Contractor intelligence · computed from public award records
IDEA GRUP A.Ş.
- Awards won
- 12
- Known value
- USD 1.3M
- First award
- 14 Aug 2024
- Most recent
- 05 Jun 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 12 | USD 1.3M | 05 Jun 2026 |
Where the work is
TR · 12
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- WAPCOS LIMITED · 9 shared contracts
- KERR ENGINEERING S.P.A · 2 shared contracts
- GÖZE ENERJI A.Ş. · 1 shared contract
- INTERDIL S.R.L · 1 shared contract
- WABCOS LIMITED · 1 shared contract
- A.V.D ENERJI VERIMLILIĞI DAN.EĞT.İNŞ.ELK.MAK.İTH.İHR.SAN.LTD.ŞTI. · 1 shared contract
- INTEREDIL GROUP ENGINEERING · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Consultancy Services for Construction Supervision Services for Edremit Municipality Solar Power Plant (SPP) Project · 05 Jun 2026 · USD 94K · World Bank
- Gerede Belediyesi Güneş Enerji Santrali (GES) Projesi Tasarım İzleme (Gözden Geçirme) ve İnşaat Kontrollüğü için Danışmanlık Hizmetleri · 15 Sept 2025 · USD 56K · World Bank
- Design Review and Supervision Consultancy Services for Yenişehir (Mersin) Municipality Solar Power Plant (SPP) Project (YENİSEHİR-PUMREP-C1) · 04 Sept 2025 · USD 35K · World Bank
- Consulting Services for Preparation of Energy Audit and Technical Designs of Energy Efficiency Renovations in Karaman · 31 Jul 2025 · USD 101K · World Bank
- Consultancy Services for Design Review and Preparation of Bidding Documents for Suluova (Amasya) Alaçam-Evricek Water Transmission Line Project · 07 Mar 2025 · USD 71K · World Bank
- Consultancy Services for Construction Supervision Services for Suluova (Amasya) Alaçam-Evricek Water Transmission Line Project · 07 Mar 2025 · USD 157K · World Bank
- Consultancy Services for Construction Supervision Services for Alaplı Municipality Solar Power Plant (SPP) Project · 27 Feb 2025 · USD 35K · World Bank
- Dikili Belediyesi Güneş Enerji Santrali (GES) Projesi Tasarım İzleme (Gözden Geçirme) ve İnşaat Kontrollüğü için Danışmanlık Hizmetleri · 30 Jan 2025 · USD 74K · World Bank
- Feasibility Studies for Renewable Energy Installations Consultancy Services for Group -7 · 02 Jan 2025 · USD 92K · World Bank
- Construction Supervision Services for Kadirli Municipality Solar Power Plant (SPP) Project · 23 Dec 2024 · USD 59K · World Bank
- Consultancy Services for Design Review and Preparation of Bidding Documents for Niğde Sub-Project (NIGDE-C1/A) · 14 Aug 2024 · USD 286K · World Bank
- Consultancy Services for Construction Supervision for Niğde Sub-Project (NIGDE-C1/B) · 14 Aug 2024 · USD 286K · World Bank
Method
Computed from 12 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.