HGSN LLC

Awards won
13
Known value
USD 542K
First award
28 Feb 2008
Most recent
21 Oct 2019

Wins by funder

FunderAwardsKnown valueMost recent
World Bank13USD 542K21 Oct 2019

Where the work is

AM · 3

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Author’s Supervision of Additional Works for Kaghtsrashen Gravity Irrigation Scheme and Geghardalich Gravity Irrigation Scheme · 21 Oct 2019 · USD 4K · World Bank
  • Revision of the Baghramyan-Norakert On-farm Irrigation Network Design and Preparation of Design for additional works on Kaghtsrashen GIS and Design of Incomplete Geghardalich GIS · 03 Jun 2019 · USD 15K · World Bank
  • The objective of the assignment is to prepare detailed designs for additional 28.5 hectares of the on-farm irrigation network under command of Bagramyan-Norakert gravity irrigation scheme. · 21 Dec 2018 · USD 8K · World Bank
  • Development of Architectural Designs and Technical Specifications for Rehabilitation of 6 High Schools · 05 May 2016 · USD 193K · World Bank
  • Design and (follow-on) supervision of additional works for improvement of GTC · 16 Mar 2016 · USD 13K · World Bank
  • Design and Author’s Supervision of Diversion Canals of Achajur, Noyemberyan 4-stage, Zeytun-Haghtanak, Metsamor (Tandzut Ghamlu) and Ghara-Ghala Pumps Stations · 05 May 2014 · USD 109K · World Bank
  • Carry out Author’s Supervision (designer’s supervision) during construction (Phase III). · 05 May 2014 · USD 24K · World Bank
  • The selected consulting firm shall (i) carry out feasibility study, (Phase I); (ii) prepare Detailed Design Packages, including (EIA), EMP and RAP. · 05 May 2014 · USD 105K · World Bank
  • Design Author’s Supervision over Construction of Meghri Gravity Scheme · 04 Mar 2014 · USD 39K · World Bank
  • GYUMRI TECHNOLOGY CENTER REFURBISHMENT FOLLOW ON SUPERVISION AND TECHNICAL SUPERVISION · 20 Jun 2012 · USD 23K · World Bank
  • Design of additional repairs for the Republican Veterinary Diagnostic and Anti-Epidemic Center · 21 May 2010 · USD 2K · World Bank
  • Supervision works Renovation of Veterinary centerhe · 19 May 2009 · USD 7K · World Bank
  • Construction of Agarak Veterinary and Plant Quarantine Border Post Building of the RA MOA · 28 Feb 2008 · USD 1K · World Bank

Method

Computed from 13 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.