EMBELLISSEMENT PLAN CONSTRUCTION (EPC)

Awards won
13
Known value
USD 7.8M
First award
24 Aug 2009
Most recent
20 Jun 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank13USD 7.8M20 Jun 2025

Where the work is

HT · 6

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • RECONSTRUCTION ET PROTECTION D’OUVRAGES DANS LE NORD EN DEUX (2) LOTS LOT 1 - TRAVAUX DE PROTECTION DU PONT TI COULINE (RN6) SUR LA ROUTE RELIANT LE PARC INDUSTRIEL DE CARACOL (PIC) A CARREFOUR JESUS · 20 Jun 2025 · USD 981K · World Bank
  • ADAPTATION CLIMATIQUE DE ROUTES RURALES DANS LE SUD ET LES NIPPES EN SIX (6) LOTS LOT 6 : AMÉLIORATION DU TRONÇON CHATEAU/CARPENTIER · 12 Jun 2025 · USD 3.0M · World Bank
  • AMÉLIORATION DE L’AXE ROUTIER BLAUKHAUSS-BAINET-COTES DE FER-LOSANDIEU (EN SEPT LOTS) LOT 3 : TRONÇON DE ROUTE SAUREL-GRISGRIS · 11 May 2023 · USD 864K · World Bank
  • TRAITEMENT DE POINTS CRITIQUES SUR LE TRONÇON PETIT TROU DE NIPPES-BARADÈRES LOT 1 : PETIT TROU DE NIPPES – PASSE BARADÈRES · 04 May 2021 · USD 1.2M · World Bank
  • CONSTRUCTION D’UN DALOT 3(3*3.5) SUR LA ROUTE DE KASWI ET AMENAGEMENT DE L’INTERSECTION DE CETTE ROUTE AVEC LA RN 2 · 02 Dec 2019 · USD 204K · World Bank
  • PROTECTION DU VILLAGE ET CURAGE DE LA RAVINE BOISROND ENTRE LA COMMUNE DE SAINT-LOUIS DU SUD ET CELLE D’AQUIN · 22 Nov 2019 · USD 244K · World Bank
  • Road rehabilitation works. Zanglais/ St. Louis South Aquinas (PPM # 23/PROPREV) · 25 Jan 2011 · USD 215K · World Bank
  • protection works Ravine Bridge south, RN2 Torbeck. (PPM # 9/PROPREV) · 25 Jan 2011 · USD 449K · World Bank
  • protection works on the bridge Boumier RN2 (Port-au-Prince/Cayes) · 08 Oct 2010 · USD 25K · World Bank
  • protection works on the bridge Cavaillon RN2 (Port-au-Prince/Cayes) · 08 Oct 2010 · USD 37K · World Bank
  • Bridge protection wors, bridge de Cavaillon (RN2) · 28 Dec 2009 · USD 339K · World Bank
  • Civil works including concreting, backfilling, gabion revetment and masonry and demolition of existing gabion · 24 Aug 2009 · USD 74K · World Bank
  • Protection works around Boumier bridge (RN2) · 24 Aug 2009 · USD 74K · World Bank

Method

Computed from 13 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.