Skip to main content

Contractor intelligence · computed from public award records

CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG THỦY LỢI THỦY ĐIỆN THĂNG LONG

Awards won
10
Known value
USD 835K
First award
07 Jul 2017
Most recent
02 Jul 2021

Wins by funder

FunderAwardsKnown valueMost recent
World Bank10USD 835K02 Jul 2021

Where the work is

VN · 10

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Gói thầu số C1-QB-GD1-CS5: Tư vấn lập Thiết kế BVTC – Dự toán thay mới cửa van tràn chính, Tiểu dự án Sửa chữa, nâng cấp bảo đảm an toàn hồ chứa nước Phú Vinh, Dự án WB8 tỉnh Quảng Bình · 02 Jul 2021 · USD 11K · World Bank
  • Consultants on survey, detailed design and cost estimate for 12 reservoirs · 05 Mar 2021 · USD 91K · World Bank
  • Consultancy of Survey, construction drawing design and cost estimates (Tu van khao s?t, lap thiet ke BVTC v? du toan) · 08 Feb 2021 · USD 73K · World Bank
  • Tư vấn khảo sát, lập thiết kế bản vẽ thi công – dự toán xây dựng (C1-NB-CS3) · 03 Oct 2020 · USD 108K · World Bank
  • Consultant for survey and construction drawing design - total cost estimate/T? v?n kh?o s?t thi?t k? b?n v? thi c?ng - t?ng d? to?n · 10 Jun 2020 · USD 44K · World Bank
  • Consultant for construction drawing design - total cost and survey plan of termite handling · 26 Sept 2019 · USD 92K · World Bank
  • Consultant to survey, prepare construction drawing design and cost estimates · 17 Jan 2019 · USD 101K · World Bank
  • Gói thầu C1-YB-CS5: Tư vấn khảo sát, lập hồ sơ thiết kế bản vẽ thi công và dự toán 16 hồ chứa (gồm: Hồ Tự Do, hồ Chóp Dù, hồ Gốc Nhội, hồ Khe Hoài, hồ Hang Luồn, hồ Nông trường Nghĩa Lộ, hồ thôn 26-3, · 15 Nov 2018 · USD 77K · World Bank
  • Feasibility study and dam safety reports preparing consultant · 04 May 2018 · USD 108K · World Bank
  • Consultancy service for preparation of feasibility study and dam safety report · 07 Jul 2017 · USD 132K · World Bank

Method

Computed from 10 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.