Skip to main content

Contractor intelligence · computed from public award records

ELECTRICITE DE FRANCE (EDF)

Awards won
14
Known value
USD 13.0M
First award
30 May 2002
Most recent
01 Aug 2017

Wins by funder

FunderAwardsKnown valueMost recent
World Bank14USD 13.0M01 Aug 2017

Where the work is

MZ · 1

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Review of the existing NCC Feasibility Study prepared by EDF in 2013, including comments made by other experts and establish an integrated strategy and roadmap for the Development of a NCC for EDM. · 01 Aug 2017 · USD 235K · World Bank
  • ADDENDUM #1. ASSISTANCE TO ESTABLISH INGA3 MANAGEMENT UNIT (ASSISTANCE POUR LA MISE EN PLACE DE LA CELLULE DE GESTION D'INGA 3 [CGI3 ]) · 07 Jul 2014 · USD 1.8M · World Bank
  • ASSISTANCE TO ESTABLISH INGA3 MANAGEMENT UNIT (ASSISTANCE POUR LA MISE EN PLACE DE LA CELLULE DE GESTION D'INGA 3 [CGI3]) · 09 Aug 2013 · USD 571K · World Bank
  • Grid impact analysis and assessment for increased penetration of renewable energy into jamaican electricity grid · 05 Apr 2013 · USD 183K · World Bank
  • SUPERVISION ET CONTROLE DES TRAVAUX DE CONSTRUCTION DES LIGNES 161 KV ONIGBOLO-PARAKOU ET SAKETE-PORTO-NOVO · 27 Dec 2012 · USD 1.1M · World Bank
  • FEASIBILITY STUDY, DESIGN REVIEW, UPDATING OF DETAILED DESIGN, PREPARATION OF BID DOC AND PRE-AWARD SERVICES FOR STRECHES OF ROAD 161 KV ONIGBOLO-PARAKOU AND SAKETE-PORTO NOVO · 20 Jun 2008 · USD 1.2M · World Bank
  • SUPERVISION OF WORKS REINFORCEMENT OF 132 KV LINES KOMPIENGA-BAGRE-OUAGADOUGOU (RENFORCEMENT DES PYLONES DES LIGNES 132 KV KOMPIENGA-BAGRE-OUGADOUGOU AOI 8 SUPERVISION DES TRAVAUX) · 04 Jun 2008 · USD 727K · World Bank
  • SUPERVISION AND BIDDING DOCUMENTS PREPARATION (L'ELABORATION DES SPECIFICATIONS TECHNIQUES, LA PREPARATION DES DAO ET LA SUPERVISION DES TRAVAUX DE MODERNISATION ET D'EXTENSION DU DISPATCHING DE CEB · 31 Jan 2008 · USD 1.6M · World Bank
  • CONSTRUCTION SUPERVISION INCLUDING PREPARATION OF BIDDING DOCUMENTS, EVALUATION REPORTS,ETC. · 28 Nov 2006 · USD 2.2M · World Bank
  • UPDATING OF THE FEASIBILITY STUDY OF THE FIRST PHASE OF DNISTER HYDROPOWER PUMPED-STORAGE PROJECT · 20 Nov 2006 · USD 298K · World Bank
  • CONSULTANT'S SERVICE FOR 220KV GIS HIEP BINH PHUOC & BINH TAN PROJECTS · 31 Aug 2006 · USD 151K · World Bank
  • ETUDE D'AVANT PROJET DETAILLE DU BARRAGE DE BOUSSIABA ET DU TRANSFERT DES EAUX VERS LE BARRAGE DE BENI HAROUN · 29 Oct 2002 · USD 820K · World Bank
  • CONSULTING SERVICES FOR ELECTRICAL AND MECHANICAL EQUIPMENT · 10 Jul 2002 · USD 1.1M · World Bank
  • CONSULTING SERVICES FOR ELECTRICAL AND MECHANICAL EQUIPMENT · 30 May 2002 · USD 1.1M · World Bank

Method

Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.