Contractor intelligence · computed from public award records
INSTITUTE OF WATER MODELING
- Awards won
- 23
- Known value
- USD 14.2M
- First award
- 17 Sept 2013
- Most recent
- 06 May 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 23 | USD 14.2M | 06 May 2026 |
Where the work is
BD · 19IN · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- DEVCONSULTANTS LIMITED (DEVCON), BANGLADESH (LEAD PARTNER) · 2 shared contracts
- DOHWA ENGINEERING CO., LTD. · 1 shared contract
- AQUA CONSULTANT & ASSOCIATES LTD. · 1 shared contract
- LEA ASSOCIATES SOUTH ESIA PVT. LTD.,(LASA) · 1 shared contract
- DEVELOPMENT DESIGN CONSULTANTS LTD. (BANGLADESH) · 1 shared contract
- DEVCONSULTANT LTD, BANGLADESH · 1 shared contract
- ENGINEERING AND PLANNING CONSULTANTS LTD. (EPC) · 1 shared contract
- DEV CONSULTANTS LIMITED · 1 shared contract
- ROYAL HAKONING DHV · 1 shared contract
- DEV CONSULTANTS (LEAD PARTNER) · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Consulting Services for Feasibility Study for Emergency Flood Response project in the Flood/Disaster Affected Districts of Bangladesh · 03 Nov 2024 · USD 518K · World Bank
- ODK based SSP Integration for Collaborative Forest Management and Monitoring · 01 Aug 2024 · USD 65K · World Bank
- Consulting Services for Feasibility Study of Improvement of Connectivity and Community Infrastructure Development in the Selected Polders of Coastal Zone of Bangladesh. · 30 Jun 2024 · USD 414K · World Bank
- Consultancy Services for Design and Construction Supervision · 30 Apr 2024 · USD 762K · World Bank
- Consulting Services for Environmental and Social Framework Compliance Study for future Project · 11 Jan 2024 · USD 467K · World Bank
- Marine Spatial Planning · 15 Mar 2023 · USD 471K · World Bank
- Consulting Services for Bird and Bat survey at Two Locations in Connection with Wind Energy Assessment · 19 Feb 2023 · USD 104K · World Bank
- Monitoring & supervision of water supply and sanitation schemes including review and update of existing drawing and design, EIA and SIA and establishment of ICT Monitoring System. · 22 Dec 2022 · USD 1.6M · World Bank
- Selection of firm for Feasibility Study & Detail Engineering Drawing on Appropriate Water Supply Technologies in Climate Risk Hot spots of coastal Areas · 20 Nov 2022 · USD 1.1M · World Bank
- Expansion flood forecasting model & Improve inundation model in coastal and hotspot areas. · 30 Nov 2021 · USD 545K · World Bank
- Pourashava Sanitation Support Consultancy · 21 Nov 2021 · USD 407K · World Bank
- Selection of Consulting Firm for Site Specific Plan (SSP) and ODK Development · 21 Jan 2021 · USD 295K · World Bank
- Selection of Consulting Firm for Environmental and Social Impact Assessment (ESIA), Regional Environmental and Social Assessment (RESA) and Environmental and Social Management Framework (ESMF) for PRI · 13 Nov 2019 · USD 81K · World Bank
- Consultancy Services for Feasibility Studies and Preparation of Conceptual Designs and Bidding Documents for DBO/DB Contracts (Package No.: S-2) · 13 Sept 2018 · USD 746K · World Bank
- Non-Consultancy Services of Site Survey for Selection of Hydrometric Stations in connection to on-going Bangladesh Weather and Climate Services Regional Project (BWCSRP); Component-B · 27 Aug 2018 · USD 70K · World Bank
- Site Survey for Selection of Hydrometric Stations” (Package No. BWDB NS-6) under Bangladesh Weather and Climate Services Regional Project (BWCSRP); Component-B: Strengthening Hydrological Informatio · 27 Aug 2018 · USD 70K · World Bank
- Consultancy Services for Preparation of EIA and Environmental Management Framework (Package S-3) · 08 Mar 2018 · USD 285K · World Bank
- S-12: Community Mobilization and Development of Action Plan for Rural Non-Piped Water supply scheme and Community Awareness Building on Sanitation and Hygiene (North-South Zone-185 Unions). · 19 Nov 2013 · USD 1.2M · World Bank
- S-06: Socio-Economic Study, Technical Survery & Investigation, Detail Engineering Design & Construction Supervision and Community Mobilization of Rural Water Supply Schemes · 17 Nov 2013 · USD 3.1M · World Bank
- S-7: Water Resources Study - Groundwater Hydrology and Rain Water Harvesting · 17 Sept 2013 · USD 222K · World Bank
Method
Computed from 23 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.