Skip to main content

Contractor intelligence · computed from public award records

GAUFF GMBH & CO. ENGINEERING KG

Awards won
18
Known value
USD 19.5M
First award
10 Dec 2015
Most recent
01 Apr 2026

Wins by funder

FunderAwardsKnown valueMost recent
World Bank18USD 19.5M01 Apr 2026

Where the work is

MZ · 9AL · 3TO · 2AO · 1XK · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Preliminary Environmental Impact Assessment (EIA) for Mursi Irrigation Schemes · 01 Apr 2026 · USD 3K · World Bank
  • CSP Construction Supervision · 01 Apr 2025 · USD 1,000K · World Bank
  • Design review; engineering, construction supervision and quality control for Divjaka and Mursi irrigation schemes (two sites) · 15 Nov 2024 · USD 142K · World Bank
  • Supervision of Rehabilitation and Construction of Distribution Centers in Beira · 26 Mar 2021 · USD 543K · World Bank
  • Design of Rehabilitation and Construction of Distribution Centers in Beira · 26 Mar 2021 · USD 268K · World Bank
  • Feasibility Study, Detailed Design & ESMPs for Janjari system, including Janjari' canal, irrigation scheme of Konispol, and Janjari & Mursi dams and Supervisory Services for rehabilitation works · 05 Mar 2019 · USD 159K · World Bank
  • Consultancy Services for Design and Implementation Supervision · 21 Dec 2018 · USD 601K · World Bank
  • Construction Supervision (Approximately between 100 and 110 Kms) Services of Tongatapu and Outer Island Roads Works in Tonga. · 13 Dec 2018 · USD 1.7M · World Bank
  • Updating of Technical Specifications , Feasibility Study, Detail Engineering Design (Approximately 155 Kms) and Procurement of Tongatapu and Outer Island Roads Works in Tonga · 13 Dec 2018 · USD 1.0M · World Bank
  • Supervision for Refurbishment of Existing Treatment system, including Pre-treatment Canal and Rehabilitation of the Dingue-Dingue Water Intake in Beira · 07 Jun 2018 · USD 874K · World Bank
  • Design for Refurbishment of Existing Treatment system, including Pre-treatment Canal and Rehabilitation of the Dingue-Dingue Water Intake in Beira · 07 Jun 2018 · USD 409K · World Bank
  • Design checking and works Supervision of Network and Home Connections for Namibe · 21 May 2018 · USD 2.2M · World Bank
  • Supervision of Electromechanical Equipment of Boreholes, Transmission Main, Rehabilitation and Construction of Water Treatment Plant and Pumping Stations, Pemba · 13 Mar 2018 · USD 1.2M · World Bank
  • Design of Electromechanical Equipment of Boreholes, Transmission Main, Rehabilitation and Construction of Water Treatment Plant and Pumping Stations, Pemba · 13 Mar 2018 · USD 315K · World Bank
  • SUPERVISION OF REHABILITATION AND CONSTRUCTION OF TRANSMISSION MAINS, PEMBA · 31 Oct 2017 · USD 505K · World Bank
  • DESIGN CHECK OF REHABILITATION AND CONSTRUCTION OF TRANSMISSION MAINS, PEMBA · 31 Oct 2017 · USD 161K · World Bank
  • Consultancy Services for the Detailed Design and Supervision of Emergency Works and the Detailed Design of Phase II of the Rehabilitation of the Mocuba Water Supply System." · 08 Sept 2017 · USD 1.2M · World Bank
  • TECHNICAL ASSISTANCE TO OMVG ENERGY PROJECT (ASSISTANCE TECHNIQUE A MAITRE D'OUVRAGE A L'OMVG POUR LA REALISATION DE SON PROJET ENER GY). · 10 Dec 2015 · USD 7.3M · World Bank

Method

Computed from 18 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.