Skip to main content

Contractor intelligence · computed from public award records

ASHISH

Awards won
14
Known value
USD 159K
First award
22 Dec 2021
Most recent
18 Aug 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank14USD 159K18 Aug 2025

Where the work is

IN · 14

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • 5June.Construction of Primary Water Harvesting & Secondary storage Structure in Gram Panchayat Top Ki Behar and Dangari under APO Kandaghat. · 18 Aug 2025 · USD 11K · World Bank
  • 5June.Construction of Primary Water Harvesting & Secondary storage Structure in Gram Panchayats Dhangeel and Hinner APO Unit Kandaghat. · 18 Aug 2025 · USD 11K · World Bank
  • 10May. Construction of Primary Water Harvesting & Secondary storage Structure in Gram Panchayats Dhangeel and Hinner APO Unit Kandaghat. · 14 Aug 2025 · USD 16K · World Bank
  • 14.Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Seri, Padag & Mahi . · 14 Oct 2024 · USD 12K · World Bank
  • 10.Construction of Drainage Line Treatment, Primary Water Harvesting & Secondary storage Structure in GPs Dhangeel, Hinner & Nagali. · 14 Oct 2024 · USD 28K · World Bank
  • 6.Establish a link between Primary Water Storage Structure to Secondary Water Storage Structure with laying of HDPE/GI Pipes and fixing of Pumps in different Gram Panchayats in all APO units under DPO · 25 Nov 2023 · USD 9K · World Bank
  • 7.Establish a link between Primary Water Storage Structure to Secondary Water Storage Structure with laying of HDPE/GI Pipes and fixing of Pumps in different Gram Panchayats in all APO units under DPO · 25 Nov 2023 · USD 6K · World Bank
  • 6.Structures for Secondary Storage, Construction of Roof Rain Water Harvesting for community tank under the jurisdiction of APO unit kandaghat at different Gram Panchayats and different locations. · 05 Sept 2023 · USD 10K · World Bank
  • 6.Creating Secondary Water Infrastructure for Construction of Tanks for Lift Schemes in APO Unit Kandaghat at different Gram Panchayats . · 05 Sept 2023 · USD 16K · World Bank
  • 6.Creating Secondary Water Infrastructure for Construction of Tanks for Gravity Schemes in different Gram Panchayats in APO Unit Kandaghat. · 05 Sept 2023 · USD 10K · World Bank
  • 4.Treatment of Drainage Line (Soil Conservation Works) by constructing Vegetative check, Dry stone, Create Wire check and CC check barriers in APO Unit Kandagaht. · 05 Sept 2023 · USD 9K · World Bank
  • 9 Renovation of Old Tanks under (Secondary Water Infrastructure) at different locations in different Gram Panchayats in APO Unit Ramshehar, Dharampur and Kandaghat. · 10 Feb 2023 · USD 9K · World Bank
  • 2 Construction of Primary Water Harvesting and Storage Structure in different Gram Panchayats in APO Unit Kandaghat · 10 Feb 2023 · USD 9K · World Bank
  • 12.Construction of Cement Concrete Check Barriers under Treatment of Drainage Line (Soil Conservation Works) · 22 Dec 2021 · USD 4K · World Bank

Method

Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.