Skip to main content

Contractor intelligence · computed from public award records

COLENCO CONSULTING LTD

Awards won
16
Known value
USD 10.8M
First award
28 Jan 2020
Most recent
17 Aug 2026

Wins by funder

FunderAwardsKnown valueMost recent
World Bank16USD 10.8M17 Aug 2026

Where the work is

AO · 3KE · 2MW · 2NG · 2BJ · 1GA · 1NE · 1SN · 1TN · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Recrutement d’un consultant firme pour la réalisation d’une étude APS, APD et CCTP pour la construction du poste 225/90/33 kV d’Abengourou et des lignes de raccordement · 17 Aug 2026 · USD 168K · World Bank
  • Études pour la construction d’une centrale solaire photovoltaïque de puissance 70 MWC avec stockage de 30 MWh sur le site de KANDADJI · 22 Apr 2026 · USD 204K · World Bank
  • Owner's Engineer for review and approval of EPC's design and supervision of works for distribution networks rehabilitation and expansion - Package B (Benguela and Luanda 2 Cities), ENDE, Angola · 25 Feb 2026 · USD 838K · World Bank
  • Etudes APS/APD pour les travaux d'extension de réseaux de distribution d'électricité, Z2 dans les provinces du Moyen Ogooué et de la Ngounié. · 13 Feb 2026 · USD 158K · World Bank
  • RECRUTEMENT D’UN CONSULTANT FIRME EN VUE DE LA RÉALISATION D’UNE ÉTUDE APS ET APD POUR L’EXTENSION ET LE RENFORCEMENT DES RÉSEAUX HTA DANS 114 CHEFS-LIEUX DE DÉPARTEMENTS ET DE SOUS-PRÉFECTU · 09 Jan 2026 · USD 147K · World Bank
  • Procurement of consultancy services- supervision and management of works contract for stand- alone photovoltaic systems for community facilities (Component 3A). · 23 Dec 2025 · USD 397K · World Bank
  • Contrôle , Suivi Supervision des Travaux de Construction, de Densification de Réseaux dans 436 localités des Départements de l’Atlantique, du Littoral, de l'Atlantique, de l'Ouémé et du Plateau · 28 Oct 2025 · USD 2.9M · World Bank
  • Consulting Services to Prepare the Feasibility Study of the Cunene Transmission System (CTS), RNT · 05 Feb 2025 · USD 485K · World Bank
  • Selection of Consulting Firm (Owner's Engineer), Design, Prepare Bidding Documents to Contract the EPC for the Construction of the National Control Centre (NCC), RNT · 25 Jan 2025 · USD 511K · World Bank
  • Consultancy Services for the Supervision of the Supply, Installation, and Commissioning of Smart Meters for the Eleven (11) Distribution Companies: DREP:CS1 · 23 Sept 2024 · USD 449K · World Bank
  • Engineering Consultancy Services for the Survey and Designs for Transmission and Distribution works and support during procurement (Phase 1) · 16 May 2023 · USD 331K · World Bank
  • Engineering Consultancy Services for the Construction Supervision and Management of DLP for Transmission and Distribution works (Phase 2) · 16 May 2023 · USD 1.2M · World Bank
  • Consulting Services: Technical Assistance for Engineering Supervision and Site Management of Reconductoring of NTP-TR5E and NTP-TR5G Transmission Lines · 13 Sept 2021 · USD 1.4M · World Bank
  • Terrestrial Feasibility Studies for Italy-Tunisia Interconnector · 02 Sept 2021 · USD 423K · World Bank
  • PROCUREMENT OF CONSULTANCY SERVICES FOR PROJECT SUPERVISION AND MANAGEMENT OF WORKS–LAST MILE CONNECTIVITY PROJECT UNDER -KENYA EL Contract No. KE-KPLC-204027-CS-CDS · 10 Jun 2021 · USD 689K · World Bank
  • BUREAUX CONSULTANTS POUR CONTROLE ET SUIVI TRAVAUX REMISE EN ETAT DE MODERNISATION RESEAUX DE DISTRIBUTION SENELEC-PASE: • Activité 1 : ZONE DAKAR & ENVIRONS •Activité 2 : ZONE SUD (Kédoug, Zig, · 28 Jan 2020 · USD 462K · World Bank

Method

Computed from 16 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.