KAMI SHERPA

Awards won
11
Known value
USD 629K
First award
03 Sept 2022
Most recent
12 Jun 2023

Wins by funder

FunderAwardsKnown valueMost recent
World Bank11USD 629K12 Jun 2023

Where the work is

IN · 11

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Construction of crate wall and collection tanks, providing and laying HDPE pipes and excavation of HDPE pipes at Shansha cluster District Lahaul & Spiti. · 12 Jun 2023 · USD 80K · World Bank
  • (i) construction of Crate wall at Source 1 & 2 (ii) construction of collection Tank -2 Nos at Source (iii) Retaining wall 2Nos at WUA RangWay District lauhalSpiti. · 13 Apr 2023 · USD 27K · World Bank
  • (i) C/o RCC Tank no.-3 (50,000 ltrs 1-Nos) (ii) Retaining wall 1 Nos (iii) P/L of HDPE Pipe PE-100 PN-8 40mm dia 1771 meter (iv) Excavation for HDPE pipes 1817 meter (v) 40mm PP Valve 60 Nos (vi) 40mm · 13 Apr 2023 · USD 29K · World Bank
  • P/L of HDPE Pipe PE-100 PN-8 90mm dia 2271 meter, PE-100 PN-8 63mm dia 712 mt & PE-100 PN-8 40mm dia 1521mt (ii) Excavation for HDPE pipes 4504 mtr (iii) 40mm PP Valve 30 Nos, 63mm PP Valve 20 Nos & 9 · 13 Apr 2023 · USD 30K · World Bank
  • P/L of HDPE Pipe PE-100 PN-8 40mm dia 1817mtr, PE-100 PN-8 63mm dia 3186mt (ii) Excavation for HDPE pipes 5003 mt (iii) 40mm PP Valve 85 Nos, 63mm PP Valve 100 Nos (iv) 40mm Tees 85 Nos, 63mm Tees 100 · 13 Apr 2023 · USD 32K · World Bank
  • (i) C/o RCC Tank no.-1 & 2 (50,000 ltrs 1 Nos ) (ii) Retaining wall 2 Nos at WUA Rangway Distrcit lauhal &Spiti · 14 Oct 2022 · USD 41K · World Bank
  • i) C/o RCC Tank no.-4 & 5 (50,000 ltrs 1 Nos ) (ii) Retaining wall 2 Nos lahul & spiti · 14 Oct 2022 · USD 37K · World Bank
  • Construction of 9 number of RCC tanks, providing and laying of HDPE pipes and excavation of HDPE pipes at Shansha cluster District Lahaul & Spiti. · 28 Sept 2022 · USD 66K · World Bank
  • Construction of crate walls at source 1 & 2,Constructin of collection tanks, construction of RCC tanks, retaining walls and excavation of HDPE pipes. at Shansha cluster District Lahaul & Spiti. · 17 Sept 2022 · USD 139K · World Bank
  • Procurement of Tank (25,000 Ltr Capacity each). (50,000 Ltr Capacity ) Retaining Wall, Excavation for HDPE Tubes pipes, P/L HDPE pipes in trenches at Raugi Distt. Kullu (WUA Community Procurement) · 15 Sept 2022 · USD 75K · World Bank
  • (i)C/o crate wall at source & collection tank-1 (ii) , Tank no. 1,3 & 4 - 1 nos (50,000 Ltr each & Tank no. 2, 5 & 6 -(3 )(1,00,000 Ltr each) (iii) Excavation for GI Tubes pipes 3976 mtr length Dia 10 · 03 Sept 2022 · USD 73K · World Bank

Method

Computed from 11 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.