Skip to main content

Contractor intelligence · computed from public award records

MOTHERCAT LIMITED

Awards won
14
Known value
USD 163.3M
First award
25 Jul 2000
Most recent
08 Apr 2026

Wins by funder

FunderAwardsKnown valueMost recent
World Bank14USD 163.3M08 Apr 2026

Where the work is

NG · 12

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Construction Works for Flood/Gully Erosion Control Sites at Rigasa/Tudun Wada, Kaduna State (Lot 2) · 08 Apr 2026 · USD 25.0M · World Bank
  • LOT. 1 Upgrading of 30.33km Rural Road Charachara - Ragwam - Magwanshi - Lafiya in Katagum L.G.A Bauchi State. · 30 Jul 2024 · USD 3.5M · World Bank
  • Construction of Storm water Harvesting Structures (Ponds) Along Katsina Phase 1 and 2 Storm Water Drainage Management project · 24 Jun 2024 · USD 4.0M · World Bank
  • Desilting of Existing Drainages in Katsina State · 24 Jun 2024 · USD 1.0M · World Bank
  • Lot 3: Procurement of Contractor for Erosion control, Stabilization, Channeling and Reclamation works at Ankpa, Ankpa LGA, Kogi State. · 08 Apr 2024 · USD 10.7M · World Bank
  • CONSTRUCTION OF KATSINA PHASE II - STORM WATER DRAINAGE MANAGEMENT (EMERGENCY SITE) IN KATSINA STATE · 23 May 2023 · USD 24.4M · World Bank
  • CONSTRUCTION OF JIBIA PHASE II INTERVENTION, RIVER BANK PROTECTION IN JIBIA TOWN FOR FLOOD CONTROL (EMERGENCY SITE) IN KATSINA STATE · 22 May 2023 · USD 23.4M · World Bank
  • CONSTRUCTION OF DANJA – BAZANGA – NAHUCE – WITH SPUR FROM BAZANGA TO KOKAMI DEMOSTRATION ROAD IN KATSINA STATE · 29 Aug 2022 · USD 5.6M · World Bank
  • LOT 1: CONSTRUCTION OF STORMWATER DRAINAGEMENT IN KATSINA TOWN OF KATSINA STATE. · 15 Jun 2020 · USD 13.4M · World Bank
  • PROCUREMENT OF CONTRACTOR FOR THE JIBIA PROPOSED PHASE 1 INTERVENTION, URBAN DRAINAGE NETWORK, FOR JIBIA TOWN FLOOD CONTROL (EMERGENCY SITE) IN KATSINA STATE · 09 Jun 2020 · USD 23.4M · World Bank
  • CONSTRUCTION OF 1000/900MM PUMPING MAINS FROM GUBI DAM TREATMENT PLANT TO WARINJE HILL · 13 Feb 2019 · USD 10.3M · World Bank
  • CONSTRUCTION OF 7000M3 CAPACITY CONCRETE RESERVOIR AT BUZAYE HILL AND REHABILITATION OF 2 X 11,000M3 CONCRETE RESERVOIRS AT WARINJE HILL · 01 Jan 2019 · USD 5.3M · World Bank
  • REHABILITATION/MAINTENANCE OF RURAL ROADS - OUTPUT AND PERFORMANCE BASED ROAD CONTRACTS (OPRC) · 18 Mar 2011 · USD 13.0M · World Bank
  • INSTALLATIONS OF DOMESTIC/COMMERCIAL WATER METERS&CONSTRUCT.CHAMBERS-LOT 1A&1B · 25 Jul 2000 · USD 321K · World Bank

Method

Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.