude a Framework Agreement | Prior to the date of expiry of the Bid validity and upon expiry of the Standstill Period, specified in ITB 38.1 or any extension thereof, and upon satisfactorily addressing a complaint that has been submitted within the Standstill Period, the Procuring Agency shall transmit to the successful Bidder(s) a Notification to Conclude a Framework Agreement, attaching the Framework Agreement for signature by the Bidder(s), and a request to submit the completed Beneficial Ownership Disclosure Form within eight (8) Business Days of receiving the request.No Obligation to Purchase | The conclusion of a Framework Agreement shall not impose any obligation on the Procuring Agency and/or Purchaser(s) to purchase any Goods under the Framework Agreement.Non-exclusivity | This Primary Procurement process is non-exclusive, and the Procuring Agency reserves the right to procure the Goods from other suppliers who are not FA Suppliers.Debriefing by the Procuring Agency | On receipt of the Procuring Agency’s Notification of Intention to Conclude a Framework Agreement(s), referred to in ITB 39.1, an unsuccessful Bidder has three (3) Business Days to make a written request to the Procuring Agency for a debriefing. The Procuring Agency shall provide a debriefing to all unsuccessful Bidders whose request is received within this deadline.Where a request for debriefing is received within the deadline, the Procuring Agency shall provide a debriefing within five (5) Business Days, unless the Procuring Agency decides, for justifiable reasons, to provide the debriefing outside this timeframe. In that case, the standstill period shall automatically be extended until five (5) Business Days after such debriefing is provided. If more than one debriefing is so delayed, the standstill period shall not end earlier than five (5) Business Days after the last debriefing takes place. The Procuring Agency shall promptly inform, by the quickest means available, all Bidders of the extended standstill period.Where a request for debriefing is received by the Procuring Agency later than the three (3)-Business Day deadline, the Procuring Agency should provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of the Conclusion of Framework Agreement Notice. Requests for debriefing received outside the three (3) day deadline shall not lead to extension of the standstill period. Debriefings of unsuccessful Bidders may be done in writing or verbally (over the phone or video conference) or in person. The Bidders shall bear their own costs of attending such a debriefing meeting.Signing the Framework Agreement | Unless an earlier deadline is stipulated in the BDS, the Bidder shall sign, date and return the Framework Agreement within twenty-eight (28) days of receipt of the same.In case of Multi-User Framework Agreement, the Procuring Agency shall sign each Framework Agreement on behalf of all participating Purchasers.Publication of the Conclusion of Framework Agreement Notice | Within ten (10) Business Days of transmission to the successful Bidder(s) of the Notification(s) to Conclude a Framework Agreement(s), as per ITB 41.1, the Procuring Agency shall publish the Conclusion of Framework Agreement Notice which shall contain, at a minimum, the following information:name and address of the Procuring Agency, and if applicable, all participating Purchasers;name and reference number of the Framework Agreement being concluded, and the selection method used;names of all Bidders that submitted Bids, and their Bid prices, or pricing mechanisms, as read out at Bid opening, and as evaluated;names of all Bidders whose Bids were rejected, or were not evaluated, with the reasons therefor;the name(s) of the successful Bidder(s), the duration of Framework Agreement(s), and a summary of its scope; andsuccessful Bidder’s (Bidders’) Beneficial Ownership Disclosure Form.The Conclusion of Framework Agreement Notice shall be published on the Procuring Agency’s website with free access if available, or in at least one newspaper of national circulation in the Procuring Agency’s Country, or in the official gazette.Procurement Related Complaint | The procedures for making a Procurement-related Complaint are as specified in the BDS.Secondary Procurement Process for awarding a Call-off ContractMethod and criteria for award of Call-off Contract | The Secondary Procurement method that shall apply in selecting FA supplier and awarding a Call-off Contract is specified in the Framework Agreement (Framework Agreement, Schedule 3, Secondary Procurement). To be entitled to participate in a Secondary Procurement, and awarded a Call-off Contract, FA Suppliers must continue to be qualified and eligible, and the Goods must continue to be eligible, as per the criteria stipulated in this RFB. The Purchaser may require, at the Secondary Procurement stage and award of Call-off Contract, evidence of continued qualification and eligibility.Adjustment to the Base Price | The Call-off Contract Price at the Secondary Procurement stage shall not be subject to price adjustment unless specified in the Framework Agreement.Section II - Bid Data Sheet (BDS)The following specific data for the Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions in the BDS shall prevail over those in ITB.GeneralITB 1.1 and 1.2 (p) | The Procuring Agency is: Eswatini Electricity CompanyThe Procuring Agency is the agency that will conclude, administer and manage the Framework Agreement, and be the sole Purchaser under the Framework Agreement.”The reference number of the Request for Bids (RFB) is: SZ-ECC-575165-GO-RFBThe name of the RFB is: Supply and Delivery of Distribution Transformers, Electricity Meters and Ready Boards.ITB 1.2 (a) | Electronic –Procurement System- N/AITB 1.2 (l) or (t) | This Primary Procurement will conclude a Single-User Framework Agreement.ITB 1.2 (p) | PurchasersThe Purchaser(s) that are permitted to purchase under the Framework Agreement is:Eswatini Electricity Company Eluvatsini House, Mhlambanyatsi Road,MbabaneITB 1.2 (m) or (u) | Multi-Supplier Framework AgreementThis Primary Procurement intends to conclude a Multi-Supplier Framework Agreement.Framework Agreement panel – minimum number (3)The Procuring Agency intends to conclude a Framework Agreements with a minimum number of Bidders for each range of Call-off quantities.The minimum number (referred to as x) is Three (3).Framework Agreement panel – maximum number (5)The Purchasing Agency, will conclude Framework Agreements for each range of Call-off quantities up to a maximum number of five (5) qualified bidders with substantially responsive bids.The maximum number (referred to as y) of Bidders that the Procuring Agency may conclude Framework Agreements with is five (5).1.2 (w) | Term of Framework AgreementThe Framework Agreement shall be for a Term of three (3) years from the commencement date stated in the Framework Agreement. The initial term may be extended by a maximum of two (2) additional years.ITB 2.1 | The Borrower is: The Government of the Kingdom of Eswatini (GoKe) and Eswatini Electricity Company is the implementing Agency.Loan or Financing Agreement amount: US$ 90 MillionThe name of the Project is: Accelerating Sustainable and Clean Energy Access Transformation in Eswatini (ASCENT Eswatini).ITB 4.1 | The maximum number of members in a Joint Venture (JV) shall be: Two (2).ITB 4.5 | A list of debarred firms and individuals is available on the Bank’s external website: http://www.worldbank.org/debarr.Contents of the RFB DocumentITB 7.1 | For clarification of Bid purposes only, the Procuring Agency’s address is:Attention: Mr Bongani ChaukeAddress: Eluvatsini House, Mhlambanyatsi RoadFloor/ Room number: ReceptionCity: MbabaneCountry: Kingdom of EswatiniTelephone: +268 2409 4165Email address: bongani.chauke@eec.co.sz copied thobeka.gama@eec.co.sz Requests for clarification should be received by the Procuring Agency no later than: 21 December 2026.Web page: www.eec.co.sz and www.esppra.co.szPreparation of BidsITB 10.1 | The language of the Bid is English. “In addition, the RFB document is translated into the English language. All correspondence shall be in English.The language for translation of supporting documents and printed literature is English.ITB 11.1 (h) | The Bidder shall submit the following additional documents in its Bid:Certified copy of valid Trading license for supply of material for local bidders or equivalent for foreign biddersCertificate of incorporation/or equivalent for foreign biddersCertified copy of an official statement of the Directors and alternative directors (i.e. Form ‘J’) or owner/s in the case of unincorporated persons, or equivalent for foreign biddersCertified copy of an official statement of the annual summary of share capital and shares (i.e. Form ‘C’ or equivalent) for incorporated persons, or equivalent for foreign biddersOriginal and valid Tax Compliance Certificate or equivalent for foreign biddersCertified copy of Labour compliance certificate or equivalent for foreign biddersCertified copy of ENPF compliance certificate or Social Security Compliance Certificate for foreign bidders.Power of Attorney or ResolutionITB 14.3 | Multi- Supplier FAThe price to be quoted in the Letter of Bid in accordance with ITB 12.1 shall be the unit bid prices against the range of Call-off quantities, as specified in the Schedule of Prices.ITB 14.6 | The Incoterms edition that will apply to Framework Agreement Call-off Contracts is: CIP-Incoterm 2020ITB 14.7 | Unit Prices in the Price Schedules shall be quoted against indicative range for individual call-off quantities.14.7 a(i), (ii) | Place of destination: Matsapha Central Services Organization - EEC Main Stores, Matsapha.ITB 14.7 (b)(i) | Named place(s) of destination, as per Incoterms used, is Matsapha Central Services Organization (CSO) – EEC Main Stores, Matsapha.ITB 15.1 | The Bidder is required to quote in the currency of the Procuring Agency’s Country the portion of the Bid price that corresponds to expenditures incurred in that currency.ITB 16.4 | Period of time the Goods are expected to be functioning (for the purpose of spare parts): minimum three (3) years following acceptance of the Goods by the Purchaser under a Call-off Contract.ITB 17.2 (a) | Manufacturer’s authorization is required.ITB 17.2 (b) | After sales service is required.ITB 18.1 | The Bid shall be valid until 29 March 2027.ITB 18.3(a) | Where the Bid validity period is extended beyond the original bid validity period plus 56 days, the Bid price shall be adjusted (to determine the FA Base price) by the following factor(s):(1) The local currency portion of the FA Base Price shall be adjusted by a factor reflecting local inflation during the period of extension, and(2) the foreign currency portion of the FA Base Price shall be adjusted by a factor reflecting the international inflation (in the country of the foreign currency) during the period of extension applying Producer Price IndexITB 20.3 | The written confirmation of authorization to sign on behalf of the Bidder shall consist of:A copy of a Power of Attorney or a recorded Resolution taken by the Board of Directors, members, partners or trustees authorizing the representative to submit this bid on the bidder’s behalf must be attached to the Bid Document on submission of same. A bid shall be eligible for consideration only if it bears the signature of the bidder or of some person duly and lawfully authorized to sign it for and on behalf of the bidder.If such a copy of the Power of Attorney or Resolution does not accompany the bid document of the successful bidder, EEC reserves the right to obtain such document after the closing date to verify that the signatory is in order. If no such document can be obtained within a period as specified by EEC, the bid will be disqualified.Submission of BidsITB 21.2 | In addition to the original of the Bid, the number of copies to be delivered to the Procuring Agency is three (3) copies, and one (1) electronic copy on a flash drive.ITB 22.1 | For Bid submission purposes only, the Procuring Agency’s address is:Eswatini Electricity CompanyAttention: Mr. Bongani ChaukeStreet Address: Eluvatsini House, Mhlambanyatsi RoadFloor/ Room number: Reception, Cubicle 1City: Mbabane Country: Kingdom of Eswatini The deadline for Bid submission is: Date: 30 December 2026Time:11.00AMBidders shall not have the option of submitting their Bids electronically.Public Opening of Technical Parts of BidsITB 25.1 | The Bid opening shall take place at:EEC Head OfficeStreet Address: Eluvatsini House, Mhlambanyatsi RoadFloor/ Room number: Reception, Cubicle 1 City: MbabaneCountry: Kingdom of EswatiniDate: 30 December 2026Time: 11.15AMThe electronic Bid opening procedures shall be: N/AITB 25.6 | The Letter of Bid - Technical Part and the sealed envelope marked “Second Envelope - Financial Part” shall be initialed by three (3) representatives of the Procuring Agency conducting Bid opening.G. Evaluation of Technical Parts of BidsITB 30.9 | The weighting to be given for Rated Criteria (including technical and non-price factors) is: 20 %Technical Factor[A1] Weight in percentage[insert weight in%]1. Proposed goods and equipment quality exceeding the minimum specifications and track record of Durability:(i)The proposed materials/equipment quality indicators are significantly exceeding the specified minimums and benefit the purpose or functionality of the supply = (20%)(ii) the proposed materials/equipment are from reputable and industry tested sources and are reliable and durable = (10%) 302. Proposed supply chain risk management(i) supply chain risk nodes are identified and alternative solutions are analysed and practically considered = (10%)(ii) Multiple and reliable sources of supply or manufacturers are availed and reputable deleraship established (5%)153. Delivery Capacity , experience, delivery plan and Lead times(i) the bidder’s capability in terms of financial strength, technical expertise availablity, prior similar contracts’ successful delivery experiences and track record is significantly exceeding the minimum qualification criteria set in this bidding document = (15%)(ii) The bidder’s proposed delivery plans, logistical arrangemnets and proposed shortest lead-time for delivery = (10%)254. Sustainability and risk management capacity, and availability or arrangements for after sales services:(i) The proposed materials/equipment benefit sustainability from social, environmental and economic point of view while compatible with the existing EEC systems and will have minimal operational and disposal costs = (10%)(ii) availability or arrangements for after sales services = (5%) 155. Local labor Job creation potential in terms of Participation or association with local business community, subcontracting, training and knowledge transfer facilitation:(i) The supplier’s proposed local business involvement benefits local employment creation = (10%)(ii) local labour cost proportion exceeding 30% of the labor component of the contract = (5%)15The technical factors (and sub factors if any), which for purposes of this document carry the same meaning as Rated Criteria, and the corresponding scores out of 100% are:1. 30/100 * 20 = 6 2. 15/100 * 20 = 33. 25/100 * 20 =54. 15/100 *20 = 35. 15/100 * 20 = 3 | Technical Factor[A1] | Weight in percentage[insert weight in%] | 1. Proposed goods and equipment quality exceeding the minimum specifications and track record of Durability:(i)The proposed materials/equipment quality indicators are significantly exceeding the specified minimums and benefit the purpose or functionality of the supply = (20%)(ii) the proposed materials/equipment are from reputable and industry tested sources and are reliable and durable = (10%) | 30 | 2. Proposed supply chain risk management(i) supply chain risk nodes are identified and alternative solutions are analysed and practically considered = (10%)(ii) Multiple and reliable sources of supply or manufacturers are availed and reputable deleraship established (5%) | 15 | 3. Delivery Capacity , experience, delivery plan and Lead times(i) the bidder’s capability in terms of financial strength, technical expertise availablity, prior similar contracts’ successful delivery experiences and track record is significantly exceeding the minimum qualification criteria set in this bidding document = (15%)(ii) The bidder’s proposed delivery plans, logistical arrangemnets and proposed shortest lead-time for delivery = (10%) | 25 | 4. Sustainability and risk management capacity, and availability or arrangements for after sales services:(i) The proposed materials/equipment benefit sustainability from social, environmental and economic point of view while compatible with the existing EEC systems and will have minimal operational and disposal costs = (10%)(ii) availability or arrangements for after sales services = (5%) | 15 | 5. Local labor Job creation potential in terms of Participation or association with local business community, subcontracting, training and knowledge transfer facilitation:(i) The supplier’s proposed local business involvement benefits local employment creation = (10%)(ii) local labour cost proportion exceeding 30% of the labor component of the contract = (5%) | 15Technical Factor[A1] | Weight in percentage[insert weight in%]1. Proposed goods and equipment quality exceeding the minimum specifications and track record of Durability:(i)The proposed materials/equipment quality indicators are significantly exceeding the specified minimums and benefit the purpose or functionality of the supply = (20%)(ii) the proposed materials/equipment are from reputable and industry tested sources and are reliable and durable = (10%) | 302. Proposed supply chain risk management(i) supply chain risk nodes are identified and alternative solutions are analysed and practically considered = (10%)(ii) Multiple and reliable sources of supply or manufacturers are availed and reputable deleraship established (5%) | 153. Delivery Capacity , experience, delivery plan and Lead times(i) the bidder’s capability in terms of financial strength, technical expertise availablity, prior similar contracts’ successful delivery experiences and track record is significantly exceeding the minimum qualification criteria set in this bidding document = (15%)(ii) The bidder’s proposed delivery plans, logistical arrangemnets and proposed shortest lead-time for delivery = (10%) | 254. Sustainability and risk management capacity, and availability or arrangements for after sales services:(i) The proposed materials/equipment benefit sustainability from social, environmental and economic point of view while compatible with the existing EEC systems and will have minimal operational and disposal costs = (10%)(ii) availability or arrangements for after sales services = (5%) | 155. Local labor Job creation potential in terms of Participation or association with local business community, subcontracting, training and knowledge transfer facilitation:(i) The supplier’s proposed local business involvement benefits local employment creation = (10%)(ii) local labour cost proportion exceeding 30% of the labor component of the contract = (5%) | 15Notification of Evaluation of Technical Parts and Public Opening of Financial Parts of BidsITB 31.5 | The Letter of Bid – Financial Part and the Price Schedules shall be initialed by three (3) representatives of the Procuring Agency conducting Bid opening.Evaluation of Financial Part of BidsITB 32.2 | The consideration of other factors during the evaluation, in addition to the Bid Price quoted, include the factors set out below as more fully described in Section III, Evaluation and Qualification Criteria:Life cycle costs: the costs during the life of the Goods or equipment No. The performance and productivity of the equipment offered; NoITB 34.1 | The currency that shall be used for Bid evaluation and comparison purposes to convert, at the selling exchange rate, all Bid prices expressed in various currencies into a single currency is Lilangeni. The source of exchange rate shall be The Central Bank of Eswatini.The date for the exchange rate shall be 30 December 2026.Evaluation of Combined Technical and Financial Parts and Notification of Intention to Conclude A Framework AgreementITB 37.1 | The weight to be given for cost is: 80%Conclusion of a Framework AgreementITB 45 | Signing the Framework AgreementThe Bidder shall sign, date and return the Framework Agreement within Twenty- Eight (28) days of receipt of the same.ITB 47 | The procedures for making a Procurement-related Complaint are detailed in Annex III of the Procurement Regulations for IPF Borrowers. If a Bidder wishes to make a Procurement-related Complaint, the Bidder shall submit its complaint in writing (by the quickest means available, that is either by email or fax), to:For the attention: Mr Mphumuzi MaziyaTitle/position: Managing DirectorProcuring Agency: Eswatini Electricity CompanyEmail address: mphumuzi.maziya@eec.co.sz copied bongani.chauke@eec.co.szA copy of the complaint can be sent for the Bank’s information and monitoring to: pprocurementcomplaints@worldbank.orgIn summary, a Procurement-related Complaint may challenge any of the following:the Procuring Agency’s Bidding Documents; andthe Procuring Agency’s decision to exclude a Bidder from the procurement process prior to the decision to conclude a Framework Agreement(s).the Procuring Agency’s decision to conclude a Framework Agreement(s).Section III - Evaluation and Qualification CriteriaThis Section contains the criteria that the Procuring Agency shall use to conclude a Framework Agreement(s). The criteria and methodology described is to evaluate Bids and qualify Bidders. No other factors, methods or criteria shall be used other than specified in this RFB document for the Primary Procurement process.ContentsTECHNICAL PART. 501. Qualification Criteria (ITB 30.6) 502. Technical Evaluation (ITB 30.9) 51FINANCIAL PART. 52COMBINED EVALUATION.. 53Criteria to conclude a Framework Agreement(s) (ITB 40) 54TECHNICAL PART• Qualification Criteria (ITB 30.6)The Procuring Agency shall assess each Bid against the following Qualification Criteria. Requirements not included in the text below shall not be used in the evaluation of the Bidder’s qualifications.• Financial Capability: The Bidder shall submit audited financial statements or, if not required by the law of the Bidder’s country, other financial statements acceptable to the Procuring Agency, for the last three (3) years prior to bid submission deadline, demonstrating the current soundness of the Bidder’s financial position. For a joint venture, this requirement shall be met by each member;Minimal annual turnover and Cashflow requirementCategory | Description | Minimum annual turnover, in US$ | Cashflow requirement, in US$1. | Transformers | 1,000,000 | 100,0002. | Minisubs | 2,000,000 | 200,0003. | Ring Main Units | 2,000,000 | 200,0004. | Meters, Metering Equipment and Ready Boards | 2,000.000 | 200,000• Specific Experience: The Bidder shall demonstrate that it has successfully completed at least two (2) contracts per line item tendered for within the last Eight (8) years prior to bid submission deadline, each with a minimum value similar to the turnover required or less than two (2) contracts but with total value minimum twice of the turnover requirement of tendered item(s) or at least equal to the value of bid prices of tendered items that have been successfully and substantially completed that are similar in nature and complexity to the goods it offers to supply and the related services. For a joint venture, this requirement may be met by all members combined, but different contract values will not be aggregated to achieve the minimum value of requires contract experience.• Documentary Evidence The Bidder shall furnish documentary evidence to demonstrate that the goods that it offers to supply meet the following usage requirement:• SABS/SANS, BS, IEC approved material/ equivalent standard as per the Section VII – Schedule of Requirements• Manufacturing experience and Technical Capacity: For the goods that the bidder is a manufacturer, the Bidder shall furnish documentary evidence to demonstrate that:• it has manufactured goods of similar nature and complexity for at least three (3) years, prior to the bid submission deadline; and• its annual production capacity of goods of similar nature and complexity for each of the last three (3) years prior to the bid submission deadline, is at least three (3) times the specified quantities.• Manufacturer’s authorization: A Bidder who does not manufacture an item/s where a manufacturer authorization is required in accordance with BDS ITB 17.2 (a), the Bidder shall provide evidence of being duly authorized by a manufacturer (Manufacturer’s Authorization Form, Section IV, Bidding Forms), meeting the criteria in (d) (i) and (ii) above, to supply the Goods;• A Bidder who does who does not manufacture an item/s where a manufacturer authorization is not required in accordance with BDS ITB 17.2 (a), the bidder shall submit documentation on, its status as a supplier, to the satisfaction of the Procuring Agency (e.g. authorized dealer/ distributor of the items).At the time of conclusion of Framework Agreement and subsequently at the time of Call-off Contract, the Bidder (including each subcontractor proposed by the Bidder) shall not be subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.• Technical Evaluation (ITB 30.9)Assessment of adequacy of Technical Part with the requirements...............................................................................................................a. Moderate/Low Procurement Risk and High Value between 10% to 30% .Technical Part Scoring MethodologyDescription | MarksProposed goods and equipment quality exceeding the minimum specifications and track record of durabilityProposed goods and equipment quality exceeding the minimum specifications and track record of Durability – 10 ptsThe proposed materials/equipment quality indicators are significantly exceeding the specified minimums and benefit the purpose or functionality of the supply – 15 ptsThe proposed materials/equipment are from reputable and industry tested sources and are reliable and durable – 5 pts(Scoring based on proportion of the total number of items proposed) | 30Proposed Supply Chain Risk ManagementSupply chain risk nodes are identified and alternative solutions are analysed and practically considered – 10 ptsMultiple and reliable sources of supply or manufacturers are availed and reputable deleraship established – 5 pts | 15Delivery Capacity, experience & Lead TimesThe bidder’s capability in terms of financial strength, technical expertise availablity, prior similar contracts’ successful delivery experiences and track record is significantly exceeding the minimum qualification criteria set in this bidding document – 15 ptsThe bidder’s proposed delivery plans, logistical arrangemnets and proposed shortest lead-time for delivery – 10 pts | 25Sustainability and risk management capacity and availability or arrangements for after sales services The proposed materials/equipment benefit sustainability from social, environmental and economic point of view while compatible with the existing EEC systems and will have minimal operational and disposal costs – 10 pts Availability or arrangements for after sales services – 5 pts | 15Local labor Job creation potential in terms of Participation or association with local business community, subcontracting, training and knowledge transfer facilitation:The supplier’s proposed local business involvement benefits local employment creation - 10 ptsLocal labour cost proportion exceeding 30% of the labor component of the contract – 5 pts | 15The score for each sub- factor (i) within a factor (j) will be combined with the scores of sub- factors in the same factor as a weighted sum to form the Factor Technical Score using the following formula:where:tji = the technical score for sub- factor “i” in factor “j”,wji = the weight of sub- factor “i” in factor “j”,k = the number of scored sub-factors in factor “j”, andThe Factor Technical Scores will be combined in a weighted sum to form the total Technical Bid Score using the following formula:where:Sj = the Factor Technical Score of factor “j”,Wj = the weight of factor “j” as specified in the BDS,n = the number of Factors, andFINANCIAL PARTThe Procuring Agency’s evaluation of the Financial Part may take into account, in addition to the Bid Price quoted in accordance with ITB 14, one or more of the following factors as specified in BDS ITB 32.2, using the following criteria and methodologies.• Life Cycle Costs – N/ACOMBINED EVALUATIONThe Procuring Agency will evaluate and compare the Bids that have been determined to be substantially responsive.The Procuring Agency’s evaluation of responsive Bids will take into account technical factors, in addition to cost factors.An Evaluated Bid Score (B) will be calculated for each responsive Bid using the following formula (for comparison in percentages), which permits a comprehensive assessment of the Bid price and the technical merits of each Bid:whereC = Evaluated Bid PriceC low = the lowest of all Evaluated Bid Prices among responsive BidsT = the total Technical Score awarded to the BidThigh = the Technical Score achieved by the Bid that was scored best among all responsive BidsX = weight for the Cost as specified in the BDSThe Bid with the best evaluated Bid Score (B) among responsive Bids shall be the Most Advantageous Bid provided that the Bidder possesses the required qualifications.Criteria to conclude a Framework Agreement(s) (ITB 40)Criteria for a Multi-Supplier Framework Agreement:The Procuring Agency will conclude Framework Agreements as follows;• All Bidders shall be ranked in terms of the Most Advantageous Bid/Bids, with the first ranked being the Most Advantageous, the second ranked being the second Most Advantageous, and so on.• The Procuring Agency will conclude a FA with:All the Bidders ranked in (a) above if no maximum number of suppliers is specified in BDS ITB 1.2 (m)the Bidders ranked first up to the maximum number of suppliers (y) specified in the BDS ITB 1.2 (m).• If the number of Bidders is less than the minimum (x) specified in the BDS ITB 1.2 (m), the Procuring Agency may decide to invite new bids. Alternatively, the Procuring Agency may conclude the FA with all those Bidders where, an insufficient number of Bids are received, or an insufficient number of Bids meet the criteria for conclusion of Framework Agreements.Section IV - Bid FormsTable of FormsLetter of Bid- Technical Part 57Technical Bid Checklist 61Functional Guarantees. 62Manufacturer’s Authorization. 63Bidder Information Form.. 64Bidder’s JV Members Information Form.. 65Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment Performance Declaration. 66Letter of Bid- Financial Part 67Price Schedule Forms. 69Price Schedule: Goods manufactured outside the Procuring Agency’s Country, to be imported [Option 1] 70Price Schedule: Goods to be supplied from within the Procuring Agency’s Country [Option 1]. 71Price Schedule: Goods manufactured outside the Procuring Agency’s Country, to be imported [Option 2]. 72FA- Price Schedule: Goods to be supplied from within the Procuring Agency’s Country [Option 2]. 73Price Schedule Summary. 75Beneficial Ownership Disclosure Form.. 76Letter of Bid- Technical PartPrimary Procurement - Framework Agreement GoodsINSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENTThe Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder’s complete name and business address.Note: All italicized text is to help Bidders in preparing this form.Framework Agreement - GoodsDate of this Bid submission: [insert date (as day, month and year) of Bid submission]Request for Bid No.: [insert identification]To: [insert complete name of Procuring Agency]We, the undersigned Bidder, hereby submit our Bid, in two parts, namely:• the Technical Part, andthe Financial Part.In submitting our Bid we make the following declarations:• No reservations: We have examined and have no reservations to the RFB document, including addenda issued in accordance with Instructions to Bidders (ITB 8);• Eligibility: We meet the eligibility requirements and have no conflict of interest in accordance with ITB 4;• Eligible Goods and Related Services: If we conclude a Framework Agreement, the Goods and Related Services that we may supply under a Call-off Contract awarded under the Framework Agreement, shall be sourced from an eligible country in accordance with ITB 5 and Section V, Eligible Countries. The Goods and Related Services shall be sourced from [insert name of the country(ies)]• Bid/Proposal-Securing Declaration: [select OPTION 1 or 2 as applicable]OPTION 1“We have neither been suspended nor declared ineligible by the Purchaser(s) based on execution of a Bid-Securing Declaration or Proposal-Securing Declaration in the Purchaser’s Country in accordance with ITB 4.7” orOPTION 2“We have been suspended or declared ineligible by the following entities based on execution of a Bid-Securing Declaration or Proposal-Securing Declaration in the Purchaser’s Country in accordance with ITB 4.7 [insert name of entities]”;• Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH): [select the appropriate option from (i) to (iii) below and delete the others. In case of JV members and/or subcontractors, indicate the status of disqualification by the Bank of each JV member and/or subcontractor].We, including any of our subcontractors:• [have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]• [are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]• [had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations, and were removed from the disqualification list. An arbitral award on the disqualification case has been made in our favor.]• Conformity: We offer to supply, in conformity with the RFB document and in accordance with Section VII- Schedule of Requirements, the following Goods: [insert a brief description of the Goods and Related Services];• Bid Validity Period: Our Bid shall be valid until [insert day, month and year in accordance with ITB 18.1], and it shall remain binding upon us and may be accepted at any time before the expiration of that period;• Performance Security: If our Bid is accepted and we conclude a Framework Agreement, we understand that we may be required, as a condition of a subsequent Call-off Contract, to obtain a performance security;• One Bid per Bidder: We are not submitting any other Bid(s) as an individual Bidder, and we are not participating in any other Bid(s) as a Joint Venture member, or as a subcontractor, and meet the requirements of ITB 4.3;• Suspension and Debarment: We, along with any of our subcontractors, suppliers, consultants, manufacturers, or service providers for any part of the contract, are not subject to, and not controlled by any entity or individual that is subject to, a temporary suspension or a debarment imposed by the World Bank Group or a debarment imposed by the World Bank Group in accordance with the Agreement for Mutual Enforcement of Debarment Decisions between the World Bank and other development banks. Further, we are not ineligible under the Procuring Agency’s Country laws or official regulations or pursuant to a decision of the United Nations Security Council;• State-owned enterprise or institution: [select the appropriate option and delete the other] [We are not a state-owned enterprise or institution] / [We are a state-owned enterprise or institution but meet the requirements of ITB 4.6];• Not Bound to Purchase: We understand that there is no obligation on the Procuring Agency/Purchaser(s) to purchase any Goods, and/or Related Services from any FA Supplier during the Term of the Framework Agreement.• No expectation of Call-off Contract: We confirm that no undertaking or any form of statement, promise, representation or obligation has been made by the Procuring Agency/Purchaser in respect of the total quantities or value of the Goods that may be ordered by it, or any participating Purchaser(s), in accordance with this Framework Agreement. We acknowledge and agree that we have not submitted this Bid on the basis of any such undertaking, statement, promise or representation. If we conclude a Framework Agreement, we have no legitimate expectation of being awarded a Call-off Contract under the Framework Agreement.• Not Bound to Accept: In relation to this Primary Procurement, we understand that you are not bound to accept any Bid that you may receive.• Fraud and Corruption: We hereby certify that we have taken steps to ensure that no person acting for us or on our behalf engages in any type of Fraud and Corruption.Name of the Bidder: *[insert complete name of the Bidder]Name of the person duly authorized to sign the Bid on behalf of the Bidder: **[insert complete name of person duly authorized to sign the Bid]Title of the person signing the Bid: [insert complete title of the person signing the Bid]Signature of the person named above: [insert signature of person whose name and capacity are shown above]Date signed [insert date of signing] day of [insert month], [insert year]* In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder.** Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules.Technical PartThe technical bid shall include all relevant information required to evaluate the technical Part in accordance with the requirements.To establish the conformity of the Goods and Related Services to the RFB document, the Bidder shall furnish the documentary evidence that the Goods conform to the technical specifications and standards, including any essential technical and performance characteristics specified in Section VII, Schedule of Requirements. Any required functional guarantees shall also be provided. The attached forms/format may support the Bidder to organize information required to present its technical bid.The documentary evidence may be in the form of literature, drawings or data, and shall consist of a detailed item by item description of the essential technical and performance characteristics of the Goods and Related Services, demonstrating substantial responsiveness of the Goods and Related Services to the technical specification, and if applicable, a statement of deviations and exceptions to the provisions of the Section VII, Schedule of Requirements.In the interest of timely bid evaluation and conclusion of framework agreement, Bidders are encouraged not to overload the supporting materials with documents that do not directly address the Purchaser’s requirements.The Bidder shall also furnish a list giving full particulars, including available sources and current prices of spare parts, special tools, etc., necessary for the proper and continuing functioning of the Goods during the period specified in the BDS following commencement of the use of the goods by the Purchaser.Standards for workmanship, process, material, and equipment, as well as references to brand names or catalogue numbers specified by the Purchaser in the Schedule of Requirements, are intended to be descriptive only and not restrictive. The Bidder may offer other standards of quality, brand names, and/or catalogue numbers, provided that it demonstrates, to the Purchaser’s satisfaction, that the substitutions ensure substantial equivalence or are superior to those specified in the Section VII, Schedule of Requirements.If there are assessed supply chain risks, the technical bid must include proposed supply chain risk management plan.The Manufacture’s Authorizations shall be included in accordance with ITB BDS 17.2 (a) and the attached Manufacturer’s Authorization form.Technical Bid ChecklistTechnical.RequirementNo. _ | Technical Requirement:[ insert: description of requirement ]Bidder’s technical bid/ compliance:Bidder’s cross references to supporting information in the Technical Bid:Functional Guarantees(to be used as applicable)The Bidder shall copy in the left column of the table below; the identification of each functional guarantee required in the Specification and in the right column, provides the corresponding value for each functional guarantee of the proposed Goods.Required Functional Guarantee | Value of Functional Guarantee of the Goods1.2.3....Manufacturer’s Authorization[The Bidder shall require the Manufacturer to fill in this Form in accordance with the instructions indicated. This letter of authorization should be on the letterhead of the Manufacturer and should be signed by a person with the proper authority to sign documents that are binding on the Manufacturer. The Bidder shall include it in its Bid, if so indicated in the BDS.]Date: [insert date (as day, month and year) of Bid submission]RFB No.: [insert number of RFB process]To: [insert complete name of Purchaser]WHEREASWe [insert complete name of Manufacturer], who are official manufacturers of [insert type of goods manufactured], having factories at [insert full address of Manufacturer’s factories], do hereby authorize [insert complete name of Bidder] to submit a Bid the purpose of which is to provide the following Goods, manufactured by us [insert name and or brief description of the Goods], and to subsequently sign a Framework Agreement permitting them to enter into Call-off Contracts for the supply of the Goods.We hereby extend our full guarantee and warranty in accordance with FAP 11 of the Framework Agreement, with respect to the Goods offered by the above firm.We confirm that we do not engage or employ forced labor or persons subject to trafficking or child labor, in accordance with FAP 4 of the Framework Agreement.Signed: [insert signature(s) of authorized representative(s) of the Manufacturer]Name: [insert complete name(s) of authorized representative(s) of the Manufacturer]Title: [insert title]Dated on ____________ day of __________________, _______ [insert date of signing]Bidder Information FormPrimary Procurement - Framework Agreement Goods[The Bidder shall fill in this Form in accordance with the instructions indicated below. No alterations to its format shall be permitted and no substitutions shall be accepted.]Date: [insert date (as day, month and year) of Bid submission]RFB No.: [insert number of RFB process]Page ________ of_ ______ pages1. Bidder’s Name [insert Bidder’s legal name]2. In case of JV, legal name of each member: [insert legal name of each member in JV]3. Bidder’s actual or intended country of registration: [insert actual or intended country of registration]4. Bidder’s year of registration: [insert Bidder’s year of registration]5. Bidder’s Address in country of registration: [insert Bidder’s legal address in country of registration]6. Bidder’s Authorized Representative Information Name: [insert Authorized Representative’s name] Address: [insert Authorized Representative’s Address] Telephone/Fax numbers: [insert Authorized Representative’s telephone/fax numbers] Email Address: [insert Authorized Representative’s email address]7. Attached are copies of original documents of [check the box(es) of the attached original documents] ̈ Articles of Incorporation (or equivalent documents of constitution or association), and/or documents of registration of the legal entity named above, in accordance with ITB 4.4. ̈ In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1. ̈ In case of state-owned enterprise or institution, in accordance with ITB 4.6 documents establishing:Legal and financial autonomyOperation under commercial lawEstablishing that the Bidder is not under the supervision of the Procuring Agency or Purchaser8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder (s) shall provide additional information on beneficial ownership, using the Beneficial Ownership Disclosure Form.Bidder’s JV Members Information FormPrimary Procurement - Framework Agreement Goods[The Bidder shall fill in this Form in accordance with the instructions indicated below. The following table shall be filled in for the Bidder and for each member of a Joint Venture]].Date: [insert date (as day, month and year) of Bid submission]RFB No.: [insert number of RFB process]Page ________ of_ ______ pages1. Bidder’s Name: [insert Bidder’s legal name]2. Bidder’s JV Member’s name: [insert JV’s Member legal name]3. Bidder’s JV Member’s country of registration: [insert JV’s Member country of registration]4. Bidder’s JV Member’s year of registration: [insert JV’s Member year of registration]5. Bidder’s JV Member’s legal address in country of registration: [insert JV’s Member legal address in country of registration]6. Bidder’s JV Member’s authorized representative informationName: [insert name of JV’s Member authorized representative]Address: [insert address of JV’s Member authorized representative]Telephone/Fax numbers: [insert telephone/fax numbers of JV’s Member authorized representative]Email Address: [insert email address of JV’s Member authorized representative]7. Attached are copies of original documents of [check the box(es) of the attached original documents] ̈ Articles of Incorporation (or equivalent documents of constitution or association), and/or registration documents of the legal entity named above, in accordance with ITB 4.4. ̈ In case of a state-owned enterprise or institution, documents establishing legal and financial autonomy, operation in accordance with commercial law, and that they are not under the supervision of the Procuring Agency or Purchaser, in accordance with ITB 4.6.8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership. The successful Bidder (s) shall provide additional information on beneficial ownership, using the Beneficial Ownership Disclosure Form.Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment Performance Declaration[The following table shall be filled in by the Bidder, each member of a Joint Venture and each subcontractor proposed by the Bidder]Bidder’s Name: [insert full name]Date: [insert day, month, year]Joint Venture Member’s or Subcontractor’s Name: [insert full name]RFB No. and title: [insert RFB number and title]Page [insert page number] of [insert total number] pagesSEA and/or SH Declaration in accordance with Section III, Qualification Criteria, and RequirementsWe: ̈ (a) have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations ̈ (b) are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations ̈ (c) had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations, and were removed from the disqualification list. An arbitral award on the disqualification case has been made in our favor.[If (c) above is applicable, attach evidence of an arbitral award reversing the findings on the issues underlying the disqualification.]Letter of Bid- Financial PartPrimary Procurement - Framework Agreement GoodsINSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE DOCUMENTThe Bidder must prepare this Letter of Bid on stationery with its letterhead clearly showing the Bidder’s complete name and business address.Note: All italicized text is to help Bidders in preparing this form.Framework Agreement - GoodsDate of this Bid submission: [insert date (as day, month and year) of Bid submission]Request for Bid No.: [insert identification]To: [insert complete name of Procuring Agency]We, the undersigned Bidder, hereby submit the second part of our Bid, the Financial Part• Bid Validity Period: Our Bid shall be valid until [insert day, month and year in accordance with ITB 18.1], and it shall remain binding upon us and may be accepted at any time before the expiration of that period;• Bid Price: The total unit price/s of our Bid excluding any discounts offered in item (c) below is as provided in the attached Price Schedule Summary.• Unconditional Discounts: The unconditional discounts offered are: [Specify in detail each unconditional discount offered.]The exact method of calculations to determine the net price after application of unconditional discounts is shown below: [Specify in detail the method that shall be used to apply the discounts];• Commissions, gratuities, fees: We have paid, or will pay the following commissions, gratuities, or fees with respect to the RFB process or the Framework Agreement: [insert complete name of each Recipient, its full address, the reason for which each commission or gratuity was paid and the amount and currency of each such commission or gratuity]Name of Recipient | Address | Reason | Amount(If none has been paid or is to be paid, indicate “none.”)Name of the Bidder: *[insert complete name of the Bidder]Name of the person duly authorized to sign the Bid on behalf of the Bidder: **[insert complete name of person duly authorized to sign the Bid]Title of the person signing the Bid: [insert complete title of the person signing the Bid]Signature of the person named above: [insert signature of person whose name and capacity are shown above]Date signed [insert date of signing] day of [insert month], [insert year]* In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder.** Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules.Price Schedule FormsThe Bidder shall fill in these Price Schedule Forms in accordance with the instructions indicated. The list of line items in column 1 of the Price Schedules shall coincide with the List of Goods and Related Services specified by the Procuring Agency in the Schedule of Requirements.Price SchedulesPrice Schedule: Goods manufactured outside the Procuring Agency’s Country, to be imported [Option 1][Quantities based on call-off indicative quantities]Date: _________________________RFB No: _____________________Page N° ______ of ______1 | 2 | 3 | 4 | 5 | 6LineItemN° | Description of Goods | Country of Origin | Indicative Delivery Period as defined by Incoterms | Indicative Quantity and physical unit per individual Call-off | Unit price cip [insert named place of destination], in accordance with ITB 14.7 (b)Minimum | Maximum[insert number of the item] | [insert name of Goods] | [insert country of origin ofthe Goods] | [insert Delivery Period] | [insert number of units to be supplied and name of the physical unit] | [insert number of units to be supplied and name of the physical unit | [insert price per unit]Name of Bidder [insert complete name of Bidder] Signature [signature of person authorized to sign the Bid] Date [insert date]Note to the Procuring Agency:• Information for columns 1, 2, 4 (indicative), and 5 (indicative) to be inserted by the Procuring Agency.• If the items comprise of sub-items, insert the corresponding sub-item information.Price Schedule: Goods to be supplied from within the Procuring Agency’s Country [Option 1] – N/A[Quantities based on call-off indicative quantities]Date: _________________________RFB No: _____________________Page N° ______ of ______1 | 2 | 3 | 4 | 5 | 6Line Item No. | Description of Goods | Country of Origin (for already imported Goods) | IndicativeDelivery Period as defined by Incoterms | Indicative Quantity and physical unit per individual Call-off | Unit price EXW (plus prices to deliver to place of destination, if required), in accordance with ITB 14.7 a (i) or (ii)Minimum | Maximum[insert number of the item] | [insert name of Goods] | [insert Delivery Period] | [insert number of units to be supplied and name of the physical unit] | [insert number of units to be supplied and name of the physical unit] | [insert price per unit]]Name of Bidder [insert complete name of Bidder] Signature [signature of person authorized to sign the Bid] Date [insert date]Note to the Procuring Agency:• Information for columns 1, 2, 4 (indicative), and 5 (indicative) to be inserted by the Procuring Agency.• If the items comprise of sub-items, insert the corresponding sub-item information.Price Schedule: Goods manufactured outside the Procuring Agency’s Country, to be imported [Option 2][Quantities based on estimated quantity over FA Period]Date: _________________________RFB No: _____________________Page N° ______ of ______1 | 2 | 3 | 4 | 5 | 6LineItemN° | Description of Goods | Country of Origin | Indicative Delivery Period as defined by Incoterms | Estimated Quantity over FA period and physical unit | Unit price cip [insert named place of destination], in accordance with ITB 14.7 (b)1. | Transformer, 16kVA, 11kV/231VSingle PhaseCeramic/Cycloaliphatic Open Type Bushings With 31mm/kV CreepageContinuous kVA Rating: 16kVAVoltage Rating: 11kV / 240VTaps: 0%, 3%, 6% (Boost) BIL: 95kVNo Loss: 49W & Load Loss: 320WFor single pole mounting with skid under-baseLifting LugsCooling: ONANInsulation Fluid: Mineral Oil, PCB FreeTank Material: Mild SteelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings Material: copper/AluminiumWinding Insulation Material: Resin and Paper | 9002. | Transformer, 50kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 50kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL:No load loss: 110W & full load loss: 880WFor H-frame pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environmentsLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 3503. | Transformer, 100kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 100kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL:No load loss: 190W & full load loss: 1500WFor H-frame pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environmentsLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 504. | Transformer, 200kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 200kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL:No load loss: 320W & full load loss: 2600WFor platform pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environmentsSupplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: resin and paper | 405. | Transformer, 315kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 315kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6%BIL:No load loss: 450W & full load loss: 3600WFor H-frame pole mountingExterior coating prepared for use in non-corrosive environmentsSupplied with lv flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green / GA35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 106 | Transformer, 500kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 500kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6%BIL:No load loss: 630W & full load loss: 5200WFor platform mounting with jacking padsSupplied surge arrester brackets and earthing terminalSupplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green / G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 57. | Transformer, 630kVA, 11kV/415vVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 630kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: 95kVNo load loss: 750W & full load loss: 6200WFor platform mounting with jacking padsSupplied surge arrester bracketsSupplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws),2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: Mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 58. | Transformer, 800kVA, 11kV/415VVector group: dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 800kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL:No load loss: 900W & full load loss: 7500WFor platform mounting with jacking padsExterior coating prepared for use in non-corrosive environmentsSupplied with LV flags with 2 holes fitted with a M12x40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: mild steelCoating: C12 avocado green/G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | 69. | Set of unit-to-unit busbars; for Ring Main Unit extensible switches | 7010. | Minisub; minisub 315kVA 11000/400V minisub with RMU | 1711. | Minisub; minisub 400kVA 11000/400V minisub with RMU | 312. | Minisub; minisub 500kVA 11000/400V minisub with RMU | 1013. | Minisub; minisub 630kVA 11000/400V minisub with RMU | 1114. | Minisub; minisub 800kVA 11000/400VV minisub with RMU | 1015. | RMU busbars end boxes or covers; for ring main unit extensible switches | 1516. | K1 ring main unit 12kV outdoor; unfused oil switch, pedestaled with operating handle, oil tins. | 6317. | K1af ring main unit 12kV outdoor; Alstom type fused oil switch, pedestalled with operating handle | 6818. | K1 unfused isolator ring main unit; extensible oil fuse switch fuse, 12kV suitable for outdoor inland use. | 2019. | Ring main unit K4/AF; RMU non-extensible oil switch fuse and isolator RMU 12kV, 50Hz, 630A current rating to both switch and busbar to IEC 60420 (1990) | 1520 | Ring main unit; ring main unit extensible single fused switch T1/of [GEC] x1F | 1021. | Single Phase DIN Rail PLC Split Smart Meter with CIUNetwork: 1P2W; 230V; 5(80)A; 50HzMeasurement: kWh +/-; kvarhAccuracy: Class 1Modes: Basic STS kWh, Postpaid with TOUBilling: Energy and Maximum Demand with Time of Use (TOU) or PREPAID modeLoad Profile: 8 ChannelSmart Functions: Prepaid or Postpaid Modes, Remote Disconnect, Load Limiting, Anti Tamper, Modular Communication options, Firmware UpgradableCommunications: Uplink Modules: G3-PLC to DCU, 4G (point to point, with modem), Ethernet or WIFI, G3 PLC CIUStandards: STS; DLMS/COSEM; IEC 62055-31, NRS049, IDIS, G3-PLC | 3500022. | Three-Phase Smart Meter SpecificationsNetwork: 3P4W; 230V; 5(100)A; 50Hz | 500Measurement: kWh +/-; kvarh; KVAAccuracy: Class 1Modes: Basic STS kWh, Postpaid with TOUBilling: Energy and Maximum Demand with Time of Use (TOU) or PREPAID modeLoad Profile: 8 ChannelSmart Functions: Prepaid or Postpaid Modes, Remote Disconnect, Load Limiting, Anti Tamper, Modular Communication options, Firmware UpgradableCommunications: Uplink Modules: G3-PLC to DCU, 4G (point to point, with modem), Ethernet or WIFI, G3 PLC CIUStandards: STS; DLMS/COSEM; IEC 62055-31, NRS049, IDIS, G3-PLC23. | Distribution ready b0ard, 120 x 260 x 300mm, complete with 1 x 63A earth leakage, 1 x 20A mains, 1 x 15A breaker, 1 x 5A breaker, 16A double 3 pin socket, 6A euro socket, bulkhead and globe, SANS 10142-1 | 60024. | Meter box, 300 x 300 x 1225 mm, 3 x 20mm knockout on the base for conduit, lockable and fitted with masonite board, metal grey galvanized, SANS | 250Name of Bidder [insert complete name of Bidder] Signature [signature of person authorized to sign the Bid] Date [insert date]Note to the Procuring Agency:• Information for columns 1, 2, 4 (indicative), and 5 (indicative) to be inserted by the Procuring Agency.• If the items comprise of sub-items, insert the corresponding sub-item information.FA- Price Schedule: Goods to be supplied from within the Procuring Agency’s Country [Option 2]- N/A[Quantities based on estimated quantity over FA Period]Date: _________________________RFB No: _____________________Page N° ______ of ______1 | 2 | 3 | 4 | 5 | 6Line Item No. | Description of Goods | Country of Origin (for already imported Goods) | IndicativeDelivery Period as defined by Incoterms | Estimated Quantity over FA period and physical unit | Unit price EXW (plus price to deliver to place of destination, if required), in accordance with ITB 14.7 a (i) or (ii)[insert number of the item] | [insert name of Goods] | [insert Delivery Period] | [insert number of units to be supplied and name of the physical unit] | [insert price per unit]Name of Bidder [insert complete name of Bidder] Signature [signature of person authorized to sign the Bid] Date [insert date]Note to the Procuring Agency:• Information for columns 1, 2, 4 (indicative), and 5 (indicative) to be inserted by the Procuring Agency.• If the items comprise of sub-items, insert the corresponding sub-item information.Price for Related Services and Completion Schedule[ If applicable]Date: _________________________RFB No: _____________________Page N° ______ of ______1 | 2. | 4 | 5 | 6 | 7Item No. | Item Description | Description of Services (excludes inland transportation and other Related Services required in the Procuring Agency’s Country to convey the Goods to their final destination) | Country of Origin | Related Service Completion Period | Unit price[insert item number] | [Insert name of Goods] | [insert name of Service] | [insert country of origin of the Services] | [insert Related Service Completion Period per item] | [insert unit price]Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person authorized to sign the Bid] Date [insert date]Price Schedule SummaryDate: _________________________RFB No: _____________________Page N° ______ of ______1 | 2 | 4 | 5 | 6 | 7Item No | Description of Goods | Unit price EXW (plus prices to deliver to place of destination, if required) | Unit price CIP (named place of destination) | Unit Price Related Services | Total Unit Price ((4+6) or (5+6), as applicable)[insert Item No.] | [insert name of Goods] | [insert unit price] | [insert unit price] | [insert total unit price]Name of Bidder [insert complete name of Bidder]Signature of Bidder [signature of person authorized to sign the Bid]Date [insert date]INSTRUCTIONS TO BIDDERS: DELETE THIS BOX ONCE YOU HAVE COMPLETED THE FORMThis Beneficial Ownership Disclosure Form (“Form”) is to be completed by the successful Bidder(s). In case of joint venture, the Bidder must submit a separate Form for each member. The beneficial ownership information to be submitted in this Form shall be current as of the date of its submission. For the purposes of this Form, a Beneficial Owner of a Bidder is any natural person who ultimately owns or controls the Bidder by meeting one or more of the following conditions: directly or indirectly holding 25% or more of the sharesdirectly or indirectly holding 25% or more of the voting rightsdirectly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the BidderBeneficial Ownership Disclosure FormRFB No.: [insert number of RFB process]Request for Bid No.: [insert identification]To: [insert complete name of procuring Agency]In response to your request in the Letter of Acceptance dated [insert date of letter of Acceptance] to furnish additional information on beneficial ownership: [select one option as applicable and delete the options that are not applicable](i) we hereby provide the following beneficial ownership information.Details of beneficial ownershipIdentity of Beneficial Owner | Directly or indirectly holding 25% or more of the shares(Yes / No) | Directly or indirectly holding 25 % or more of the Voting Rights(Yes / No) | Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent governing body of the Bidder(Yes / No)[include full name (last, middle, first), nationality, country of residence]OR(ii) We declare that there is no Beneficial Owner meeting one or more of the following conditions:• directly or indirectly holding 25% or more of the shares• directly or indirectly holding 25% or more of the voting rights• directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the BidderOR(iii) We declare that we are unable to identify any Beneficial Owner meeting one or more of the following conditions. [If this option is selected, the Bidder shall provide explanation on why it is unable to identify any Beneficial Owner]• directly or indirectly holding 25% or more of the shares• directly or indirectly holding 25% or more of the voting rights• directly or indirectly having the right to appoint a majority of the board of directors or equivalent governing body of the Bidder]”Name of the Bidder: *[insert complete name of the Bidder]_________Name of the person duly authorized to sign the Bid on behalf of the Bidder: **[insert complete name of person duly authorized to sign the Bid]___________Title of the person signing the Bid: [insert complete title of the person signing the Bid]______Signature of the person named above: [insert signature of person whose name and capacity are shown above]_____Date signed [insert date of signing] day of [insert month], [insert year]_____* In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder. In the event that the Bidder is a joint venture, each reference to “Bidder” in the Beneficial Ownership Disclosure Form (including this Introduction thereto) shall be read to refer to the joint venture member.** Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached with the Bid Schedules.Section V - Eligible CountriesEligibility for the Provision of Goods, Works and Non-Consulting Services inBank-Financed ProcurementIn reference to ITB 4.8 and ITB 5.1, for the information of the Bidders, at the present time firms, Goods and Related Services from the following countries are excluded from this procurement process:• Under ITB 4.8(a) and ITB 5.1: NONE• Under ITB 4.8(b) and ITB 5.1: NONESection VI - Fraud and Corruption(Section VI shall not be modified)• PurposeThe Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.• Requirements• The Bank requires that Borrowers (including beneficiaries of Bank financing); Bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.• To this end, the Bank:• Defines, for the purposes of this provision, the terms set forth below as follows:• “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;• “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;• “collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;• “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;• “obstructive practice” is:• deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or• acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for under paragraph 2.2 e. below.• Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;• In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time they knew of the practices;• Pursuant to the Bank’s Anti- Corruption Guidelines, and in accordance with the Bank’s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[1] (ii) to be a nominated[2] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;• Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) Bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents personnel, permit the Bank to inspect[3] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.PART 2 – Supply RequirementsSection VII - Schedule of RequirementsContentsEstimated Schedule of Requirements- Supply of Goods............................................. 85Estimated Schedule of Requirements- Related Services............................................. 86Technical Specifications.............................................................................................. 87Drawings...................................................................................................................... 90Inspections and Tests................................................................................................... 91ESTIMATED SCHEDULE OF ANNUAL REQUIREMENS- Supply of GoodsCategory 1 -TransformersNo. | Description | Units of measure | Current standard [SABS/SANS/IEC] or equivalent | Estimated Minimum order quantity | Offered standard [SABS/SANS/IEC] or equivalent1. | Transformer, 16kVA, 11kV/231VSingle PhaseCeramic/Cycloaliphatic Open Type Bushings With 31mm/kV CreepageContinuous kVA Rating: 16kVAVoltage Rating: 11kV / 240VTaps: 0%, 3%, 6% (Boost) BIL: 95kVNo Loss: 49W & Load Loss: 320WFor single pole mounting with skid under-baseLifting LugsCooling: ONANInsulation Fluid: Mineral Oil, PCB FreeTank Material: Mild SteelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings Material: copper/AluminiumWinding Insulation Material: Resin and Paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091IEC 60085/ SANS 60317-0-1IEC 60243-1 | 9002. | Transformer, 50kVA, 11kV/415VVector group: Dyn11 Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 50kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: No load loss: 110W & full load loss: 880WFor H-frame pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environmentsLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 3503. | Transformer, 100kVA, 11kV/415VVector group: Dyn11 Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 100kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: No load loss: 190W & full load loss: 1500WFor H-frame pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environmentsLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 504. | Transformer, 200kVA, 11kV/415VVector group: Dyn11 Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 200kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: No load loss: 320W & full load loss: 2600WFor platform pole mounting with skid under-baseExterior coating prepared for use in non-corrosive environments Supplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/ G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 405. | Transformer, 315kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 315kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: No load loss: 450W & full load loss: 3600WFor H-frame pole mountingExterior coating prepared for use in non-corrosive environmentsSupplied with lv flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green / GA35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091IEC 60085/ SANS 60317-0-1IEC 60243-1 | 106. | Transformer, 500kVA, 11kV/415VVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 500kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6%BIL: No load loss: 630W & full load loss: 5200WFor platform mounting with jacking padsSupplied surge arrester brackets and earthing terminalSupplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green / G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 57. | Transformer, 630kVA, 11kV/415vVector group: Dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 630kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: 95kVNo load loss: 750W & full load loss: 6200WFor platform mounting with jacking padsSupplied surge arrester brackets Supplied with LV flags with 2 holes fitted with a M12 x 40mm bolt assembly (set screws),2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: Mineral oil, PCB freeTank material: Mild steelCoating: C12 avocado green/G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 58. | Transformer, 800kVA, 11kV/415VVector group: dyn11Cycloaliphatic/ceramic open type bushings with 31mm/kV creepage mounted on the sideContinuous kVA rating: 800kVAVoltage rating: 11kV / 415V Tap switch: 0%, ±3%, ±6% BIL: No load loss: 900W & full load loss: 7500WFor platform mounting with jacking padsExterior coating prepared for use in non-corrosive environmentsSupplied with LV flags with 2 holes fitted with a M12x40mm bolt assembly (set screws), 2x flat washers and 2x hex nuts eachLifting lugsCooling: ONANInsulation fluid: mineral oil, PCB freeTank material: mild steelCoating: C12 avocado green/G35 navy light grey for non-corrosive environmentsWindings material: Copper/aluminiumWinding insulation material: Resin and paper | Each | SANS 780/ IEC 60076 SANS 1037/ SANS 60137 orSANS 61462 and SANS 60076-3 SANS 60076-3/ SANS 60076-5 SANS 555-2 SANS 1091 IEC 60085/ SANS 60317-0-1IEC 60243-1 | 6Category 2 - Minisubs.No. | Description | Units of measure | Current standard [SABS/SANS/IEC] or equivalent | Estimated Minimum order quantity | Offered standard [SABS/SANS/IEC] or equivalent1. | Minisub; minisub 315kVA 11000/400V minisub with RMU | Each | SANS 1874 | 172. | Minisub; minisub 400kVA 11000/400V minisub with RMU | Each | SANS 1874 | 33. | Minisub; minisub 500kVA 11000/400V minisub with RMU | Each | SANS 1874 | 104. | Minisub; minisub 630kVA 11000/400V minisub with RMU | Each | SANS 1874 | 115. | Minisub; minisub 800kVA 11000/400VV minisub with RMU | Each | SANS 1874 | 10Category 3- Ring Main UnitsNo. | Description | Units of measure | Current standard [SABS/SANS/IEC] or equivalent | Estimated Minimum order quantity | Offered standard [SABS/SANS/IEC] or equivalent1. | Set of unit-to-unit busbars; for Ring Main Unit extensible switches | Each | SANS 1874 | 702. | RMU busbars end boxes or covers; for ring main unit extensible switches | Each | SANS 1874 | 153. | K1 ring main unit 12kV outdoor; unfused oil switch, pedestaled with operating handle, oil tins. | Each | SANS 1874 | 634. | K1af ring main unit 12kV outdoor; Alstom type fused oil switch, pedestalled with operating handle | Each | SANS 1874 | 685. | K1 unfused isolator ring main unit; extensible oil fuse switch fuse, 12kV suitable for outdoor inland use. | Each | SANS 1874 | 206. | Ring main unit K4/AF; RMU non-extensible oil switch fuse and isolator RMU 12kV, 50Hz, 630A current rating to both switch and busbar to IEC 60420 (1990) | Each | SANS 60439 | 157. | Ring main unit; ring main unit extensible single fused switch T1/of [GEC] x1F | Each | SANS 1874 | 10Category 4 - Meters, Metering Equipment and Ready BoardsDescription | Units of measure | Current standard [SABS/SANS/IEC] or equivalent | Estimated Minimum order quantity | Offered standard [SABS/SANS/IEC] or equivalent1. | Single Phase DIN Rail PLC Split Smart Meter with CIUNetwork: 1P2W; 230V; 5(80)A; 50HzMeasurement: kWh +/-; kvarhAccuracy: Class 1Modes: Basic STS kWh, Postpaid with TOUBilling: Energy and Maximum Demand with Time of Use (TOU) or PREPAID modeLoad Profile: 8 ChannelSmart Functions: Prepaid or Postpaid Modes, Remote Disconnect, Load Limiting, Anti Tamper, Modular Communication options, Firmware UpgradableCommunications: Uplink Modules: 4G (point to point, with modem), Ethernet or WIFI. Downlink to CIU:PLC, G3 PLC, RFStandards: STS; DLMS/COSEM; IEC 62055-31, NRS049, IDIS | Each | SANS1524-1, NRS 049, IEC 62055-41/51 | 35 0002. | Three-Phase Smart Meter SpecificationsNetwork: 3P4W; 230V; 5(100)A; 50HzMeasurement: kWh +/-; kvarh; KVAAccuracy: Class 1Modes: Basic STS kWh, Postpaid with TOUBilling: Energy and Maximum Demand with Time of Use (TOU) or PREPAID modeLoad Profile: 8 ChannelSmart Functions: Prepaid or Postpaid Modes, Remote Disconnect, Load Limiting, Anti Tamper, Modular Communication options, Firmware UpgradableCommunications: Uplink Modules:, 4G (point to point, with modem), Ethernet or WIFI, Downlink to CIU:PLC, G3 PLC, RFStandards: STS; DLMS/COSEM; IEC 62055-31, NRS049, IDIS, G3-PLC | Each | SANS1524-1, NRS 049, IEC 62055-41/51 | 5 0003. | Distribution ready board, 120 x 260 x 300mm, complete with 1 x 63A earth leakage, 1 x 20A mains, 1 x 15A breaker, 1 x 5A breaker, 16A double 3 pin socket, 6A euro socket, bulkhead and globe, SANS 10142-1 | Each | SANS 10142 - 1 | 6004. | Meter box, 300 x 300 x 1225 mm, 3 x 20mm knockout on the base for conduit, lockable and fitted with masonite board, metal grey galvanized, SANS | Each | SANS 10142 - 1 | 250* “Delivery Period” is the specified period from the date of formation of a Call-off contract for delivery of the Goods as per the applicable Incoterms.Summary of Technical Specifications. The Goods and Related Services shall comply with following Technical Specifications and Standards: wwwItem No | Name of Goods or Related Service | Technical Specifications and Standards[insert item No] | [insert name] | [insert TS and Standards]Detailed Technical Specifications and Standards [insert whenever necessary].[Insert detailed description of TS]DrawingsThis RFB document does not include drawings.Inspections and TestsThe following inspections and tests shall be performed:• The Eswatini Electricity Company will perform supplier site inspections for shortlisted bidders to determine and confirm the existence of potential suppliers.• A Supplier Audit questionnaire will be used by the evaluation team from EEC during the supplier site visit.PART 3 – Procuring Agency FormsProcuring Agency FormsContentsNotification of Intention to Conclude a Framework Agreement(s) 94Notification to Conclude a Framework Agreement 99Notification of Intention to Conclude a Framework Agreement(s)[This Notification of Intention to Conclude a Framework Agreement(s) shall be sent to each Bidder that submitted a Bid, unless the Bidder has previously received notice of exclusion from the process at an interim stage of the procurement process. Send this Notification to the Bidder’s Authorized Representative named in the Bidder Information Form]For the attention of Bidder’s Authorized RepresentativeName: [insert Authorized Representative’s name]Address: [insert Authorized Representative’s Address]Telephone/Fax numbers: [insert Authorized Representative’s telephone/fax numbers]Email Address: [insert Authorized Representative’s email address][IMPORTANT: insert the date that this Notification is transmitted to Bidders. The Notification must be sent to all Bidders simultaneously. This means on the same date and as close to the same time as possible.]Procuring Agency: [insert the name of the Procuring Agency]Project: [insert name of project]Framework Agreement title: [insert the name of the FA]Country: [insert country where RFB is issued]Loan No. /Credit No. / Grant No.: [insert reference number for loan/credit/grant]RFB No: [insert RFB reference number from Procurement Plan]Date of transmission: This Notification is sent by: [email/fax] on [date] (local time)Notification of Intention to Conclude a Framework Agreement(s)This Notification of Intention to conclude Framework Agreement(s) (Notification) notifies you of our decision to conclude the above Framework Agreement(s). The transmission of this Notification begins the Standstill Period. During the Standstill Period, you may:• request a debriefing in relation to the evaluation of your Bid, and/or• submit a Procurement-related Complaint in relation to the decision to conclude the Framework Agreement.The successful Bidder(s) are the following:Item No. | Description | Estimated Quantity over FA period orRange of Call-off Quantities | Name of Bidder | Technical Score | Bid price as read-out | Evaluated Bid Cost | Combined ScoreAll Bidders [INSTRUCTIONS: insert names of all Bidders that submitted Bids, Bid prices as read out and evaluated, technical scores and combined scores .]Item No. | Description | Estimated Quantity over FA period orRange of Call-off Quantities | Name of Bidder | Technical Score | Bid price as read-out | Evaluated Bid Cost | Combined ScoreReason/s why your Bid was unsuccessful[INSTRUCTIONS: State the reason/s why this Bidder’s Bid was unsuccessful. Do NOT include: (a) a point by point comparison with another Bidder’s Bid or (b) information that is marked confidential by the Bidder in its Bid.]How to request a debriefingDeadline: The deadline to request a debriefing expires at midnight on [insert date] (local time).You may request a debriefing in relation to the results of the evaluation of your Bid. If you decide to request a debriefing your written request must be made within three (3) Business Days of receipt of this Notification of Intention to Conclude a Framework Agreement.Provide the framework agreement name, reference number, name of the Bidder, contact details; and address the request for debriefing as follows:Attention: Ms. Thobeka GamaTitle/position: Procurement SpecialistAgency: Eswatini Electricity CompanyEmail address: thobeka.gama@eec.co.sz copied bongani.chauke@eec.co.szIf your request for a debriefing is received within the 3 Business Days deadline, we will provide the debriefing within five (5) Business Days of receipt of your request. If we are unable to provide the debriefing within this period, the Standstill Period shall be extended by five (5) Business Days after the date that the debriefing is provided. If this happens, we will notify you and confirm the date that the extended Standstill Period will end.The debriefing may be in writing, by phone, video conference call or in person. We shall promptly advise you in writing how the debriefing will take place and confirm the date and time.If the deadline to request a debriefing has expired, you may still request a debriefing. In this case, we will provide the debriefing as soon as practicable, and normally no later than fifteen (15) Business Days from the date of publication of the Conclusion of Framework Agreement Notice.How to make a complaintDeadline: Procurement-related Complaint challenging the decision to conclude a Framework Agreement shall be submitted by midnight, [insert date] (local time).Provide the Framework Agreement name, reference number, name of the Bidder, contact details; and address the Procurement-related Complaint as follows:Attention: Mphumuzi MaziyaTitle/position: Managing DirectorAgency: Eswatini Electricity CompanyEmail address: mphumuzi.maziya@eec.co.sz copied to bongani.cauke@eec.co.szAt this point in the procurement process, you may submit a Procurement-related Complaint challenging the decision to exclude you from conclusion of a Framework Agreement. You do not need to have requested, or received, a debriefing before making this complaint. Your complaint must be submitted within the Standstill Period and received by us before the Standstill Period ends.Further information:For more information see the Procurement Regulations for IPF Borrowers (Procurement Regulations) (Annex III). You should read these provisions before preparing and submitting your complaint. In addition, the World Bank’s Guidance “How to make a Procurement-related Complaint” provides a useful explanation of the process, as well as a sample letter of complaint.In summary, there are four essential requirements:You must be an ‘interested party’. In this case, that means a Bidder who submitted a Bid in this procurement process, and is the recipient of a Notification of Intention to Conclude a Framework Agreement.The complaint can only challenge the decision to conclude the Framework Agreement.You must submit the complaint within the period stated above.You must include, in your complaint, all the information required by the Procurement Regulations (as described in Annex III).Standstill PeriodDeadline: The Standstill Period is due to end at midnight on [insert date] (local time).The Standstill Period lasts ten (10) Business Days after the date of transmission of this Notification of Intention to Conclude a Framework Agreement.The Standstill Period may be extended as stated in the section above titled ‘How to request a debriefing’.If you have any questions regarding this Notification, please do not hesitate to contact us.On behalf of the Procuring Agency:Signature:Name:Title/position:Telephone:Email:Notification to Conclude a Framework Agreement[Use letterhead paper of the Procuring Agency][Date]To: [name and address of successful Bidder]Notification to Conclude a Framework AgreementFramework Agreement No. [insert FA reference number]This is to notify you that your Bid dated [insert date] to conclude a Framework Agreement in relation to the supply of [insert short title for Goods] is hereby accepted by our Agency.Please sign, date and return the Framework Agreement within [insert the applicable period for signing of the FA in accordance of the ITB] days of receipt of the same. In accordance with ITB 41.1, please also complete and submit, within eight (8) Business days, the Beneficial Ownership Disclosure Form attached to the RFB.Authorized Signature:Name:Title/position:Name of Agency:Telephone:Email:Attachment: Framework AgreementPART 4 – Framework AgreementFramework AgreementThis Framework Agreement [insert reference number of the Framework Agreement] is made for the supply of Distribution Transformers and Electricity Meterson the [insert: number] day of [insert: month], [insert: year]betweenthe Purchaser(s) The Eswatini Electricity Company, a statutory body established in terms of The Swaziland Electricity Act no.1 of 2007 with its principal place of business at Eluvatsini House, Mhlambanyatsi Road, Mbabane, Hhohho Region.the Supplier [insert name of the Supplier], a corporation incorporated under the laws of [insert country of Supplier] and having its principal place of business at [insert Supplier’s address] (Supplier).This Framework Agreement is subject to the provisions described in the Sections and Schedules listed below, and any amendments.This Framework Agreement concludes a standing offer by the Supplier to supply the specified Goods to the Purchaser(s) during the Term of the Framework Agreement, as and when the Purchaser(s) wishes to purchase them, through a Call-off Contract.The following documents shall be deemed to form and be read and construed as part of this Framework Agreement and, where indicated, to any Call-off Contract awarded under this Framework Agreement.Framework Agreement ProvisionsSchedule 1: Schedule of RequirementsSchedule 2: Price SchedulesSchedule 3: Security FormsSchedule 4: Secondary ProcurementSchedule 5: List of participating Purchasers [use for Multi-User FAs, otherwise delete]IN WITNESS whereof, the Parties to this Framework Agreement have caused this Framework Agreement to be executed in accordance with the laws of [insert the name of the Framework Agreement governing law country] on the day, month and year indicated above.[To facilitate this emergency procurement, if acceptable to the Purchaser and the Supplier, electronic signature of the Framework Agreement such as using DocuSign is recommended.]“For and on behalf of the Purchaser:”Signed: [insert signature]Full name: [name of person signing]Agency: [insert the name of agency]In the capacity of: [insert title or other appropriate designation]In the presence of [insert identification of official witness]For and on behalf of the Supplier:Signed: [insert signature of authorized representative(s) of the Supplier]Full name: [name of person signing]In the capacity of: [insert title or other appropriate designation]In the presence of [insert identification official of witness]Framework Agreement Provisions (FAP)[This section is to be completed by the Procuring Agency as per the instructions provided in italicized text. The italicized text should be deleted from the final document.]Framework Agreement Provision (FAP) | DescriptionDefinitions | The following words and expressions shall have the meanings hereby assigned to them“Bank” means the World Bank, meaning the International Bank for Reconstruction and Development (IBRD) and/or the International Development Association (IDA), whether acting on its own account or in its capacity as administrator of trust funds provided by other donors.“Base Price” is the Framework Agreement (FA) unit price prior to any price adjustment in accordance with FA Provision FAP 8.“Business Day” is any day that is an official working day of the Purchaser. It excludes the Purchaser’s official public holidays.“Call-off Contract” is a contract awarded under a Framework Agreement, through a Secondary Procurement process, for the supply of Goods, and any Related Services.“Closed Framework Agreement” is where no new firm(s) may conclude Framework Agreement(s) during the Term of the Framework Agreement.“Commencement Date” is the date this Framework Agreement is signed by both parties, being the commencement of the Term.“Contract Price” is the price payable to the Supplier as specified in each Call-off Contract, subject to such additions and adjustments thereto or deductions therefrom, as may be made pursuant to the Contract.“Day” means calendar day.“Goods” means all goods, materials, items, commodities, raw material, machinery, equipment, and/or other materials, as specified in the FA Provisions, that the Supplier is required to supply to the Purchaser under a Call-off Contract. Where appropriate, for the purpose of interpretation, the definition for Goods includes Related Services.“In Writing” means communicated or recorded in written form. It includes, for example: mail, e-mail, fax or communication through an electronic procurement system (provided that the electronic system is accessible, secure, ensures integrity and confidentiality, and has sufficient audit trail features).“Incoterms” means the international commercial terms for goods published by the International Chamber of Commerce (ICC).“Lead Purchaser”, when named in the Framework Agreement, means a party to the Framework Agreement, as a Purchaser in its own right under the framework agreement and as the agency responsible for the management and administration of the Framework Agreement for use by the other participating Purchasers as specified in the FAP 2.2. All communications, including notices, in relation to the Framework Agreement, are to be addressed to the Lead Purchaser. All communications, including notices, in relation to a Call-off Contract, are to be addressed to the Purchaser named in the Call-off Contract.“Multi-User Framework Agreement” means a Framework Agreement where there is more than one Purchaser permitted to purchase through a Call-off Contract, as specified in the FAP 2.2; “Purchaser” is the Borrower’s agency(ies) that is/are permitted to purchase Goods from a Supplier under a Call-off Contract awarded through a Framework Agreement. Where appropriate, for the purpose of interpretation of the Framework Agreement, the term Purchaser includes Lead Purchaser, or Responsible Agency.“Purchaser’s Country” is the country specified in the FAP 2.3.“Related Services” means the services incidental to the supply of the Goods, such as insurance, installation, training, initial maintenance and other such obligations of the Supplier, excluding inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination.“Responsible Agency”, when named in the Framework Agreement, is a party to the Framework Agreement, but only in its capacity as the agency responsible for managing and administering the Framework Agreement for use by the participating Purchasers. All communications, including notices, in relation to the Framework Agreement, are to be addressed to the Responsible Agency.“Secondary Procurement” is the method used to select a Supplier and award a Call-off Contract under this Framework Agreement.“Single-User Framework Agreement” means a Framework Agreement where there is only one Purchaser, as specified in the FAP 2.2.“Supplier” means the person, private or government entity, or a combination of the above, who has concluded a Framework Agreement to supply to a Purchaser, from time to time, and as and when required, the Goods, and, if applicable, Related Services, under a Call-off Contract.“Term” mean the duration of this Framework Agreement as described in the FAP2.4 starting on the Commencement Date. Where applicable, it includes any extension(s) to the initial Term, if permitted in the FA 2.5.Framework Agreement Specific Information | This Framework Agreement relates to the purchase and supply, under separate Call-off Contracts, of Distribution Transformers and Electricity Meters. The Goods, and Related Services, are more fully described in Schedule 1: Schedule of Requirements including, where applicable: list of Goods, list of Related Services, Technical Specifications, Drawings and Inspections and Tests.This is a Single-User Framework Agreement.The Purchaser’s Country is: The Kingdom of Eswatini.The Framework Agreement and the Call-off Contracts shall be governed by and interpreted in accordance with the laws of the Purchaser’s Country.The Term of this Framework Agreement is three (3) years from the Commencement Date.The Term may be extended, at the Purchaser’s sole discretion, and where there has been satisfactory performance by the Supplier. To extend the Term, the Purchaser shall give the Supplier no less than three (3) months’ notice, In Writing, prior to the date on which the Framework Agreement would otherwise have expired. The total Term of the Framework Agreement shall be no longer than five (5) years.The edition of Incoterms that shall apply is: CIP – Incoterms 2020Source of the indices, and the source of exchange rate (if applicable) and the base date indices: Consumer Price IndexAny notice given by one party to the other pursuant to this Framework Agreement shall be In Writing using the quickest available method such as electronic mail with proof of receipt. A notice shall be effective when delivered, or on the notice’s effective date, whichever is later.The representatives for each party, who shall be the primary point of contact for the other party in relation to matters arising from this Framework Agreement, including notices, are specified below. Should the representative be replaced, the party replacing the representative shall promptly inform the other party In Writing of the name and contact details of the new representative. Any representative appointed shall be authorized to make decisions on the day-to-day operation of the Framework Agreement.Purchaser’s Representatives The name and contact details of the Purchaser’s Representative under this Framework Agreement, and the address for notices in relation to this Framework Agreement, are: Name: Ms. Thobeka Gama Title/position: Procurement Specialist Address: Eluvatsini House, Mhlambanyatsi Road, Mbabane, Eswatini Phone: +268 2409 4062 Mobile: +268 7833 2239E-mail: thobeka.gama@eec.co.szSupplier’s RepresentativesThe name and contact details of the Supplier’s Representative, for the purposes of this Framework Agreement, and the address for notices in relation to this Framework Agreement are:Name:Title/position:Address:Phone:Mobile:E-mail:Framework Agreement Documents | This Framework Agreement (FA) shall be read as a whole. Where a document is incorporated by reference into this Framework Agreement, it shall be deemed to form, and be read and construed, as part of this Framework Agreement.This Framework Agreement comprises the following documents.:Framework Agreement, including all Sections and Schedules;Notice of Conclusion of a Framework Agreement; andOffer submission form (from Primary Procurement process).Supplier’s Obligations | The Supplier shall offer to supply (standing offer) to the Purchaser, the Goods, including any Related Services if applicable, described in the Framework Agreement Schedule 1: Schedule of Requirements, for the Term of this Framework Agreement, in accordance with the terms and conditions stipulated in this Framework Agreement.The Supplier shall respond to a request from a Purchaser for quotation or direct contracting within the period specified in that request by either (i) submitting a quotation or (ii) accepting award of contract in case of direct selection or (iii) informing the Purchaser that it does not intend to supply the Goods and Related Services (if any) under the Call-off Contract.During the Term of the Framework Agreement, the Supplier shall continue to be eligible and qualified, and the Goods shall continue to be eligible, as per the qualification and eligibility criteria stipulated in the Primary Procurement process and the provisions of sub-paragraphs 4.4 (a) to 4.4 (c) below. The Supplier shall notify the Purchaser immediately, in writing, if it ceases to be qualified and/or ceases to be eligible, or the Goods cease to be eligible.The Goods supplied under Call-off Contracts that may be awarded by the Purchaser shall be:of the quality, type and as otherwise specified in the Framework Agreement, Schedule 1: Schedule of Requirements;at the Contract Price specified in the Call-off Contract; andin such quantities, at such times and to such locations as specified in the Call-off Contract.At any point during Term of the Framework Agreement, should technological advances be introduced by the Supplier for the Goods offered for the Framework Agreement, the Supplier shall provide to the Purchaser(s) of the Call-off Contracts the latest versions of the available Goods at the time of Call-off, having equal or better performance or functionality at no additional cost to the Purchaser (s).The Supplier agrees that this Framework Agreement and any additional provisions set out in a Call-off Contract, shall apply to the supply of Goods.Forced LaborThe Supplier, including its Subcontractors, shall not employ or engage forced labor or persons subject to trafficking..Forced labor consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labor, such as indentured labor, bonded labor or similar labor-contracting arrangements.Trafficking in persons is defined as the recruitment, transportation, transfer, harboring or receipt of persons by means of the threat or use of force or other forms of coercion, abduction, fraud, deception, abuse of power, or of a position of vulnerability, or of the giving or receiving of payments or benefits to achieve the consent of a person having control over another person, for the purposes of exploitation.Child LaborThe Supplier, including its Subcontractors, shall not employ or engage a child under the age of 14 unless the national law specifies a higher age (the minimum age).The Supplier, including its Subcontractors, shall not employ or engage a child between the minimum age and the age of 18 in a manner that is likely to be hazardous, or to interfere with, the child’s education, or to be harmful to the child’s health or physical, mental, spiritual, moral, or social development.Work considered hazardous for children is work that, by its nature or the circumstances in which it is carried out, is likely to jeopardize the health, safety, or morals of children. Such work activities prohibited for children include work:with exposure to physical, psychological or sexual abuse;underground, underwater, working at heights or in confined spaces;with dangerous machinery, equipment or tools, or involving handling or transport of heavy loads;in unhealthy environments exposing children to hazardous substances, agents, or processes, or to temperatures, noise or vibration damaging to health; orunder difficult conditions such as work for long hours, during the night or in confinement on the premises of the employer.Health and safety obligationsThe Supplier shall comply, and shall require its Subcontractors if any to comply, with all applicable health and safety regulations, laws, guidelines, and any other requirement stated in the Technical Specifications.The Supplier shall comply with additional obligations as specified in the Call-off Contract.Continued Qualifications and Eligibility | The Supplier shall continue to have the nationality of an eligible country. A Supplier or subcontractor, shall be deemed to have the nationality of a country if the Supplier is constituted, incorporated or registered in, and operates in conformity with, the provisions of the laws of that country, as evidenced by its articles of incorporation (or equivalent documents of constitution or association) and its registration documents, as the case may be.All Goods and Related Services to be supplied under a Call-off Contract and financed by the Bank shall continue to have their origin in eligible Countries. For the purpose of this provision, origin means the country where the Goods have been grown, mined, cultivated, produced, manufactured, or processed; or through manufacture, processing, or assembly, another commercially recognized article results that differs substantially in its basic characteristics from its components. Ineligible Countries, if any, are listed in FAP 5.5 below.To continue to be eligible the Supplier shall not have been sanctioned by the Bank, pursuant to the Bank’s Anti-Corruption Guidelines, and in accordance with its prevailing sanctions policies and procedures as set forth in the World Bank Group’s Sanctions Framework.The Purchaser may require, during the Term of the Framework Agreement, evidence of the Supplier’s continued qualification and eligibility, and the Goods continued eligibility. Failure to provide such evidence, as requested, may result in the Supplier being disqualified from participating in a Secondary Procurement process, and/or being awarded a Call-off Contract, and/or the termination of the Framework Agreement.At the present time, firms, goods and services from the following countries are excluded from this Framework Agreement as being ineligible. NoneRole of Lead Purchaser or Responsible Agency | Where there is a Lead Purchaser or Responsible Agency that is a party to the Framework Agreement, their role is to manage and administer the Framework Agreement(s) for use by the participating Purchaser(s). All communications, including notices, in relation to the Framework Agreement are to be made to the Lead Purchaser or Responsible Agency.The Lead Purchaser or Responsible Agency is responsible for all matters pertaining to the Framework Agreement including, for example, amendments, suspension and termination of the Framework Agreement. For matters relating to individual Call-off Contracts, all communications, including notices, must be made to the Purchaser named in the Call-off Contract.Where no Lead Purchaser or Responsible Agency has been appointed, the named Purchaser is responsible for managing and administering the Framework Agreement and the provisions in FAP 2.9 above, in relation to communications and notices etc., apply to the Purchaser.Contract Price | The Contract Price for each call-off Contract shall be determined by applying:For Direct Selection:the Base Price (unit price/s) stipulated in the Framework Agreement, Schedule 2, subject to any adjustments specified in FAPs 8 and 9; and any additional price for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in Call-off Contract.orFor Mini-competition:the successful competitive quotation subject to any adjustments specified in FAPs 8 and 9; and any additional price for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ.Adjustments for changes in Cost | Adjustments to the Base Price (unit prices) stipulated in the Framework AgreementThe unit price/s stipulated in the FA, shall not be subject to adjustments for Call-off contracts awarded within twelve (12) months from the date of conclusion of FA. For any Call-off contracts awarded after this specified period, the unit price/s shall be subject to an adjustment as follows:for Call-off Contracts awarded through the Secondary Procurement method based on competitive quotations (mini-competition), Suppliers shall be required to offer prices that do not exceed their adjusted unit price/s as adjusted below;for Call-off Contracts awarded through a Secondary Procurement method involving direct selection, (i.e. not awarded through a mini-competition), the price adjustment below shall be applied to that Supplier’s unit price/s to determine the Call-off Contract Price. The price adjustment is intended to reflect changes in the cost of labor, material components, and/or other factors, over the relevant period of the FA. Where a price adjustment applies, it shall be calculated as follows: P1=P0 a+bL1L0+bM1M0a+b+c = 1in which:P1 = Call-off unit price.P0 = unit price, as described in the Framework Agreement, Schedule 2: Price Schedules.a = fixed element representing profits and overheads included in the Contract Price.b = estimated percentage of labor component in the Contract Price.c = estimated percentage of material component in the Contract Price.L0, L1 = labor indices applicable to the appropriate industry in the country of origin on the base date and date for adjustment, respectively.M0, M1 = material indices for the major raw material on the base date and date for adjustment, respectively, in the country of origin.The Supplier shall indicate the source of the indices, and the source of exchange rate (if applicable) and the base date indices in its offer.The coefficients are as follows:a = [0.10]b = [0.25]c = [0.65]Base date = 28 October 2026Date of adjustment =:For Direct Selection: the date 30 days prior to the formation of the Call-off ContractFor mini competition: the date 30 days prior to the Request for Quotation.If the currency in which the Contract Price (P0) is expressed, is different from the currency of origin of the labor and material indices, a correction factor will be applied to avoid incorrect adjustments of the unit price/s. The correction factor shall be: Z0 / Z1, where:Z0 = the number of units of currency of the origin of the indices which equal to one unit of the currency of the Contract Price P0 on the Base date, andZ1 = the number of units of currency of the origin of the indices which equal to one unit of the currency of the Contract Price P0 on the Date of Adjustment.Adjustments for Changes in Laws | If after the date of 28 days prior to date of Offer submission for the Framework Agreement, any law, regulation, ordinance, order or bylaw having the force of law is enacted, promulgated, abrogated, or changed in the place of the Purchaser’s Country (which shall be deemed to include any change in interpretation or application by the competent authorities) that subsequently affects the Base Price (unit price/s) stipulated in the Framework Agreement, then such unit price/s shall be correspondingly increased or decreased, to the extent that the Supplier has thereby been affected in the performance of any of its obligations under the Framework Agreement. Notwithstanding the foregoing, such additional or reduced cost shall not be separately paid or credited if the same has already been accounted for in the price adjustment provisions where applicable, in accordance with FAP 8.Subcontractors | The Supplier shall notify the Purchaser in writing of all subcontracts awarded under the Call-off Contracts if not already specified in the Framework Agreement. Such notification, in the Framework Agreement or later shall not relieve the Supplier from any of its obligations, duties, responsibilities, or liability under the Call-off Contract.Warranty | The Supplier warrants that all the Goods are new, unused, and of the most recent or current models, and that they incorporate all recent improvements in design and materials, unless provided otherwise in the Contract.The Supplier further warrants that the Goods shall be free from defects arising from any act or omission of the Supplier or arising from design, materials, and workmanship, under normal use in the conditions prevailing in the country of final destination.The Supplier shall comply with any additional warranty obligation specified in the Call-off Contracts.Copyright | The copyright in all drawings, documents, and other materials containing data and information furnished to the Purchaser by the Supplier herein shall remain vested in the Supplier, or, if they are furnished to the Purchaser directly or through the Supplier by any third party, including suppliers of materials, the copyright in such materials shall remain vested in such third party.Patent Indemnity | The Supplier shall, subject to the Purchaser’s compliance with 13.2 below, indemnify and hold harmless the Purchaser and its employees and officers from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of any nature, including attorney’s fees and expenses, which the Purchaser may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright, or other intellectual property right registered or otherwise existing at the date of the Contract by reason of:the installation of the Goods by the Supplier or the use of the Goods in the country where the Site is located; andthe sale in any country of the products produced by the Goods.Such indemnity shall not cover any use of the Goods or any part thereof other than for the purpose indicated by or to be reasonably inferred from the Contract, neither any infringement resulting from the use of the Goods or any part thereof, or any products produced thereby in association or combination with any other equipment, plant, or materials not supplied by the Supplier, pursuant to the Contract. If any proceedings are brought or any claim is made against the Purchaser arising out of the matters referred to in 13.1 above, the Purchaser shall promptly give the Supplier a notice thereof, and the Supplier may at its own expense and in the Purchaser’s name conduct such proceedings or claim and any negotiations for the settlement of any such proceedings or claim.If the Supplier fails to notify the Purchaser within twenty-eight (28) days after receipt of such notice that it intends to conduct any such proceedings or claim, then the Purchaser shall be free to conduct the same on its own behalf.The Purchaser shall, at the Supplier’s request, afford all available assistance to the Supplier in conducting such proceedings or claim, and shall be reimbursed by the Supplier for all reasonable expenses incurred in so doing.The Purchaser shall indemnify and hold harmless the Supplier and its employees, officers, and Subcontractors from and against any and all suits, actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of any nature, including attorney’s fees and expenses, which the Supplier may suffer as a result of any infringement or alleged infringement of any patent, utility model, registered design, trademark, copyright, or other intellectual property right registered or otherwise existing at the date of the Contract arising out of or in connection with any design, data, drawing, specification, or other documents or materials provided or designed by or on behalf of the Purchaser.Limitation of Liability | Except in cases of criminal negligence or willful misconduct,the Supplier shall not be liable to the Purchaser, whether in contract, tort, or otherwise, for any indirect or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs, provided that this exclusion shall not apply to any obligation of the Supplier to pay liquidated damages to the Purchaser andUnder each Call-off Contract, the aggregate liability of the Supplier to the Purchaser, whether under the Contract, in tort or otherwise, shall not exceed the Call-off Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the supplier to indemnify the Purchaser with respect to patent infringement.Force Majeure | The Supplier shall not be liable for forfeiture of its Performance Security (if required), liquidated damages, or termination for default if and to the extent that its delay in performance or other failure to perform its obligations under the Framework Agreement and/or a Call-off Contract is the result of an event of Force Majeure.For purposes of this provision, “Force Majeure” means an event or situation beyond the control of the Supplier that is not foreseeable, is unavoidable, and its origin is not due to negligence or lack of care on the part of the Supplier. Such events may include, but not be limited to, acts of the Purchaser in its sovereign capacity, wars or revolutions, fires, floods, and freight embargoes.If a Force Majeure situation arises, the Supplier shall promptly notify the Purchaser in writing of such condition and the cause thereof. Unless otherwise directed by the Purchaser in writing, the Supplier shall continue to perform its obligations under the Contract as far as is reasonably practical and shall seek all reasonable alternative means for performance not prevented by the Force Majeure event.If the performance of the Contract is substantially prevented, hindered or delayed for a single period of more than sixty (60) days or an aggregate period of more than one hundred and twenty (120) days on account of one or more events of Force Majeure during the currency of the Contract, the Parties will attempt to develop a mutually satisfactory solution, failing which either Party may terminate the Contract by giving a notice to the other Party.Language | The language of this Framework Agreement, and any Call-off Contract is English. Supporting documents and printed literature that are part of this Framework Agreement, and any Call-off Contract, may be in another language provided they are accompanied by an accurate translation of the relevant passages in the language specified, in which case, for purposes of this Framework Agreement, and any Call-off Contract, this translation shall govern.The Supplier shall bear all costs of translation to the governing language and all risks of the accuracy of such translation.Fraud and Corruption | The Bank requires compliance with the Bank’s Anti-Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the World Bank Group’s Sanctions Framework, as set forth in the Appendix to this Framework Agreement Provisions (Fraud and Corruption).The Purchaser requires the Supplier to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the Primary or Secondary Procurement process or execution of a Call-off Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee.Records, inspections and audit | The Supplier shall keep, and shall make all reasonable efforts to cause its subcontractor(s), if any, to keep, accurate and systematic accounts and records in respect of this Framework Agreement, the Goods, and any Call-off Contract, in such form and details as will clearly identify relevant time changes and costs.Pursuant to paragraph 2.2 e. of the Appendix to the Framework Agreement, the Supplier shall permit and shall cause its agents (where declared or not), subcontractors, subconsultants, service providers, suppliers, and personnel, to permit, the Bank and/or persons appointed by the Bank to inspect the site and/or the accounts, records and other documents relating to the request for quotations process and/or execution of the Framework Agreement and/or any Call-off Contract. The Supplier’s and its subcontractors attention is drawn to FAP 17 (Fraud and Corruption) which provides, inter alia, that acts intended to materially impede the exercise of the Bank’s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank’s prevailing sanctions procedures).Confidential Information | The Purchaser and the Supplier shall keep confidential and shall not, without the consent In Writing from the other, divulge to any third party any documents, data, or other information furnished directly or indirectly by either party in connection with the Framework Agreement.The obligation of a party under FAP 19. 1 above, shall not apply to information that:the Purchaser or Supplier need to share with the Bank or other institution(s) participating in the financing of a Call-off Contractnow, or in future, enters the public domain through no fault of that partycan be proven to have been possessed by that party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other partyotherwise lawfully becomes available to that party from a third party that has no obligation of confidentiality.Change to the Framework Agreement | Any change to this Framework Agreement, including an extension of the Term, must be In Writing and signed by both Parties. A change can be made at any time after this Framework Agreement has been signed by both Parties, and before it expires.Assignment | The Supplier shall not assign, in whole or in part, its obligations under this this Framework Agreement and/or Call-off Contracts, without the prior written consent of the Purchaser.Termination of the Framework Agreement | The Purchaser, without prejudice to any other remedy for breach of the Framework Agreement or Call-off Contract, may terminate this Framework Agreement immediately, by notice In Writing to the Supplier, if:in the judgement of the Purchaser, the Supplier has engaged in Fraud and Corruption, orduring the Term of the Framework Agreement, the Supplier ceases to be qualified or eligible, orthe Supplier purports to assign, or otherwise transfer or dispose of this Framework Agreement and/or Call-off Contract, in whole, or in part, without the prior written consent of the Purchaser, orthe Supplier becomes bankrupt or otherwise insolvent, orthe Supplier fails to perform any other obligation under the Framework Agreement and/or any Call-off Contract.The Purchaser may terminate this Framework Agreement and/or any Call-off Contract, in whole or in part, by notice In Writing sent to the Supplier, at any time, for its convenience. The notice of termination shall specify that the termination is for the Purchaser’s convenience, the extent to which the performance of the Supplier under the Framework Agreement is terminated, and the date upon which such termination becomes effective.Upon expiry, or earlier termination of this Framework Agreement, all Call-off Contracts already entered into under this Framework Agreement shall continue in full force and effect. However, no further Call-off Contracts shall be awarded once the Framework Agreement is terminated.Dispute resolution in relation to the Framework Agreement | In the case of a dispute arising out of, or in connection with this Framework Agreement, the Parties shall, in good faith, make every reasonable effort to communicate and cooperate with each other with a view to amicably resolving the dispute.Where parties have exhausted the process described in FAP 23.1, the parties may, by mutual agreement, nominate and refer the dispute to an adjudicator/mediator to assist in the resolution of the dispute. Parties will meet their own costs associated with such a referral, and split the costs of the adjudicator/. In appointing the adjudicator parties should agree whether or not the adjudicator’s decision is to be final and binding.Further dispute resolution mechanism for Call-off contracts shall be as specified in the Call-off Contracts.Appendix to the Framework Agreement: Fraud and Corruption(Text in this Appendix shall not be modified)• PurposeThe Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations.• Requirements• The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders (applicants/proposers), consultants, contractors and suppliers; any sub-contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption.• To this end, the Bank:• Defines, for the purposes of this provision, the terms set forth below as follows:• “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party;• “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation;• “collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party;• “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party;• “obstructive practice” is:• deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or• acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for under paragraph 2.2 e. below.• Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question;• In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring misprocurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time they knew of the practices;• Pursuant to the Bank’s Anti- Corruption Guidelines and in accordance with the Bank’s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;[4] (ii) to be a nominated[5] sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project;• Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers), consultants, contractors, and suppliers, and their sub-contractors, sub-consultants, service providers, suppliers, agents, personnel, permit the Bank to inspect[6] all accounts, records and other documents relating to the procurement process, selection and/or contract execution, and to have them audited by auditors appointed by the Bank.Framework Agreement – SchedulesSCHEDULE 1: Schedule of Requirements[insert the agreed schedule of requirements e.g.:]Contents• List of Goods [consistent with the price schedule forms]List of Related Services [consistent with the price schedules]Technical SpecificationsTechnical Specifications shall be fully descriptive of the requirements in respect of, but not limited to, the following:• standards• any required Related Services• any required tests and inspections• any functional guarantees covered by the Warranty.[If a summary of the Technical Specifications (TS) has to be provided, the Procuring Agency shall insert information in the table below.1.3.1 Summary of Technical Specifications. The Goods and Related Services shall comply with following Technical Specifications and Standards:Item No | Name of Goods or Related Service | Technical Specifications and Standards[insert item No] | [insert name] | [insert TS and Standards]1.3.2 Detailed Technical Specifications and Standards [insert whenever necessary].[Insert detailed description of TS]1.3.3 Drawings – N/AList of DrawingsDrawing Nr. | Drawing Name | Purpose1.3.4 Inspection and TestsThe following inspections and tests shall be performed: [insert list of inspections and tests, including as applicable: nature, frequency, any locations and any procedure for carrying out the inspections and tests.]SCHEDULE 2: Price Schedules[insert the agreed price schedules]SCHEDULE 3: Security FormsSecurity Forms that may be required under Call-off Contracts1. Performance Security2. Advance Payment SecurityPerformance Security(Bank Guarantee)[The bank, as requested by the Supplier, shall fill in this form in accordance with the instructions indicated][Guarantor letterhead or SWIFT identifier code]Beneficiary: [insert name and Address of Purchaser]Date: [Insert date of issue]Performance Guarantee No.: [Insert guarantee reference number]Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]Contract No.: [insert Purchaser’s reference for the specific Contract]We have been informed that _ [insert name of Supplier, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Applicant") has entered into a Contract No. [insert reference number of the contract] dated [insert date] with the Beneficiary, for the supply of _ [insert name of contract and brief description of Goods and Related Services] (hereinafter called "the Contract").Furthermore, we understand that, according to the conditions of the Contract, a performance guarantee is required.At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of [insert amount in figures]( ) [insert amount in words],1 such sum being payable in the types and proportions of currencies in which the Contract Price is payable, upon receipt by us of the Beneficiary’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without the Beneficiary needing to prove or to show grounds for your demand or the sum specified therein.This guarantee shall expire, no later than the .... Day of ......, 2...2, and any demand for payment under it must be received by us at this office indicated above on or before that date.This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a) is hereby excluded._____________________[signature(s)]Note: All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.Advance Payment SecurityDemand Guarantee[Guarantor letterhead or SWIFT identifier code]Beneficiary: [Insert name and Address of Purchaser]Date: [Insert date of issue]ADVANCE PAYMENT GUARANTEE No.: [Insert guarantee reference number]Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]We have been informed that [insert name of Supplier, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called “the Applicant”) has entered into Contract No. [insert reference number of the contract] dated [insert date] with the Beneficiary, for the execution of [insert name of contract and brief description of Goods and related Services] (hereinafter called "the Contract").Furthermore, we understand that, according to the conditions of the Contract, an advance payment in the sum [insert amount in figures] () [insert amount in words] is to be made against an advance payment guarantee.At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of [insert amount in figures]( ) [insert amount in words]1 upon receipt by us of the Beneficiary’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant has used the advance payment for purposes other than toward delivery of Goods.A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Beneficiary’s bank stating that the advance payment referred to above has been credited to the Applicant on its account number [insert number] at [insert name and address of Applicant’s bank].The maximum amount of this guarantee shall be progressively reduced in proportion to the value of the Goods shipped (for Goods supplied from abroad) and/or the value of the Goods delivered at the named place of destination (for Goods supplied from within the Purchaser’s country), as evidenced by copy(ies) of [ ].[7]This Guarantee shall expire upon our receipt of copy(ies) of the above referenced documents, evidencing that at least ninety (90) percent of the Contract Price of the Goods has been delivered or on the [insert day] day of [insert month], [insert year][8], whichever is earlier.Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010 Revision, ICC Publication No.758, except that the supporting statement under Article 15(a) is hereby excluded.____________________[signature(s)]Note: All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.SCHEDULE 4: Secondary ProcurementThis Section contains the methods and the criteria that the Procuring Agency shall use to conduct a Secondary Procurement process to select a Supplier and award a Call-off Contract under this Framework Agreement.• Secondary Procurement method(s)The Secondary Procurement method(s) that apply to the selection of a Supplier for the award of a Call-off Contract under this Framework Agreement are:• competitive quotations through mini-competition,• direct selection based on location.The procedure for the application of the procurement methods outlined under paragraph 1 above are the following.• Competitive quotations (mini-competition)The Purchaser will prepare a Request for Quotation (RFQ) and invite all eligible Suppliers holding a Framework Agreement that includes the Goods to be procured under the Call-off contract, to submit competitive quotations.The RFQ will include:• the Goods, and any Related Services, to be delivered• delivery location(s)• delivery date(s) or schedule• quantity• any additional requirement for inland transportation and other services in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ not included in the Base Price,• details of any inspections or tests that are additional to those described in the Framework Agreement• the criteria to be applied to the evaluation of quotations• the award criteria, e.g.:The Purchaser shall award the Call-off Contract to the Supplier whose Bid(s) has been determined to be:substantially responsive to the RFQ; andthe lowest evaluated cost.• deadline for submission of quotations• reference the Call-off Contract Terms and Conditions of supply, which are to apply to the purchase• request to Suppliers to demonstrate that they continue to be eligible and qualified to supply the GoodsSuppliers are not permitted to quote a price, excluding any additional price for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ not included in the Base Price, that is higher than the Base Price stated in the Framework Agreement, Schedule 2, or as adjusted by the agreed price adjustment formula, if applicable in accordance with FAP 8, and any changes in any Laws and Regulations in accordance with FPA 9.• Direct Selection under Single-Supplier Framework AgreementThe Purchaser may request the Supplier to include in the Call-off Contract Price, the prices for any additional inland transportation and other related services in the Purchaser’s Country to convey the Goods to their final destination.The Purchaser will issue a Call-off Contract to the Supplier using the prices/pricing mechanism set out in the Framework Agreement, Schedule 2 or as adjusted by the agreed price adjustment formula if applicable in accordance with FAP 8, and any changes in any Laws and Regulations in accordance with FAP 9; including, as applicable, the prices for any additional inland transportation and other related services in the Purchaser’s Country to convey the Goods to their final destination.• Direct selection based on locationThe Purchaser will select an eligible Supplier holding a Framework Agreement, to deliver the Goods, based on which Supplier is best able to deliver the Goods, and any Related Services, based on the location where the Goods are to be supplied.The Purchaser will issue a Call-off Contract using the prices/pricing mechanism set out in the Framework Agreement, Schedule 2 or as adjusted by the agreed price adjustment formula, if applicable in accordance with FAP 8, and any changes in any Laws and Regulations in accordance with FAP 9; including, as applicable, the prices for any additional inland transportation and other related services in the Purchaser’s Country to convey the Goods to their final destination.The Purchaser may request the Supplier and include in the Call-off Contract Price, the prices for any additional inland transportation and other related services in the Purchaser’s Country to convey the Goods to their final destination.• Formation of Call-off contractThe Purchaser shall confirm that the selected Supplier continues to be qualified and eligible in accordance with Framework Agreement prior to the formation of the Call-off Contract. The Call-off Contract is formed when one of the following conditions are met depending on the method of selection used for the Secondary procurement.• For competitive quotations through mini-competition using a Request for Quotation, the Call-off contract if formed when: [select one of the three Options]OPTION 1“the Purchaser issues, the Letter of Award of Call-off Contract to the successful Supplier.” [add if applicable: “Following the formation of contract, through offer and acceptance, the Purchaser and Supplier shall sign a Call-off Contract as per the form contained in the Framework Agreement.”] OROPTION 2“the Purchaser transmits, to the successful Supplier, a Call-off Contract for signature and return, and the Call-off Contract is signed by both the Purchaser and the Supplier. The date that the Call-off Contract is formed, is the date that the last signature is executed.”OPTION 3“the Purchaser transmits, to the successful Supplier, a purchase order for the Goods and the supplier accepts the order.” (describe how this will happen, e.g. through return email, signed Purchase Order, etc.).• For direct selection based on location or balanced division of supply, the Call-off contract is formed when the Purchaser transmits, to the successful Supplier, a Call-off Contract for signature and return, and the Call-off Contract is signed by both the Purchaser and the Supplier. The date that the Call-off Contract is formed, is the date that the last signature is executed, or the date agreed by the parties.• Communicating the award of Call-off ContractThe Purchaser shall, at the same time as awarding the contract, communicate the award of the Call-off Contract in the case of:• Direct Selection to all FA Suppliers for the items included in the Call-off Contract.• selection based on competitive quotations (through mini-competition) to all Suppliers invited to submit quotations.The communication must be by the quickest means possible, e.g. by email, and include, as a minimum, the following information:• the name and address of the successful Supplier• the quantity/volume of Goods being procured• the contract price• a statement of the reason(s) the recipient Supplier was unsuccessful.]• Complaint about award of Call-off ContractAn unsuccessful Supplier may complain about the decision to award a Call-off Contract. In this case the process for making a complaint is as follows:• the complaint shall be made in writing to the Purchaser, by the quickest means available, e.g. email• the Purchaser will address the complaint within a reasonable time• the receipt of a complaint does not prohibit the award of the Call-off Contract, and no standstill period or pause in process shall apply..Request for QuotationSecondary Procurement under a Framework Agreement(method: mini-competition)From: | [Insert Purchaser’s legal name]Purchaser’s Representative: | [Insert name of Purchaser’s Representative]Title/Position: | [Insert Representatives title or position]Address: | [Insert Purchaser’s address]Telephone: | [Insert Representatives telephone number]Email: | [Insert Representatives email address]To: | [Insert Supplier’s legal name]Supplier’s Representative: | [Insert name of Supplier’s Representative]Title/Position: | [Insert Representatives title or position]Address: | [Insert Supplier’s address]Telephone: | [Insert Representatives telephone number]Email: | [Insert Representatives email address]Framework Agreement (FA): | [Insert short title of FA]FA Date: | [Insert FA Date]FA Reference No. | [Insert FA reference]RFQ Ref No.: | [Insert reference]RFQ Date: | [Insert date of RFQ]RFQ issued: | This RFQ has been transmitted by: “post” or “email” or “fax”Attachments:Annex 1: Purchaser’s RequirementsAnnex 2: Quotation FormAnnex 3: Call-off Contract for Supply of Goods [this may be the Call-off Contract Form or another acceptable template]Dear [insert name of Supplier’s Representative],• Request for Quotation (RFQ)With reference to above Framework Agreement (FA), you are invited to submit your most competitive Quotation in this Secondary Procurement process. The Quotation is for the Goods [add if applicable: “and the Related Services,”] described in Annex 1: Purchaser’s Requirements, attached to this RFQ.• Price• Your Quotation must be submitted in the format contained in Annex 2: Supplier Quotation Form.• Your Quotation, excluding any additional price for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ not included in the Base Price, cannot be higher than the Base Price for the Goods [add if applicable: “and Related Services,”] as established in the Framework Agreement, Schedule 2: Price Schedules adjusted for any change in Laws and Regulations in accordance with FA Specific Provisions. [OR use the following text if the Base Price is subject to a price adjustment: Your Quotation cannot be higher the Base Price for the Goods [add if applicable: “and Related Services,”] as established in the Framework Agreement, Schedule 2: Price Schedules, adjusted by applying the price adjustment formula and any adjustment for change in Laws and Regulations in accordance with FA Specific Provisions”]• The price for any additional inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ not included in the Base Price shall be quoted.• The price that you quote shall be fixed and shall not be subject to any further adjustment.• The Quotation shall be in the same currency(ies) specified in the Framework Agreement, Schedule 2: Price Schedules.• The Quotation will be valid for a period of [insert number of calendar days]• ClarificationsIf you require clarification(s) regarding this RFQ, send your request in writing (email or hard copy or through e-procurement system if available) to our above-named Representative before [insert date and time]. We shall forward copies of our response to all Suppliers including a description of the inquiry but without identifying its source.• Submission of QuotationsQuotations are to be submitted in the form attached in Annex 2: by email to the following address; Attention: Ms. Thobeka Gama, Procurement Specialist; E-mail address: thobeka.gama@eec.co.szOffers submitted as email attachments shall be in the form of scanned non- editable images. To facilitate the procurement process, the Procuring Agency may require copies of the same quotations in other formats (such as in Word or Excel)]The deadline for submission of Quotations is [insert time, day, month, year]. Please inform us within [insert number of days] if you do not intend to submit a quotation.• Opening of QuotationsQuotations will be opened on [[insert time, day, month, year] by the Procuring Agency’s representatives in the presence of the Supplier’s designated representatives who choose to attend the virtual opening [Under the COVID-19 emergency situation, if virtual opening is not feasible, the offers may be opened by the Procuring Agency’s representatives only]. Minutes of the opening will be shared with all suppliers who submitted quotations.• Evaluation of QuotationsQuotations will be evaluated item-wise and according to the criteria and methodology described in the Framework Agreement, Schedule 4: Secondary Procurement.• At the time of Contract Award, the Supplier (including each subcontractor proposed by the Supplier) shall not be subject to disqualification by the Bank for non-compliance with SEA/ SH obligations. Prior to Contract award, the Purchaser will verify that the successful Bidder (including each member of a JV) is not disqualified by the Bank due to noncompliance with contractual Sexual Exploitation and Abuse (SEA) /Sexual Harassment (SH) prevention and response obligations. The Purchaser will conduct the same verification for each subcontractor proposed by the successful Bidder. If any proposed subcontractor does not meet the requirement, the Purchaser will require the Bidder to propose a replacement subcontractor.In this regard, “Sexual Exploitation and Abuse” “(SEA)” means the following:Sexual Exploitation is defined as any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another.Sexual Abuse is defined as the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions.“Sexual Harassment” “(SH)” is defined as unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature by contractor’s personnel with other contractor’s, subcontractors’ or employer’s personnel.• ContractAttached, as Annex 3 to this RFQ, is the draft Call-off Contract that will apply to this Secondary Procurement. If successful, you will be required to sign a Call-off Contract on the same, or similar terms. [Instructions: complete a draft Call-off Contract for this procurement and attach it to this RFQ]On behalf of the Purchaser:Signature:Name:Title/position:RFQ ANNEX 1: Purchaser’s Requirements[The Purchaser shall complete these tables, as appropriate, to enable the Supplier to prepare the Quotation]List of Goods and Delivery PeriodLine Item N° | Description of Goods | Quantity required | Physical unit | Named Place of Destination | Place of Final Destination (Project Site) | Applicable Incoterms (e.g. CIP, EXW etc.) | Delivery Period from Date of formation of Call-off contractList of Related Services and Completion ScheduleService | Description of Service | Quantity required | Physical Unit | Place where Services shall be performed | Completion Period of Services[insert Service No] | [insert description of Related Services] | [insert quantity of items to be supplied] | [insert physical unit for the items] | [insert name of the Place] | [insert no. of days such as from Delivery Period or receipt of Goods, as appropriate]Technical Specifications, Drawings, Inspections and TestsThe Technical Specifications, Drawings, Inspections and Tests as described in the Framework Agreement Schedule 1: Schedule of Requirements.RFQ ANNEX 2: Supplier Quotation FormFrom: | [Insert Supplier’s legal name]Supplier’s Representative: | [Insert name of Supplier’s Representative]Title/Position: | [Insert Representatives title or position]Address: | [Insert Supplier’s address]Email: | [Insert Supplier’s email address]To: | [Insert Purchaser’s legal name]Purchaser’s Representative: | [Insert name of Purchaser’s Representative]Title/Position: | [Insert Representatives title or position]Address: | [Insert Purchaser’s address]Framework Agreement (FA) | [Insert short title of FA]FA Reference No. | [Insert Purchaser’s FA reference]Date of Framework Agreement: | [Insert FA date]RFQ Ref No.: | [Insert Purchaser’s reference]Date of Quotation: | [Insert date of Quotation]Dear [insert name of Purchaser’s Representative]SUBMISSION OF QUOTATION• Conformity and no reservationsIn response to the above named RFQ we offer to supply the Goods, [add if applicable: “and deliver the Related Services,”] as per this Quotation and in conformity with the RFQ, Delivery and Completion Schedules, Technical Specifications, Drawings, Inspections and Tests. We confirm that we have examined and have no reservations to the RFQ, including the Call-off Contract.• Eligibility and conflict of interestWe declare that we continue to be qualified, and meet the eligibility requirements and that we have no conflict of interest. If awarded the Call-off Contract, the Goods [add if applicable: “and Related Services,”] that we supply shall be sourced from an eligible country.Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH): [select the appropriate option from (i) to (iii) below and delete the others. In case of JV members and/or subcontractors, indicate the status of disqualification by the Bank of each JV member and/or subcontractor].We, including any of our subcontractors:• [have not been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]• [are subject to disqualification by the Bank for non-compliance with SEA/ SH obligations.]• [had been subject to disqualification by the Bank for non-compliance with SEA/ SH obligations, and were removed from the disqualification list. An arbitral award on the disqualification case has been made in our favor.]We, along with any of our subcontractors, suppliers, consultants, manufacturers, or service providers for any part of the contract, are not subject to, and not controlled by any entity or individual that is subject to, a temporary suspension or a debarment imposed by the World Bank Group or a debarment imposed by the World Bank Group in accordance with the Agreement for Mutual Enforcement of Debarment Decisions between the World Bank and other development banks. Further, we are not ineligible under the Purchaser’s Country laws or official regulations or pursuant to a decision of the United Nations Security Council.• Quotation PriceThe total price of our quotation, excluding any unconditional discounts offered in item (g) below is [insert the total price of the offer in words and figures, indicating the various amounts and the respective currencies].• Unconditional DiscountsThe unconditional discounts offered are: [Specify the discount offered.]The exact method of calculations to determine the net price after application of unconditional discounts is: [Specify the method that shall be used to apply the discounts].• Quotation Validity PeriodOur Quotation shall be valid for the period specified in RFQ, and it shall remain binding upon us and may be accepted at any time before it expires.• Performance Security [delete if no performance security is required]If we are awarded the Call-off Contract, we commit to obtain a Performance Security in accordance with the RFQ.• Commissions, gratuities, feesWe have paid, or will pay the following commissions, gratuities, or fees with respect to this Quotation or execution of a Call-off Contract [If none has been paid or is to be paid, indicate “none.”]Name of Recipient | Address | Reason | Amount• Not Bound to AcceptWe understand that you reserve the right to:• accept or reject any Quotation and are not bound to accept the lowest evaluated cost Quotation, or any other Quotation that you may receive, and• annul the RFQ process at any time prior to the award of a Call of Contract without incurring any liability to Suppliers.• Fraud and CorruptionWe hereby certify that we have taken steps to ensure that no person acting for us, or on our behalf, engages in any type of Fraud and Corruption.On behalf of the Supplier:Signature:Name:Title/position:Telephone:Email:Quotation for Goods: Price Schedule 1For Goods to be imported from outside the Purchaser’s Country1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9Line ItemN° | Description of Goods | Country of Origin | Delivery Period as defined by Incoterms | Quantity and physical unit | Unit price cip [insert place of destination] | CIP Price per line item(Col. 5x6) | [ For CIP, if in addition inland transportation etc. is required] Price per line item for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination specified in RFQ | Total Price per Line item (Col. 7+8)[insert number of the item] | [insert name of good] | [insert country of origin of the Good] | [insert quoted Delivery Period] | [insert number of units to be supplied and name of the physical unit] | [insert unit price CIP per unit] | [insert total CIP price per line item] | [insert the corresponding price per line item] | [insert total price of the line item]Quotation PriceQuotation for Goods: Price Schedule 2For Goods from within the Purchaser’s Country (already imported* to or manufactured in the Purchaser’s Country)1 | 2 | 3 | 4 | 5 | 6 | 7 | 8Line ItemN° | Description of Goods | Delivery Period as defined by Incoterms | Quantity and physical unit | Unit price EXW* (plus prices to deliver to place of destination, if required) | Total EXW (plus prices to deliver to place of destination, if required) price per line item(Col. 4 ́5) | [If required by the Purchaser] Price per line item for inland transportation and other services required in the Purchaser’s Country to convey the Goods to their final destination | Total Price per line item(Col. 6+7)[insert number of the item] | [insert name of Good] | [insert quoted Delivery Date] | [insert number of units to be supplied and name of the physical unit] | [insert EXW (plus prices to deliver to place of destination, if required) unit price] | [insert total EXW (plus prices to deliver to place of destination, if required) price per line item] | [insert the corresponding price per line item] | [insert total price per item]*for already imported Goods, in accordance with the Primary Procurement process, the EXW price shall exclude any custom duties and other import taxes on the Goods. Provide supporting documentary evidence on custom duties and other import taxes already paid or to be paid on the Goods.Quotation for Related Services: Price Schedule 31 | 2 | 3 | 4 | 5 | 6 | 7Item No. | Item description | Description of Services (excludes inland transportation and other services required in the Purchaser’s Country to convey the goods to their final destination) | Country of Origin | Completion Period at place of Final destination | Quantity and physical unit | Unit price | Total Price per Service (Col. 5*6 or estimate)[insert number of the item] | [insert name of Services] | [insert country of origin of the Services] | [insert Delivery Period at place of final destination per Service] | [insert number of items to be supplied and name of the physical unit] | [insert unit price] | [insert total price per item]Quotation PriceTotal Quotation PriceThe total cost for the supply and delivery of the Goods, and related Services is as follows:Price Schedules | AmountGoods: Price Schedule 1Goods: Price Schedule 2Related Services: Price Schedule 4Total Quotation PriceSample Letter of Award of Call-off Contract[modify as appropriate][use letterhead paper of the Purchaser][date]To: [name and address of the Supplier]Subject: Notification of Award of Call-off Contract No.In reference to the Framework Agreement [insert reference number and date] [For mini-competition, add the following: “and your Quotation [insert reference number and date] has been accepted.”] please find enclosed herewith the Call-off Contract. You are requested to sign the Call-off contract within [insert no of days].[Delete if Performance Security is not required: “You are also requested to furnish a Performance Security within [insert no of days], using for that purpose the Performance Security Form attached to the Framework Agreement”]Authorized Signature:Name and Title of Signatory:Name of Agency:Attachment: Call-off ContractCall-off Contract for the supply of Goods and Related Services [if any]Framework Agreement (FA): | [insert short title of FA]FA Date: | [insert FA date]FA reference number: | [insert FA reference number]Goods: | [short title for type of Goods]The Project Site(s)/Final Destination(s) is/are: | [Insert information on the location(s) of the site(s), where applicable]Site of inspections and tests | [Insert information, where applicable]Purchaser: | Supplier:[Insert complete legal name of the Purchaser][address] | [Insert complete legal name of the Supplier] [address]GOODSCode | Product name | Quantity | Unit price | Total[insert code] | [description of Goods] | [number] | [price] | [amount]Special instructions/comments: | Total | [Insert amount]Required Delivery period/s as per INCOTERMS | [insert period/s] as per applicable INCOTERMSRELATED SERVICESCode | Name/description of service | Quantity | Price | Total[insert code] | [Describe the Related Services covered and/or Framework Agreement Schedule 1: Schedule of Requirements. The price quoted in Schedule 2 of the Framework Agreement or as agreed with the selected Supplier shall be included in the Contract Price.] | [number] | [price] | [amount]Special instructions/comments: | Total | [insert amount]Required Completion period | [insert period]• Contract PriceThe Contract Price for the supply of Goods, and provision of related Services (if applicable) is as followsDescription | Amounts and currency/ies [insert total amounts from preceding two tables]GoodsRelated Services [if applicable]Contract Price: [ insert total for Goods and Related Services [if applicable]• Contract DocumentsThe following documents shall be deemed to form and be read and construed as part of this Call-off Contract. This Call-off Contract shall prevail over all other contract documents.• Letter of Award of Call-off Contract• Supplier’s Quotation (if applicable)• Addenda No. ___ (if any)• Call-off Contract- Conditions of Contractand by reference the following documents:• Framework Agreement• Schedule 1: Schedule of Requirements [insert relevant items from schedule 1 as applicable to the Call-off contract such as technical specifications, any drawings, and inspection and tests]• [List any other document]• In consideration of the payments to be made by the Purchaser to the Supplier as specified in this Call-off Contract, the Supplier hereby covenants with the Purchaser to provide the Goods and Services and to remedy defects therein in conformity in all respects with the provisions of the Contract.• The Purchaser hereby covenants to pay the Supplier in consideration of the provision of the Goods and Services and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.[To facilitate this emergency procurement, if acceptable to the Purchaser and the Supplier, electronic signature of the Call-off Contract such as using DocuSign is recommended.]For and on behalf of the PurchaserSigned: [insert signature]in the capacity of [insert title or other appropriate designation]In the presence of [insert identification of official witness]Date:__________________________For and on behalf of the SupplierSigned: [insert signature of authorized representative(s) of the Supplier]in the capacity of [insert title or other appropriate designation]in the presence of [insert identification of official witness]Date:__________________________Call-off Contract- Conditions of Contract (CoC)The following Call-off Contract Conditions of Contract apply to the Call-off Contract awarded under the Framework Agreement between the Purchaser and the Supplier.• Standards and SpecificationsThe Goods and Related Services if applicable shall conform to the technical specifications and standards mentioned in the Technical Specifications and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods’ country of origin.• Packing, Marking and DocumentationThe Supplier shall provide such packing of the Goods as is required to prevent their damage or deterioration during transit to their final destination. During transit, the packing shall be sufficient to withstand, without limitation, rough handling and exposure to extreme temperatures, salt and precipitation, and open storage. Packing case size and weights shall take into consideration, where appropriate, the remoteness of the Goods’ final destination and the absence of heavy handling facilities at all points in transit.The packing, marking and documentation within and outside the packages shall be: provided on the item technical description/ specification.• TransportationResponsibility for transportation of the Goods shall be as specified in the applicable Incoterms specified in the Framework Agreement.• Shipping and Other DocumentsDetails of Shipping and other Documents to be furnished by the Supplier are: Manufacturer’s or Supplier’s warranty certificate, inspection certificate issued any nominated inpection agency, invoice and delivery note.The above documents shall be received by the Purchaser:• on shipment.• Terms of PaymentThe method and conditions of payment to be made to the Supplier under the Call-off Contract shall be as follows:The Purchaser shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.Payment for Goods and Services supplied from within the Purchaser’s Country:Payment for Goods and Services supplied from within the Purchaser’s Country shall be made in SZL, as follows: within thirty (30) days after submission of statement.• Performance SecurityA Performance Security shall normally not be required for the subject emergency procurement. In exceptional circumstances, if a Performance Security is requiredThe Supplier shall provide a performance security for the performance of the Contract, within the period stated in the Letter of Award of Call-off, using for that purpose the Performance Security Form attached to the Framework Agreement.The proceeds of the Performance Security shall be payable to the Purchaser as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.The amount of the Performance Security shall be: 1% of the Contract Price, denominated in the currency(ies) of the Contract, or in a freely convertible currency acceptable to the Purchaser. The Performance Security shall be in the form attached to the Framework Agreement.The Performance Security shall be discharged by the Purchaser and returned to the Supplier not later than fourteen (14) days following the date of Completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless specified otherwise.• Taxes and DutiesFor Goods manufactured outside the Purchaser’s Country, the Supplier shall be entirely responsible for all taxes, stamp duties, license fees, and other such levies imposed outside the Purchaser’s Country.For Goods Manufactured within the Purchaser’s Country, the Supplier shall be entirely responsible for all taxes, duties, license fees, etc., incurred until delivery of the contracted Goods to the Purchaser.For Goods manufactured outside the Purchaser’s Country, the Purchaser shall bear and pay all custom duties and import duties on the contracted Goods. For already imported Goods, to enable reimbursemnt to the Supplier and/or payment to the relevant bodies as appropriate, the Supplier shall furnish documentary evidence on custom duties and other import taxes already paid or to be paid on the Goods.The Purchaser shall bear and pay for any Purchaser’s Country sales tax and other taxes which may be payable on the Goods.If any tax exemptions, reductions, allowances or privileges may be available to the Supplier in the Purchaser’s Country, the Purchaser shall use its best efforts to enable the Supplier to benefit from any such tax savings to the maximum allowable extent.• InsuranceThe insurance coverage shall be as specified in the applicable Incoterms specified in the Framework Agrement. CIP -Incoterm 2020.• WarrantyIn addition to the general waranty obligations specified in the Framework Agreemnt:The warranty shall remain valid for twelve (12) months after the Goods, or any portion thereof as the case may be, have been delivered to and accepted at the final destination.The period for repair or replacement after being notified of the defect by the Purchaser shall be thirty (30) days. If having been notified, the Supplier fails to remedy the defect within this period, the Purchaser may proceed to take within a reasonable period such remedial action as may be necessary, at the Supplier’s risk and expense and without prejudice to any other rights which the Purchaser may have against the Supplier under the Contract.For purposes of the warranty, the place(s) of final destination(s) shall be as stated in this Call-off Contract.• Liquidated Damages and BonusesExcept as provided for under the Framework Agreement under Force Majeure, if the Supplier fails to deliver any or all of the Goods by the Date(s) of delivery or perform the Related Services within the period specified in the Contract, the Purchaser may without prejudice to all its other remedies under the Contract, deduct from the Contract Price, as liquidated damagesThe liquidated damage shall be 1% the price of the delayed Goods or unperformed Services] for each week or part thereof of delay until actual delivery or performance.The maximum amount of liquidated damages shall be 10% of the Contract Price. Once the maximum is reached, the Purchaser may terminate the Call-off Contract pursuant to the Framework Agreement provision on Termination.• Change Orders and Contract AmendmentsThe Purchaser may at any time order the Supplier through notice, to make changes within the general scope of the Call-off Contract in any one or more of the following:• drawings, designs, or specifications, where Goods to be furnished under the Call-off Contract are to be specifically manufactured for the Purchaser;• the method of shipment or packing;• the place of delivery; and• the Related Services to be provided by the Supplier.If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier’s performance of any provisions under the Contract, an equitable adjustment shall be made in the Call-off Contract Price or in the Delivery/Completion schedule, or both, and the Call-off Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier’s receipt of the Purchaser’s change order.Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Call-off Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.• Extensions of TimeIf at any time during performance of the Call-off Contract, the Supplier or its subcontractors should encounter conditions impeding timely delivery of the Goods or completion of Related Services, the Supplier shall promptly notify the Purchaser in writing of the delay, its likely duration, and its cause. As soon as practicable after receipt of the Supplier’s notice, the Purchaser shall evaluate the situation and may at its discretion extend the Supplier’s time for performance, in which case the extension shall be ratified by the parties by amendment of the Contract.Except in case of Force Majeure, as provided for in the Framework Agreement, a delay by the Supplier in the performance of its Delivery and Completion obligations shall render the Supplier liable to the imposition of liquidated damages specified above, unless an extension of time is agreed upon.• Dispute Resolution in relation to Call-off ContractAs stated in the FA provisions, the Purchaser and the Supplier shall make every effort to resolve amicably by direct informal negotiation and if needed using an adjudicator, any disagreement or dispute arising between them under or in connection with the Call-off Contract.If, after twenty-eight (28) days, the parties have failed to resolve their dispute or difference by such mutual consultation and adjudication if used, then either the Purchaser or the Supplier may give notice to the other party of its intention to commence arbitration, as hereinafter provided, as to the matter in dispute, and no arbitration in respect of this matter may be commenced unless such notice is given. Any dispute or difference in respect of which a notice of intention to commence arbitration has been given in accordance with this provision shall be finally settled by arbitration. Arbitration may be commenced prior to or after delivery of the Goods under the Contract. Arbitration proceedings shall be conducted in accordance with the rules of procedure specified below.Notwithstanding any reference to arbitration herein,• the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree; andthe Purchaser shall pay the Supplier any monies due the Supplier.(a) Contract with foreign Supplier:All disputes arising out of or in connection with the present contract shall be finally settled under the Rules of Arbitration of the International Chamber of Commerce by one or more arbitrators appointed in accordance with the said Rules.(b) Contracts with Supplier national of the Purchaser’s Country:In the case of a dispute between the Purchaser and a Supplier who is a national of the Purchaser’s Country, the dispute shall be referred to adjudication or arbitration in accordance with the laws of the Purchaser’s Country.]14.1 The Supplier shall have a code of conduct, and provide appropriate sensitization, for the Supplier’s personnel carrying out installation/ operation/ maintenance/ operation and maintenance that include, but not limited to, maintaining a safe working environment and not engaging in the following practices:• any form of sexual harassment including unwelcome sexual advances, requests for sexual favors, and other verbal or physical conduct of a sexual nature with other Supplier’s or Purchaser’s personnel;• any form of sexual exploitation, which means any actual or attempted abuse of position of vulnerability, differential power or trust, for sexual purposes, including, but not limited to, profiting monetarily, socially or politically from the sexual exploitation of another;• any form of sexual abuse, which means the actual or threatened physical intrusion of a sexual nature, whether by force or under unequal or coercive conditions; and• any form of sexual activity with individuals under the age of 18, except in case of pre-existing marriage.• The Purchaser may require the Supplier to remove (or cause to be removed), from the site or other places where the [state as applicable: installation/ operation/ maintenance/ operation and maintenance] is being executed, a Supplier’s personnel that undertakes behaviors that are not consistent with the code of conduct stated in 14.1. Notwithstanding any requirement from the Purchaser to replace any such person, the Supplier shall immediately remove (or cause to be removed) any such person, from the site or other places where the [state as applicable: installation / operation / maintenance/ operation and maintenance] is being executed. In either case, the Supplier shall promptly appoint, as appropriate, a suitable replacement with equivalent skills and experience.• The Supplier, including its Subcontractors/ suppliers/ manufacturers shall take all technical and organizational measures necessary to protect the information technology systems and data used in connection with the Call-off Contract. Without limiting the foregoing, the Supplier, including its Subcontractors/ suppliers/ manufacturers, shall use all reasonable efforts to establish, maintain, implement and comply with, reasonable information technology, information security, cyber security and data protection controls, policies and procedures, including oversight, access controls, encryption, technological and physical safeguards and business continuity/disaster recovery and security plans that are designed to protect against and prevent breach, destruction, loss, unauthorized distribution, use, access, disablement, misappropriation or modification, or other compromise or misuse of or relating to any information technology system or data used in connection with the Call-off Contract”.[1] For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an Addendum or amendment introducing a material modification to any existing contract.[2] A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the Bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the Bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.[3] Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.[4] For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.[5] A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.[6] Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.1 The Guarantor shall insert an amount representing the percentage of the contract Amount denominated either in the currency(ies) of the Contract or a freely convertible currency acceptable to the Beneficiary.2 Insert the date twenty-eight days after the expected completion date specified in the Call-off Contract. The Purchaser should note that in the event of an extension of this date for completion of the Contract, the Purchaser would need to request an extension of this guarantee from the Guarantor. Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Purchaser might consider adding the following text to the form, at the end of the penultimate paragraph: “The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed [six months] [one year], in response to the Beneficiary’s written request for such extension, such request to be presented to the Guarantor before the expiry of the guarantee.”1 The Guarantor shall insert an amount representing the amount of the advance payment and denominated either in the currency(ies) of the advance payment as specified in the Contract, or in a freely convertible currency acceptable to the Purchaser.[7] Insert shipping/other applicable documents establishing “delivery” of the Goods in accordance with the applicable Incoterm to the Contract.[8] Insert the Delivery date in accordance with the Contract. The Purchaser should note that in the event of an extension of the time to perform the Contract, the Purchaser would need to request an extension of this guarantee from the Guarantor. Such request must be in writing and must be made prior to the expiration date established in the guarantee. In preparing this guarantee, the Purchaser might consider adding the following text to the form, at the end of the penultimate paragraph: “We agree to a one-time extension of this guarantee for a period not to exceed [six months][one year], in response to the Purchaser’s written request for such extension, such request to be presented to us before the expiry of the guarantee.”[A1]The proposed technical factors are more related to qualification requirement except the delivery schedule. Please propose the factors that have impact on the quality, performance, risk identification and mitigation mechanism, logistics or supply chain and related factors.
Provenance
The notice above is the public record. In the terminal this tender carries the analysis: a cited eligibility checklist, the lifecycle timeline, estimated value, document links and contacts, award context, the funder’s debrief rules, and on-demand bid-readiness analysis on Analyst.
Counts only: the content unlocks with Professional. How the workflow fits together is on the tenders page.
World Bank
World Bank
World Bank
World Bank
| Field | How we know | State | Confidence |
|---|---|---|---|
| Publication date | Official API or feed | Data quality: Source-backed | 100 |
| Buyer | Official API or feed | Data quality: Source-backed | 100 |
| Reference number | Official API or feed | Data quality: Source-backed | 100 |
| Submission deadline | Official API or feed | Data quality: Source-backed | 100 |
| Contract value | — no amount in the source record | Data quality: Not available | — |
| Sectors | — | Data quality: Not available | — |
| Contacts | Official API or feed | Data quality: Source-backed | 100 |
| Documents | — | Data quality: Not available | — |
| requirements | — no requirements extracted from this notice yet | Data quality: Not available | — |
| Lifecycle stage | Official API or feed derived from the notice type and status the source published | Data quality: Source-backed | 90 |
States describe GLODA's confidence in its own fields, never a judgement on the notice or its parties. Methodology
GLODA indexes publicly available notices from the funders and organizations it covers. We are an independent platform and are not affiliated with, or endorsed by, any indexed organization.
© 2026 Global Development Alliance LLC. All rights reserved.