Skip to main content

Contractor intelligence · computed from public award records

MILKI CONSULTING PLC

Awards won
9
Known value
USD 2.1M
First award
12 Feb 2018
Most recent
12 Dec 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank9USD 2.1M12 Dec 2025

Where the work is

ET · 3

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Borehole Yield & Water Quality Verification, Detail Study & Design, Contract Administration & Construction Supervision of Marmero in Taltalle Wereda, Olgabissa in Yabell Woreda, & Qaxe in Arero · 12 Dec 2025 · USD 460K · World Bank
  • Consultancy Services by Woreda Support Groups for 17 Woredas of Amhara, Oromia, Central Ethiopia, South Ethiopia, and Sidama Regions in 4 Different Lots (Lot 5 to Lot 8)- LOT 6 · 03 Dec 2025 · USD 192K · World Bank
  • Consultancy Services by Woreda Support Groups for 17 Woredas of Amhara, Oromia, Central Ethiopia, South Ethiopia, and Sidama Regions in 4 Different Lots (Lot 5 to Lot 8)- LOT 5 · 03 Dec 2025 · USD 317K · World Bank
  • Borehole Yield and Water Quality Verification, Detail Study and Design, Contract Administration and Construction Supervision of Babuzenda-Yabubu site in Guba Woreda, Metekel zone, Benishangul Region · 17 Sept 2025 · USD 185K · World Bank
  • Borehole Yield and Water Quality Verification, Detail Study and Design, Contract Administration and Construction Supervision of the Hado Gabite site in Uba Debretsehay Woreda of South Omo Zone, South · 17 Sept 2025 · USD 161K · World Bank
  • Borehole Yield and Water Quality Verification, Detail Study and Design, Contract Administration and Construction Supervision of Yarenji site in Guba Woreda, Gonkore site in Sedal Wereda of Benishangul · 17 Sept 2025 · USD 346K · World Bank
  • Feasibility Study and Detail Design, Tender Document Preparation evaluation and Construction Supervision for well drilling of CR-WSSH Facilities in Salahad and Dhuhun Multi-village WSP · 27 Jun 2022 · USD 214K · World Bank
  • Feasibility Study and Design of Metarba Micro Earth Dam Small-Scale Irrigation Projects found at Liban Jawwi Woredas, West Shoa Zone. · 12 Jul 2018 · USD 119K · World Bank
  • Feasibility Study and Design of 5 SSIP of AGP-II different Woredas · 12 Feb 2018 · USD 108K · World Bank

Method

Computed from 9 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.