Contractor intelligence · computed from public award records
ARACO CONSTRUCTION LIMITED
- Awards won
- 9
- Known value
- USD 12.5M
- First award
- 29 Jun 2007
- Most recent
- 22 Oct 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 9 | USD 12.5M | 22 Oct 2024 |
Where the work is
GH · 2
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- TW- Lot 9 Construction of Small-Town Water System with 2 Mechanized Boreholes, 1No. 100m3 Concrete High Level Tank (HLT), 1.8km distribution lines, 5No. public standpipe at Loagri in the West Mampr · 22 Oct 2024 · USD 32K · World Bank
- BH – Lot 7 Siting, Drilling and Installation of 5No. Borehole Fitted with Handpump at Suhuluya, Gbeo, Wulugu, Kpatusi, Duu and Siting, Drilling and Mechanization of 1No. Borehole at Kparigu in · 22 Oct 2024 · USD 32K · World Bank
- Improvement Works at Nima Drain. · 15 Sept 2023 · USD 9.6M · World Bank
- Drilling of 30 no. source boreholes for the design of 7 no. piped water systems in high flouride areas in Bongo in the Upper East and Chereponi in the Northern Region · 23 May 2019 · USD 106K · World Bank
- Construction of Denugu-Danvorga Small Towns Water System between Garu-Gempane District Assembly and Araco Construction Limited · 13 Oct 2009 · USD 540K · World Bank
- Construction of Denugu-Danvorga Small Town Water System · 13 Oct 2009 · USD 540K · World Bank
- Construction of Tempane-Yabrago Small Town Water System between Garu Tempane District Assembly and Araco Construction Limited · 13 Oct 2009 · USD 620K · World Bank
- CONSTRUCTION OF SMALL TOWNS WATER SYSTEM FOR ASSIN ASAMANKESE/ACHIASE · 11 Dec 2008 · USD 618K · World Bank
- CONSTRUCTION OF BINABA/KUSANABA SMALL TOWN WATER SUPPLY SYSTEM - BAWKU WEST DA · 29 Jun 2007 · USD 367K · World Bank
Method
Computed from 9 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.