Skip to main content

Contractor intelligence · computed from public award records

GKW CONSULT GMBH

Awards won
19
Known value
USD 9.4M
First award
09 Jan 2001
Most recent
17 Jul 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank19USD 9.4M17 Jul 2025

Where the work is

TR · 4PE · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Elaboración de un Plan Estratégico Nacional para el Tratamiento y Reúso de Aguas Residuales con Enfoque de Economía Circular · 17 Jul 2025 · USD 508K · World Bank
  • Consultancy Services for Design Review and Preparation of Bidding Documents for Konya (KOSKİ) Sub-Projects (KONYA C1-A) · 10 Aug 2021 · USD 55K · World Bank
  • Consultancy Services for Construction Supervision for Konya (KOSKİ) Sub-Projects (KONYA C1-B) · 10 Aug 2021 · USD 456K · World Bank
  • Consultancy Services for Preparation of Integrated Urban Water Management Plan for Selected Cities (Reference No: IB A1.C2) - Group 1- MARDİN · 21 Sept 2020 · USD 1.5M · World Bank
  • Consultancy Services for Preparation of Integrated Urban Water Management Plan for Selected Cities (Reference No: IB A1.C2) - Group 1- MUĞLA · 21 Sept 2020 · USD 1.5M · World Bank
  • ENGINEERING CONSULTING SERVICES FOR FEASIBILITY STUDY AND DETAILED DESIGN FOR OTA WATER SUPPLY SYSTEMS-LOT III · 03 Aug 2005 · USD 674K · World Bank
  • ENGINEERING CONSULTING SERVICES FOR REHABILITATION AND EXPANSION OF ABEOKUTA, IJEBU-IGBO (APOJE), IFO-AKINSIDE (PAPA), AND OGERE · 03 Aug 2005 · USD 524K · World Bank
  • WATER DISTRIBUTION NETWORK MASTER PLAN STUDY (ETUDE DU PLAN DIRECTEUR DE DEVELOPMENT DU RÉSEAU DE DISTRIBUTION D'EAU DE NOUAKCHOTT · 25 Jul 2005 · USD 324K · World Bank
  • FEASIBILITY STUDY AND SUPERVISION WORKS · 26 May 2005 · USD 167K · World Bank
  • PREPARATION OF FEASIBILITY STUDY AND DETAILED ENGINEERING DESIGN · 24 Mar 2005 · USD 237K · World Bank
  • CONSULTANCY SERVICES FOR TECHNICAL STUDIES IN THE AREAS OF LOUIS, KAOLACK AND LOUGA · 30 Jul 2004 · USD 222K · World Bank
  • CONSULTANCY SERVICES CONTRACT FOR THE STUDY AND SUPERVISION OF WORKS IN NGAGARA · 12 May 2004 · USD 328K · World Bank
  • CONSULTING SERVICES FOR INSTITUTIONAL STRENGTHENING AND ENV. REMEDIATION PLAN OF DURRES · 15 Aug 2003 · USD 246K · World Bank
  • TECHNICAL STUDIES OF SURVEILLANCE WORKS · 11 Feb 2003 · USD 879K · World Bank
  • CONTROL AND SUPERVISION OF EXTENSION WORKS IN 43 SECONDARY CENTERS · 11 Feb 2003 · USD 1.1M · World Bank
  • REHABILITATION OF THE WATER SUPPLY SYSTEM IN NOUAKCHOTT · 16 Nov 2001 · USD 206K · World Bank
  • FEASIBILITY STUDY AND SUPERVISION WORKS · 30 Jan 2001 · USD 244K · World Bank
  • TECHNICAL STUDIES FOR REINFORCEMENT OF DRINKING WATER INSTALLATION IN MARADI & DIFFA · 09 Jan 2001 · USD 63K · World Bank
  • TECHNICAL STUDIES FOR REINFORCEMENT OF DRINKING WATER INSTALLATION IN SECONDARY CITIES · 09 Jan 2001 · USD 195K · World Bank

Method

Computed from 19 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.