Contractor intelligence · computed from public award records
PE KELAJAK-S
- Awards won
- 34
- Known value
- USD 410K
- First award
- 13 Jun 2022
- Most recent
- 10 Feb 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 34 | USD 410K | 10 Feb 2026 |
Where the work is
UZ · 34
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Repair (asphalting) of 3.5 km of roads on the section of the MCA "Maidon" Chust district · 25 Dec 2024 · USD 6K · World Bank
- Installation of asphalt concrete pavements of internal roads 9.4 km on the section of the MCA "Anchor" Papsky district · 25 Dec 2024 · USD 13K · World Bank
- Installation of asphalt concrete pavements of internal roads 4.2 km on the section of the MCA "Obihaet" Papsky district · 25 Dec 2024 · USD 6K · World Bank
- Laying of 0.4 kV electric network along Sarishta, Yoshlik, Zavk, Guliston, Mezbon, Dustlik streets 7.92 km and installation of 10/0.4 kV transformer substation (2 pcs.) on the Kozokovul MCA site in Mi · 05 Nov 2024 · USD 5K · World Bank
- Installation of asphalt concrete pavements of internal roads 4.2 km on the section of the MCA "Chiganok" Papsky district · 02 Nov 2024 · USD 9K · World Bank
- Repair (gravel pavement, asphalt paving) of internal roads 11.4 km on the section of the MCA "Solmon" (Yukori Zamin, Iskowoot, Sokhilbuyi, Mustakillik streets) of the Yangikurgan district · 29 Oct 2024 · USD 18K · World Bank
- Repair (asphalting) of internal roads 7.1 km on the section of the MCA "Gaznon" (Gaznon, Kurama, Chinor, Zabardast, Uzumzor streets) of the Yangikurgan district · 29 Oct 2024 · USD 12K · World Bank
- Installation of asphalt concrete pavements of internal roads 5.9 km on the section of the MCA "Margizor" Papsky district · 29 Oct 2024 · USD 9K · World Bank
- Reconstruction of buildings and structures of the family polyclinic in MCA Yangiyer, Chust district · 06 Oct 2023 · USD 11K · World Bank
- Construction of an additional building for 120 places for a preschool educational organization No. 64 in the MCA "Rezaksoy" of the Chust district · 06 Oct 2023 · USD 3K · World Bank
- Construction of SVP for 50 places in MCA "Madaniyat" of Pap district · 07 Aug 2023 · USD 17K · World Bank
- Improvement of power supply on the territory of MSG "Istiklol" of Bulakbashi district · 07 Aug 2023 · USD 12K · World Bank
- Improvement of power supply on the territory of MCA "Kuprikboshi" of Bulakbashi district · 07 Aug 2023 · USD 10K · World Bank
- Improvement of power supply on the territory of MCA "Soybuyi" of Bulakbashi district · 07 Aug 2023 · USD 8K · World Bank
- Laying an additional network to drinking water supply networks (1.5 km) in the Oksuv-Govazon MCA, Yangikurgan district · 07 Aug 2023 · USD 11K · World Bank
- Improvement of power supply (15 km) in MCA "Mukimi", Pap district · 07 Aug 2023 · USD 15K · World Bank
- Improvement of power supply (14 km) in the MCA "Toshkurgan" of the Pap district · 07 Aug 2023 · USD 15K · World Bank
- Design services for the subprojects ""Reconstruction of drinking water supply systems of "Bogiston", "Sokhil" MCA of Yangikurgan district · 13 Jun 2022 · USD 44K · World Bank
- Design services for the subprojects ""Reconstruction of drinking water supply systems of "Govazon"and "Oqsuv Govazon" MCA of Yangikurgan district · 13 Jun 2022 · USD 38K · World Bank
- Design services for the subprojects ""Reconstruction of drinking water supply systems of "Madaniyat", "Poramon" MCA of Yangikurgan district · 13 Jun 2022 · USD 24K · World Bank
Method
Computed from 34 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.