NRECA INTERNATIONAL
- Awards won
- 20
- Known value
- USD 13.4M
- First award
- 08 Apr 2002
- Most recent
- 24 Apr 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 18 | USD 12.8M | 24 Apr 2026 |
| Inter-American Development Bank | 2 | USD 608K | 19 Jun 2019 |
Where the work is
MZ · 3AO · 2CG · 2GT · 1JM · 1KE · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- TECNICA ENGENHEIROS CONSULTORES, LDA · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Supply and installation of a Geospatial Network Information System for RNT · 24 Apr 2026 · USD 2.0M · World Bank
- Consultancy Services to Update the Technical Standards for the Design and Construction of Electricity Distribution Infrastructures in Rural and Peri-urban Areas in Mozambique Considering Climate resil · 07 Jan 2026 · USD 299K · World Bank
- Recrutement d un cabinet chargé de la mise à jour des normes techniques pour la conception et la construction des infrastructures de distribution en République du Congo · 17 Mar 2025 · USD 286K · World Bank
- Recrutement d'un consultant pour la préparation de la stratégie nationale d'électrification de la République du Congo · 17 Mar 2025 · USD 288K · World Bank
- PROVISION OF TECHNICAL ASSISTANCE SUPPORT TO FINALISE THE NATIONAL ELECTRIFICATION STRATEGY FOR ZIMBABWE · 15 Oct 2024 · USD 118K · World Bank
- Audit of Supplied Materials under Proenergia Project · 01 Jul 2021 · USD 154K · World Bank
- LEAST-COST GEOSPATIAL ELECTRIFICATION OPTIONS ANALYSIS FOR LAST-MILE EXTENSION OF GRID IN THE PROJECT AREA (PARTIAL STUDY) · 03 Aug 2020 · USD 362K · World Bank
- Energy Management and Efficiency Programme · 19 Jun 2019 · USD 228K · Inter-American Development Bank
- Updating Technical Standards for Design and Construction of Electricity Distribution Infrastructure aimed to be used in the Mozambique for All Energy Project · 13 Feb 2019 · USD 505K · World Bank
- Consultancy Services for preparation of Mini grid and Stand a lone System Profiles and Bidding Documents · 25 Oct 2018 · USD 618K · World Bank
- Supervision and Management Consultancy Services · 15 Dec 2015 · USD 4.8M · World Bank
- Consultancy for the preparation of an Electricity Network Investment Plan · 26 Jun 2015 · USD 624K · World Bank
- Institutional Support and Technical Assistance (S2) · 09 Oct 2012 · USD 733K · World Bank
- Engineering Design and Construction supervision for grid Component (S1) · 09 Oct 2012 · USD 751K · World Bank
- Rural Electrification Master Plan of Guatemala · 05 Jul 2011 · USD 380K · Inter-American Development Bank
- Management assistance for company-wide technical direction and oversight · 01 Sept 2010 · USD 625K · World Bank
- Design Low Cost Rural Grid Sub-Station & Technical Assistance to Local Consultant on 33KV Network Planning · 22 Jul 2009 · USD 80K · World Bank
- INSTITUTIONAL SET-UP AND POLICY/REGULATORY FRAMEWORK FOR RURAL ELECTRIFICATION · 24 Apr 2008 · USD 155K · World Bank
- NATIONAL RURLAL ELECTRIFICATION STRATEGY · 01 Oct 2005 · USD 256K · World Bank
- ELABORACION DE TRES DIAGNOSTICOS DE INFRAESTRUCTURA DE EMPRESAS ELECTRICAS MUNICIPALES EN EL INTERIOR DEL PAIS · 08 Apr 2002 · USD 142K · World Bank
Method
Computed from 20 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.