Skip to main content

Contractor intelligence · computed from public award records

PANKAJ KUMAR

Awards won
25
Known value
USD 278K
First award
12 Oct 2016
Most recent
24 Nov 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank25USD 278K24 Nov 2025

Where the work is

IN · 25

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Pr No. 332 · 24 Nov 2025 · USD 4K · World Bank
  • Pr No.115 · 11 Dec 2024 · USD 4K · World Bank
  • Pr No. 321 · 08 Jan 2024 · USD 2K · World Bank
  • Construction of Retaining Wall PCDO Rajgarh · 19 Feb 2022 · USD 6K · World Bank
  • 25.Construction of Community Water Harvesting Structure under (Primary Water Harvesting & Storage) · 23 Dec 2021 · USD 4K · World Bank
  • 14.Construction of Sub Surface Dykes (Mackhowal) under (Primary Water Harvesting and Storage Structure) · 22 Dec 2021 · USD 4K · World Bank
  • Raising of Plantation Fencing work in MF Ser Manon 5ha /2021-22 in GP Ser manon Under APO Unit Rajgarh · 30 Jul 2021 · USD 2K · World Bank
  • 13 Plantation of 1100 plants per/ha) along Drainage lines areas · 25 Jun 2021 · USD 3K · World Bank
  • 23.Construction of primary water harvesting and storage structure · 23 Feb 2021 · USD 6K · World Bank
  • 17. Construction of ponds (manual excavation) at different locations (3 APO units) in two phases i.e. during December 2020(20 ponds) and may 2021. · 05 Feb 2021 · USD 6K · World Bank
  • Construction of DSCB in RF Bohal PartI and Part II/2020-21 in GP Bhanat under APO Unit Rajgarh Job No R-6 · 03 Feb 2021 · USD 9K · World Bank
  • Supply of Nursery seeds for use in Udaipur Nursery (Pankaj Kumar) · 05 Jan 2021 · USD 37 · World Bank
  • (1) Bajrangbali To Bande Siman Via Kasturba Vidyalaya · 22 Dec 2020 · USD 168K · World Bank
  • Plantation work in MF Ser-Manon =10 hectare in GP Bhanat · 10 Dec 2020 · USD 4K · World Bank
  • Plantation work in PF Jubble =8 hectare (Enrichment=5 hectare, DLT=3 hectare) during year 2020-21 · 10 Dec 2020 · USD 4K · World Bank
  • OPERATIONAL IMPROVEMENT FOR IMPROVED WATER SUPPLY SERVICE LEVELS OF VILLAGE BHATTIAN JATTAN BLOCK MUKERIAN DISTT. HOSHIARPUR UNDER 2B PRWSSIP.REPAIR OF PUMP CHAMBER, PROVIDING AND FIXING DISINFECTION · 25 Dec 2016 · USD 1K · World Bank
  • OPERATIONAL IMPROVEMENT FOR IMPROVED WATER SUPPLY SERVICE LEVELS OF VILLAGE DAD BLOCK MUKERIAN DISTT. HOSHIARPUR UNDER 2B PRWSSIP. REPAIR OF PUMP CHAMBER, PROVIDING AND FIXING DISINFECTION UNIT, PAINT · 25 Dec 2016 · USD 5K · World Bank
  • Improved Access to Water through Household connections of Village Sadhani Block Talwara Distt. Hoshiarpur under 2a PRWSSIP. PROVIDING, LAYIN, JOINTING & FIXING G.I. PIPE LINE, WATER CONNECTION ON EXIS · 10 Nov 2016 · USD 6K · World Bank
  • OPERATIONAL IMPROVEMENT FOR IMPROVED WATER SUPPLY SERVICE LEVELS OF VILLAGE GUJJAR KATRALA BLOCK MUKERIAN DISTT. HOSHIARPUR UNDER 2B PRWSSIP. REPAIR OF PUMP CHAMBER, PROVIDING AND INSTALLING CHLORINAT · 13 Oct 2016 · USD 13K · World Bank
  • Village Bishanpur, Block Mukerian Repair of Pump chamber of size 3.70 mm X 4.30 mm of DWSS standard design exists at W/W site shall be used after necessary repairs./Plinth Protection arround OHSR of 5 · 12 Oct 2016 · USD 5K · World Bank

Method

Computed from 25 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.