HGSN LLC
- Awards won
- 13
- Known value
- USD 542K
- First award
- 28 Feb 2008
- Most recent
- 21 Oct 2019
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 13 | USD 542K | 21 Oct 2019 |
Where the work is
AM · 3
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Author’s Supervision of Additional Works for Kaghtsrashen Gravity Irrigation Scheme and Geghardalich Gravity Irrigation Scheme · 21 Oct 2019 · USD 4K · World Bank
- Revision of the Baghramyan-Norakert On-farm Irrigation Network Design and Preparation of Design for additional works on Kaghtsrashen GIS and Design of Incomplete Geghardalich GIS · 03 Jun 2019 · USD 15K · World Bank
- The objective of the assignment is to prepare detailed designs for additional 28.5 hectares of the on-farm irrigation network under command of Bagramyan-Norakert gravity irrigation scheme. · 21 Dec 2018 · USD 8K · World Bank
- Development of Architectural Designs and Technical Specifications for Rehabilitation of 6 High Schools · 05 May 2016 · USD 193K · World Bank
- Design and (follow-on) supervision of additional works for improvement of GTC · 16 Mar 2016 · USD 13K · World Bank
- Design and Author’s Supervision of Diversion Canals of Achajur, Noyemberyan 4-stage, Zeytun-Haghtanak, Metsamor (Tandzut Ghamlu) and Ghara-Ghala Pumps Stations · 05 May 2014 · USD 109K · World Bank
- Carry out Author’s Supervision (designer’s supervision) during construction (Phase III). · 05 May 2014 · USD 24K · World Bank
- The selected consulting firm shall (i) carry out feasibility study, (Phase I); (ii) prepare Detailed Design Packages, including (EIA), EMP and RAP. · 05 May 2014 · USD 105K · World Bank
- Design Author’s Supervision over Construction of Meghri Gravity Scheme · 04 Mar 2014 · USD 39K · World Bank
- GYUMRI TECHNOLOGY CENTER REFURBISHMENT FOLLOW ON SUPERVISION AND TECHNICAL SUPERVISION · 20 Jun 2012 · USD 23K · World Bank
- Design of additional repairs for the Republican Veterinary Diagnostic and Anti-Epidemic Center · 21 May 2010 · USD 2K · World Bank
- Supervision works Renovation of Veterinary centerhe · 19 May 2009 · USD 7K · World Bank
- Construction of Agarak Veterinary and Plant Quarantine Border Post Building of the RA MOA · 28 Feb 2008 · USD 1K · World Bank
Method
Computed from 13 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.