Contractor intelligence · computed from public award records
AURECON AMEI LIMITED
- Awards won
- 20
- Known value
- USD 26.2M
- First award
- 15 Apr 2010
- Most recent
- 29 Nov 2019
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 20 | USD 26.2M | 29 Nov 2019 |
Where the work is
KE · 1ZM · 1
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Contract for the Engineering, Design and Supervision of Lusaka Transmission and Distribution Rehabilitation Project · 29 Nov 2019 · USD 3.9M · World Bank
- Consultancy services for Implementation Support Consultants (ISC) for Water Resources Planning and Management · 11 May 2017 · USD 5.6M · World Bank
- SAPP EAPP Study · 25 Apr 2017 · USD 829K · World Bank
- Phases 3:Preparation of Conceptual Designs, Support in Procurement of Civil Works Contract and Monitoring Supervision Services for the Construction of Four Lanes Arterial Road from S.D. Cooper Road · 31 Mar 2016 · USD 797K · World Bank
- Phases 1 and 2:Preparation of Conceptual Designs, Support in Procurement of Civil Works Contract and Monitoring Supervision Services for the Construction of Four Lanes Arterial Road · 31 Mar 2016 · USD 672K · World Bank
- Consultancy Services for Conceptual Design and Preparation of Works contracts for Ganta to Zwedru appropriately 225.4 km using output and Performance Based Road Contracts (OPRC) under Design, Build a · 26 Feb 2016 · USD 1.6M · World Bank
- Consulting Services for the overall Assessment and Optimization Study and Design of the Country's Hydro meteorological Network · 01 Dec 2015 · USD 1.1M · World Bank
- Consultancy Services for Engineering, Design and Construction Supervision of the Lusaka Transmission and Distribution Rehabilitation Project (Phase 1) · 20 Nov 2014 · USD 1.0M · World Bank
- Consultancy Services (Phase 2) for Engineering, Design and Construction Supervision of the Lusaka Transmission and Distribution Reha bilitation Project · 20 Nov 2014 · USD 4.1M · World Bank
- Consultancy Services for preparation of Detailed Stragic Implementation Plan for the National Transport Master Plan Including the Greater Kampala Metropolitan Area · 19 Sept 2014 · USD 635K · World Bank
- CONSULTANCY SERVICES FOR DEVELOPMENT OF CATCHMENT MANAGEMENT STRATEGY FOR SELECTED RIVER BASINS IN MALAWI · 30 May 2014 · USD 945K · World Bank
- Works Supervision for Rehabilitation of Uige, Malanje and N'dalatando Water Supply Systems · 11 Apr 2014 · USD 908K · World Bank
- Design Checking for Rehabilitation of Uige, Malanje and N'dalatando Water Supply Systems · 11 Apr 2014 · USD 123K · World Bank
- PREPARATION OF NATIONAL INTEGRATED CATCHMENT MANAGEMENT AND RURAL INFRASTRUCTURE DEVELOPMENT GUIDELINES · 06 Feb 2014 · USD 72K · World Bank
- PREPARATION OF NATIONAL INTEGRATED CATCHMENT MANAGEMENT AND RURAL INFRASTRUCTURE DEVELOPMENT GUIDELINES · 06 Feb 2014 · USD 826K · World Bank
- SIERRA LEONE RESOURCE PORT SITTING OPTION STUDY. · 16 Jul 2013 · USD 250K · World Bank
- TECHNICAL ADVISORY SERVICES FOR MORUPULE POWER PLANT CONSTRUCTION · 25 Apr 2013 · USD 1.1M · World Bank
- Electrical Distribution System in the City of Luanda · 23 May 2012 · USD 462K · World Bank
- Study on Regional Integration of Botswana’s Transport Sector · 08 Jul 2011 · USD 722K · World Bank
- Consulting Services for preparation of Strategic Transport Master Plan for Rwanda · 15 Apr 2010 · USD 588K · World Bank
Method
Computed from 20 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.