ELECTRICITE DE FRANCE (EDF)
- Awards won
- 14
- Known value
- USD 13.0M
- First award
- 30 May 2002
- Most recent
- 01 Aug 2017
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 14 | USD 13.0M | 01 Aug 2017 |
Where the work is
MZ · 1
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Review of the existing NCC Feasibility Study prepared by EDF in 2013, including comments made by other experts and establish an integrated strategy and roadmap for the Development of a NCC for EDM. · 01 Aug 2017 · USD 235K · World Bank
- ADDENDUM #1. ASSISTANCE TO ESTABLISH INGA3 MANAGEMENT UNIT (ASSISTANCE POUR LA MISE EN PLACE DE LA CELLULE DE GESTION D'INGA 3 [CGI3 ]) · 07 Jul 2014 · USD 1.8M · World Bank
- ASSISTANCE TO ESTABLISH INGA3 MANAGEMENT UNIT (ASSISTANCE POUR LA MISE EN PLACE DE LA CELLULE DE GESTION D'INGA 3 [CGI3]) · 09 Aug 2013 · USD 571K · World Bank
- Grid impact analysis and assessment for increased penetration of renewable energy into jamaican electricity grid · 05 Apr 2013 · USD 183K · World Bank
- SUPERVISION ET CONTROLE DES TRAVAUX DE CONSTRUCTION DES LIGNES 161 KV ONIGBOLO-PARAKOU ET SAKETE-PORTO-NOVO · 27 Dec 2012 · USD 1.1M · World Bank
- FEASIBILITY STUDY, DESIGN REVIEW, UPDATING OF DETAILED DESIGN, PREPARATION OF BID DOC AND PRE-AWARD SERVICES FOR STRECHES OF ROAD 161 KV ONIGBOLO-PARAKOU AND SAKETE-PORTO NOVO · 20 Jun 2008 · USD 1.2M · World Bank
- SUPERVISION OF WORKS REINFORCEMENT OF 132 KV LINES KOMPIENGA-BAGRE-OUAGADOUGOU (RENFORCEMENT DES PYLONES DES LIGNES 132 KV KOMPIENGA-BAGRE-OUGADOUGOU AOI 8 SUPERVISION DES TRAVAUX) · 04 Jun 2008 · USD 727K · World Bank
- SUPERVISION AND BIDDING DOCUMENTS PREPARATION (L'ELABORATION DES SPECIFICATIONS TECHNIQUES, LA PREPARATION DES DAO ET LA SUPERVISION DES TRAVAUX DE MODERNISATION ET D'EXTENSION DU DISPATCHING DE CEB · 31 Jan 2008 · USD 1.6M · World Bank
- CONSTRUCTION SUPERVISION INCLUDING PREPARATION OF BIDDING DOCUMENTS, EVALUATION REPORTS,ETC. · 28 Nov 2006 · USD 2.2M · World Bank
- UPDATING OF THE FEASIBILITY STUDY OF THE FIRST PHASE OF DNISTER HYDROPOWER PUMPED-STORAGE PROJECT · 20 Nov 2006 · USD 298K · World Bank
- CONSULTANT'S SERVICE FOR 220KV GIS HIEP BINH PHUOC & BINH TAN PROJECTS · 31 Aug 2006 · USD 151K · World Bank
- ETUDE D'AVANT PROJET DETAILLE DU BARRAGE DE BOUSSIABA ET DU TRANSFERT DES EAUX VERS LE BARRAGE DE BENI HAROUN · 29 Oct 2002 · USD 820K · World Bank
- CONSULTING SERVICES FOR ELECTRICAL AND MECHANICAL EQUIPMENT · 10 Jul 2002 · USD 1.1M · World Bank
- CONSULTING SERVICES FOR ELECTRICAL AND MECHANICAL EQUIPMENT · 30 May 2002 · USD 1.1M · World Bank
Method
Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.