NORCONSULT AS

Awards won
9
Known value
USD 12.3M
First award
30 Jul 2004
Most recent
02 Feb 2016

Wins by funder

FunderAwardsKnown valueMost recent
World Bank9USD 12.3M02 Feb 2016

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • PREPARATION OF AN INTEGRATED RESOURCE PLAN (IRP) FOR MALAWI · 02 Feb 2016 · USD 496K · World Bank
  • Technical and Economic Feasibility Study of pPhase 1 of the Mozambican Integrated Transmission Backbone System · 23 Dec 2009 · USD 5.1M · World Bank
  • Feasibility Study for Phombeya-Nampula Transmission Lina · 15 Apr 2009 · USD 1.6M · World Bank
  • ASSIGNMENT III: CONSTRUCTION OF 390 KMS OF 132KV TRANSMISSION LINES · 29 Dec 2008 · USD 314K · World Bank
  • DESIGN, TENDERING AND SUPERVISION OF CONSTRUCTION WORKS FOR FACILITIES AND INFRASTRUCTURES IN THE CHIMANIMANI NATIONAL RESERVE. · 22 Dec 2008 · USD 427K · World Bank
  • REVIEW OF TECH.FEATURES OF TRANSMISSION SYSTEM,ADEQUACY OF METERING INSTRUMENTS AND TRANSMISSION AND MAJOR DISRIBUTION LINE ROUTES,TAKE ENVIRON.SCOPING.PREPARE DETAILED DESCRIP:ECON.FINANCIA,ENVIRON · 11 Nov 2008 · USD 287K · World Bank
  • CONSULTANCY SERVICES FOR STRATEGIC ENVIRON.ASSESSMENTS FOR THE APL-2 RBMMP ROADS III · 01 Jun 2007 · USD 155K · World Bank
  • ENVIRONMENTAL IMPACT ASSESSMENT - COMPONENT B · 18 Nov 2005 · USD 121K · World Bank
  • GRID INTENSIFICATION OF PERI-URBAN AREAS COMPONENT · 30 Jul 2004 · USD 3.8M · World Bank

Method

Computed from 9 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.