Contractor intelligence · computed from public award records
GIC
- Awards won
- 9
- Known value
- USD 6.3M
- First award
- 11 Apr 2005
- Most recent
- 28 Nov 2025
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 9 | USD 6.3M | 28 Nov 2025 |
Where the work is
SN · 5ML · 1NE · 1TG · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- I.C.A SARL · 2 shared contracts
- AIC · 1 shared contract
- GECI EXPERT CONSEIL · 1 shared contract
- MODULOR · 1 shared contract
- DIC-BTP · 1 shared contract
- AGECET BTP · 1 shared contract
- AGECET · 1 shared contract
- SETRAC · 1 shared contract
- INGENIEURS CONSULTANTS ASSOCIES (ICA) · 1 shared contract
- TECHNOLOGIES PROPRES OT · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Suivi et contrôle des travaux d’aménagements de 64.627 KM de routes rurales dans les régions de Niamey, Tahoua et Zinder, dans le cadre de la deuxième phase du PMRC · 28 Nov 2025 · USD 180K · World Bank
- Sélection d’un consultant pour la formation en résilience climatique pour le personnel de l’UGP et des partenaires institutionnels dans le cadre du PCZA · 09 Jan 2025 · USD 20K · World Bank
- Sélection de consultants pour la réalisation des études techniques APS, socio-économiques et élaboration du DAO du tronçon « Tambacounda-Dianké Makha (123 km) » · 27 Dec 2023 · USD 111K · World Bank
- REALISATION DES ETUDES TECHNIQUES APS, SOCIO-ECONOMIQUES ET ELABORATION DU DAO DU TRONÇON « KOUMPENTOUM – MERETO – MAKA COLIBANTANG – KOUSSANAR ET KOUMPENTOUM – PAYAR (144 KM) Y COMPRIS 70 KM · 27 Dec 2023 · USD 208K · World Bank
- SELECTION D’UN CONSULTANT POUR LE CONTRÔLE ET LA SUPERVISION DES TRAVAUX D’AMENAGEMENT ET DE BITUMAGE DE ROUTES DANS LE CADRE DU PCZA (MISSION 4) · 30 May 2023 · USD 3.1M · World Bank
- SELECTION D’UN CONSULTANT POUR LE CONTRÔLE ET LA SUPERVISION DES TRAVAUX D’AMENAGEMENT ET DE BITUMAGE DE ROUTES DANS LE CADRE DU PCZA (MISSION 1) · 30 May 2023 · USD 1.5M · World Bank
- Etudes d’adaptation des plans architecturaux, Suivi et Contrôle des travaux de construction des aménagements connexes dans la région de Koulikoro pour la Phase II du PAAR. · 03 Jan 2020 · USD 26K · World Bank
- RECRUTEMENT D’UN CONSULTANT(CABINET) POUR LA SURVEILLANCE ET LE CONTRÔLE DES TRAVAUX D’AMÉNAGEMENT, D’ASSAINISSEMENT, DE BITUMAGE DE LA RUE SOS VILLAGE D’ENFANT – COLLEGE CHAMINADE DE LA VI · 08 Oct 2019 · USD 165K · World Bank
- CONTROL AND SUPERVISION OF REHABILITATION WORKS OF 202,72 KM OF DIRT ROAD: LOT 1 ZONE DU CENTRE · 11 Apr 2005 · USD 989K · World Bank
Method
Computed from 9 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.