Contractor intelligence · computed from public award records
GOPA - International Energy Consultants GmbH
- Awards won
- 27
- Known value
- USD 61.6M
- First award
- 12 Nov 2010
- Most recent
- 24 Feb 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 27 | USD 61.6M | 24 Feb 2026 |
Where the work is
UG · 4NG · 2TZ · 2BI · 1CG · 1MD · 1PK · 1RW · 1SL · 1TJ · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- EUROMOC,LDA · 1 shared contract
- ENERGOPROJEKT HIDROINŽENJERING A.D. BEOGRAD · 1 shared contract
- ZOLLET INGEGNERIA SRL · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Recrutement d'un consultant (Firme) International chargé de la réalisation des études relatives à la ligne d'interconnexion 110kV et 220 kV · 24 Feb 2026 · USD 361K · World Bank
- Ingénieur-conseil chargé du contrôle et de la surveillance des travaux des travaux d'électrification des ouvrages de proximité · 31 Mar 2025 · USD 824K · World Bank
- Recrutement d'un cabinet pour la réalisation de l'étude de le stabilité statique et dynamique du réseau de transport interconnecté CONGO-RDC · 19 Feb 2025 · USD 300K · World Bank
- Consultancy Services for Project Supervision and Management. LUM SUMP ET TIME BASED · 07 May 2024 · USD 2.3M · World Bank
- Consultant service to carry out a feasibility study of pump storage at Ntaruka HPP and comparison with other alternative options · 20 Jan 2024 · USD 212K · World Bank
- Consulting Services for Improvement of Electricity Supply in Urban Areas · 20 Apr 2022 · USD 1.3M · World Bank
- Consultant chargé du contrôle des activités des opérateurs réseaux et des distributeurs de lampes et kits solaires dans le cadre de la mise en œuvre du fonds d’électrification du projet EASE · 23 Aug 2021 · USD 298K · World Bank
- Owners’ Engineer for Construction Supervision and Technical Assistance during the Defects Liability Period for the 143Km, 400kV Transmission Line including OPGW from Matambo (Mozambique) to the borde · 15 Jul 2021 · USD 5.8M · World Bank
- RFB no. 6380-A12 Consultancy Services for providing support in Bids Evaluation under the procurement package RFB no.6380/6381-A1 for Construction of a new 400kV Vulcanesti-Chisinau OHTL · 23 Mar 2021 · USD 43K · World Bank
- Réalisation des investigations géotechniques sur le tracé de la ligne 225 kV du Projet d’Interconnexion Electrique Guinée-Mali (PIEGM) – Partie Malienne · 06 Apr 2020 · USD 84K · World Bank
- Technical Assistance for Engineering Supervision and Site Management for Reinforcement & Rehabilitation of 330/132kV and 132/33kV Transmission Substations (Package 1) -NTP-TC1 · 28 Feb 2020 · USD 2.8M · World Bank
- Consulting Services: Technical Assistance for Engineering Supervision and Site Management of Supply and Installation of 330/132kV & 132/33kV Transmission Substations (Package 2) · 28 Feb 2020 · USD 2.9M · World Bank
- Owners Engineer - Phase 2 & 3 · 06 May 2019 · USD 21.6M · World Bank
- Owners Engineer - Phase 1 · 06 May 2019 · USD 753K · World Bank
- ETUDES DE FAISABILITE DE PARCS SOLAIRES AU BURKINA FASO ET AU MALI · 06 Mar 2019 · USD 1.5M · World Bank
- Design and Supervision of Dasu Transmission Line Project. · 14 Feb 2019 · USD 7.4M · World Bank
- Consulting Services for the Tender Agent for Procurement of Construction Contractors for Construction of the Regional Interconnector · 27 Nov 2018 · USD 476K · World Bank
- CONTRACT FOR CONSULTANT'S SERVICES FOR UTILITY-SCALE GRID-CONNECTED SOLAR POWER PLANT- FEASIBILITY STUDY AND PRE-FEASIBILITY STUDIES · 16 Mar 2015 · USD 1.4M · World Bank
- Etude de la demande et elaboration d'un plan directeur de developpement de la production et du Transport de l'energie electrique · 06 Jul 2011 · USD 634K · World Bank
- SERVICES DE CONSULTANT POUR LES ETUDES DE PREPARATION DE LA MISE EN OEUVRE DE LA COMPOSANTE "EFFICACITE ENERGETIQUE ET GESTION DE LA DEMANDE" · 12 Nov 2010 · USD 131K · World Bank
Method
Computed from 27 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.