Contractor intelligence · computed from public award records
CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG THỦY LỢI THỦY ĐIỆN THĂNG LONG
- Awards won
- 10
- Known value
- USD 835K
- First award
- 07 Jul 2017
- Most recent
- 02 Jul 2021
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 10 | USD 835K | 02 Jul 2021 |
Where the work is
VN · 10
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- CÔNG TY TNHH TƯ VẤN TRƯỜNG ĐẠI HỌC THỦY LỢI · 2 shared contracts
- CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG BẮC THÀNH · 2 shared contracts
- CÔNG TY CỔ PHẦN PHÒNG TRỪ MỐI VIỆT NAM · 2 shared contracts
- CTCP TU VAN XAY DUNG THUY LOI 3 · 1 shared contract
- CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ QUẢNG NGÃI · 1 shared contract
- CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ THỦY LỢI - THỦY ĐIỆN YÊN BÁI · 1 shared contract
- CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNGTHỦY LỢI NGHỆ AN · 1 shared contract
- CÔNG TY CỔ PHẦN XÂY DỰNG VÀ SINH THÁI THỦY LỢI · 1 shared contract
- CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG HẠ TẦNG HUY HOÀNG · 1 shared contract
- CÔNG TY CỔ PHẦN TƯ VẤN KỸ THUẬT VÀ ĐẦU TƯ XÂY DỰNG ACOCI · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Gói thầu số C1-QB-GD1-CS5: Tư vấn lập Thiết kế BVTC – Dự toán thay mới cửa van tràn chính, Tiểu dự án Sửa chữa, nâng cấp bảo đảm an toàn hồ chứa nước Phú Vinh, Dự án WB8 tỉnh Quảng Bình · 02 Jul 2021 · USD 11K · World Bank
- Consultants on survey, detailed design and cost estimate for 12 reservoirs · 05 Mar 2021 · USD 91K · World Bank
- Consultancy of Survey, construction drawing design and cost estimates (Tu van khao s?t, lap thiet ke BVTC v? du toan) · 08 Feb 2021 · USD 73K · World Bank
- Tư vấn khảo sát, lập thiết kế bản vẽ thi công – dự toán xây dựng (C1-NB-CS3) · 03 Oct 2020 · USD 108K · World Bank
- Consultant for survey and construction drawing design - total cost estimate/T? v?n kh?o s?t thi?t k? b?n v? thi c?ng - t?ng d? to?n · 10 Jun 2020 · USD 44K · World Bank
- Consultant for construction drawing design - total cost and survey plan of termite handling · 26 Sept 2019 · USD 92K · World Bank
- Consultant to survey, prepare construction drawing design and cost estimates · 17 Jan 2019 · USD 101K · World Bank
- Gói thầu C1-YB-CS5: Tư vấn khảo sát, lập hồ sơ thiết kế bản vẽ thi công và dự toán 16 hồ chứa (gồm: Hồ Tự Do, hồ Chóp Dù, hồ Gốc Nhội, hồ Khe Hoài, hồ Hang Luồn, hồ Nông trường Nghĩa Lộ, hồ thôn 26-3, · 15 Nov 2018 · USD 77K · World Bank
- Feasibility study and dam safety reports preparing consultant · 04 May 2018 · USD 108K · World Bank
- Consultancy service for preparation of feasibility study and dam safety report · 07 Jul 2017 · USD 132K · World Bank
Method
Computed from 10 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.