Contractor intelligence · computed from public award records
MOTHERCAT LIMITED
- Awards won
- 14
- Known value
- USD 163.3M
- First award
- 25 Jul 2000
- Most recent
- 08 Apr 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 14 | USD 163.3M | 08 Apr 2026 |
Where the work is
NG · 12
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Construction Works for Flood/Gully Erosion Control Sites at Rigasa/Tudun Wada, Kaduna State (Lot 2) · 08 Apr 2026 · USD 25.0M · World Bank
- LOT. 1 Upgrading of 30.33km Rural Road Charachara - Ragwam - Magwanshi - Lafiya in Katagum L.G.A Bauchi State. · 30 Jul 2024 · USD 3.5M · World Bank
- Construction of Storm water Harvesting Structures (Ponds) Along Katsina Phase 1 and 2 Storm Water Drainage Management project · 24 Jun 2024 · USD 4.0M · World Bank
- Desilting of Existing Drainages in Katsina State · 24 Jun 2024 · USD 1.0M · World Bank
- Lot 3: Procurement of Contractor for Erosion control, Stabilization, Channeling and Reclamation works at Ankpa, Ankpa LGA, Kogi State. · 08 Apr 2024 · USD 10.7M · World Bank
- CONSTRUCTION OF KATSINA PHASE II - STORM WATER DRAINAGE MANAGEMENT (EMERGENCY SITE) IN KATSINA STATE · 23 May 2023 · USD 24.4M · World Bank
- CONSTRUCTION OF JIBIA PHASE II INTERVENTION, RIVER BANK PROTECTION IN JIBIA TOWN FOR FLOOD CONTROL (EMERGENCY SITE) IN KATSINA STATE · 22 May 2023 · USD 23.4M · World Bank
- CONSTRUCTION OF DANJA – BAZANGA – NAHUCE – WITH SPUR FROM BAZANGA TO KOKAMI DEMOSTRATION ROAD IN KATSINA STATE · 29 Aug 2022 · USD 5.6M · World Bank
- LOT 1: CONSTRUCTION OF STORMWATER DRAINAGEMENT IN KATSINA TOWN OF KATSINA STATE. · 15 Jun 2020 · USD 13.4M · World Bank
- PROCUREMENT OF CONTRACTOR FOR THE JIBIA PROPOSED PHASE 1 INTERVENTION, URBAN DRAINAGE NETWORK, FOR JIBIA TOWN FLOOD CONTROL (EMERGENCY SITE) IN KATSINA STATE · 09 Jun 2020 · USD 23.4M · World Bank
- CONSTRUCTION OF 1000/900MM PUMPING MAINS FROM GUBI DAM TREATMENT PLANT TO WARINJE HILL · 13 Feb 2019 · USD 10.3M · World Bank
- CONSTRUCTION OF 7000M3 CAPACITY CONCRETE RESERVOIR AT BUZAYE HILL AND REHABILITATION OF 2 X 11,000M3 CONCRETE RESERVOIRS AT WARINJE HILL · 01 Jan 2019 · USD 5.3M · World Bank
- REHABILITATION/MAINTENANCE OF RURAL ROADS - OUTPUT AND PERFORMANCE BASED ROAD CONTRACTS (OPRC) · 18 Mar 2011 · USD 13.0M · World Bank
- INSTALLATIONS OF DOMESTIC/COMMERCIAL WATER METERS&CONSTRUCT.CHAMBERS-LOT 1A&1B · 25 Jul 2000 · USD 321K · World Bank
Method
Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.