IRRIGATION AND WATER UTILIZATION MANAGEMENT DEPARTMENT
- Awards won
- 28
- Known value
- USD 40.6M
- First award
- 22 Feb 2018
- Most recent
- 24 Aug 2020
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 28 | USD 40.6M | 24 Aug 2020 |
Where the work is
MM · 28
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- The construction and Rehabilitation of work Irrigation Site - Baw Ni · 24 Dec 2019 · USD 1.7M · World Bank
- The construction and Rehabilitation of work for Irrigation Site – Thae Gaw · 24 Dec 2019 · USD 1.3M · World Bank
- The construction and rehabilitation of work for W 23 North Yamar Irrigation schemes · 10 Dec 2019 · USD 932K · World Bank
- The construction and rehabilitation of work for W 25 Swa Irrigation schemes · 10 Dec 2019 · USD 4.6M · World Bank
- The construction and rehabilitation of work for W 24 Marle Nat Taung Irrigation schemes · 10 Dec 2019 · USD 1.6M · World Bank
- The Construction and Rehabilitation of Work for Sinthe Irrigation Schemes for 2019/2020 Fiscal Year · 10 Dec 2019 · USD 974K · World Bank
- Phase 1 - Preparatory Work for New SWA Spillway · 05 Jun 2019 · USD 686K · World Bank
- ADSP W18-A- 2018-2019 Rehabilitation of work for Irrigation site for North Yamar- Earth work and Grass portion Work between RD 20000 to 23000, Stone Lining Work RD 14900 to 15700, RD 37760 to 38500, · 17 May 2019 · USD 1.7M · World Bank
- ADSP W19 A - 2018-2019 Rehabilitation of work for Irrigation site for Marlenat Taung- Dam Safety Work for Cement Grouting Work Crest Drain, Bern Drain, Toe Drain Conduit Repair Work. Improvement of C · 17 May 2019 · USD 1.8M · World Bank
- ADSP W20-A- 2018-2019 Rehabilitation of work for Irrigation site for SWA- Stone Lining works at Main canal RD 0 to 2500, RD 10150 to 11150 and RD 19000 to 20000. Main Canal Structure Direct Outlet D · 17 May 2019 · USD 1.5M · World Bank
- Reference No. : ADSP W17-A- 2018-2019 Rehabilitation of work for Irrigation site for Sinthe. DY (1) Earth Work in Cutting, Filling and Slope Dressing (by Machine), Stone Lining RD 2871 to 12027, Stru · 17 May 2019 · USD 1.3M · World Bank
- Rehabilitation of Work for Irrigation Site Swa, Main Canal Earth Work (RD 0 to 86000) and Earth Work ( DY 2- RD 0 to 50000), Stone Lining ( Between DY 2- RD 0 to 15105) · 20 Feb 2019 · USD 2.5M · World Bank
- Rehabilitation of Work for Irrigation Site - Marlae Nat Taung, Earth Work of LMC RD 0+000 to RD 28+000 DY RD 0+000 to RD 7+300, RMC-1 RD 0+000 to RD 44+100 DY RD RD 0+000 to RD 6+900 and RMC-2 RD 0+ · 16 Jan 2019 · USD 2.7M · World Bank
- Rehabilitation of Work for Irrigation Site - North Yamar, Stone Lining Work with Associated Works (From RD 32+000 to RD 41+000 and RD 48+400 to 52+800) · 16 Jan 2019 · USD 2.7M · World Bank
- Rehabilitation of Work for Irrigation Site - Sinthe Left Main Canal, Earth work from RD 0+000 to RD 59+000 and from DY 1 to DY 5, Stone Lining Work with Associated Works from RD 2585' to 14000' - RD 1 · 16 Jan 2019 · USD 3.2M · World Bank
- The Construction and Rehabilitation of Work for Irrigation Site Swar (DY 7 Head Regulator Rehabilitation and Stone Lining 1220 ft) · 11 Jun 2018 · USD 145K · World Bank
- Rehabilitation of Work for Irrigation Site - Marlae Nat Taung (Stone Lining 350 ft) and Canal Crossing Bridge 3 nos · 11 Jun 2018 · USD 115K · World Bank
- The Construction and Rehabilitation of the North Yamar Irrigation Scheme(Stone Lining RD 0 to 2000, RD 12850 to 20000, Between RD 20000 and 72640 ) Construction and Rehabilitation of Stucture 9 nos · 11 Jun 2018 · USD 362K · World Bank
- The Construction and Rehabilitation of theMain Canal of North Yamar Irrigation Scheme · 22 Feb 2018 · USD 2.6M · World Bank
- The Construction and Rehabilitation of Left Main Canal Sinthe Irrigation Scheme · 22 Feb 2018 · USD 2.5M · World Bank
Method
Computed from 28 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.