Skip to main content

Contractor intelligence · computed from public award records

PEARL CONSTRUCTION

Awards won
80
Known value
USD 7.5M
First award
20 Apr 2017
Most recent
30 Dec 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank80USD 7.5M30 Dec 2025

Where the work is

LK · 80

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Improvements to Access road to Kanniyammai Anicut Navakari Scheme,Navakari Division · 29 Dec 2023 · USD 40K · World Bank
  • Construction of the 25m long damaged cantiliver wall section at stn.9+100 RB side of the EMYE main canal · 07 Dec 2023 · USD 34K · World Bank
  • Demolishing old damaged hump pipe trough at stn 0+830 & construction rectangular trough structure and rectangular canal lining stn 0+730 to stn 0+920 in Jamburewela DCFO area · 07 Dec 2023 · USD 47K · World Bank
  • Improvement to Pilayarady Anicut/Regulator in Kalvankai River,Rugam Scheme,Rugam Division · 27 Oct 2023 · USD 66K · World Bank
  • Improvements to LB Main Channel bund access road at Stn.0 + 336 in Wadamunai Scheme in Rugam Division, Baticaloa · 27 Oct 2023 · USD 84K · World Bank
  • Improvements to Peelimadu Bridge cum regulator in Vahanery Scheme, Rugam Division · 27 Oct 2023 · USD 44K · World Bank
  • Rehabilitation of Anicut No 05 & 06 Maha Ara ASC Wellawaya Divisional Secretary's Division in Monaragala District. · 19 Dec 2022 · USD 143K · World Bank
  • Rehabilitation of tank bund (1.5 km) including Rip Rap and sluice of Mahalindawewa Tank · 23 Dec 2021 · USD 238K · World Bank
  • Rehabilitation of Haththota Anicut Scheme (1st to 5th Km canal) · 10 Nov 2021 · USD 257K · World Bank
  • Rehabilititation of Haththota Anicut Scheme (6th to 10th Km canal) · 10 Nov 2021 · USD 123K · World Bank
  • Improvement to Bathalagoda main bund road ch from 0 to 1+525 · 10 Nov 2021 · USD 158K · World Bank
  • Improvements to Bathalagoda Anicut & Anicut inlet CHL road from CH0 to 3+775 · 10 Nov 2021 · USD 353K · World Bank
  • Construction of upstream and Downstream protection of Kaliodai Additional spillway in Veerayadi unit, Akkaraipattu division in Ampara Region · 15 Aug 2019 · USD 312K · World Bank
  • Construction of Addition Spillway and Downstream protection of Kaliodai anicut in Veerayadi Unit, Akkaraipattu Division, Ampara Range · 19 Sept 2018 · USD 294K · World Bank
  • CRIPAF/WORKS/ID-TRI/NCB/59 Improvements to LB/2 D6 off LB Main Channel in Allai Extension Scheme in Muthur Division, Trincomalee Region · 26 Mar 2018 · USD 220K · World Bank
  • Flood damage repairs and improvements to RB-04,15,19,17 Channels in Damana unit in Ampara Division ,Ampara · 03 Jan 2018 · USD 312K · World Bank
  • Flood damage repairs and Improvements to L.B. Main canal from stn 0+000 km to 10+000 km, Construction of Nethravil Anicut & Flood damage repairs and Improvements to LB 1A & LB 1 canals in Ampara Unit · 03 Jan 2018 · USD 156K · World Bank
  • CRIPAF/WORKS/ID-AMP/NCB/10 Flood damage repairs andImprovements to Pallakkadu Anicut, Malayadi Anicut & Kaliodai anicut with addional spillway in Veerayadi unit · 28 Sept 2017 · USD 70K · World Bank
  • Widening of Aarapaththai bridge across Nellikadu river in Block J Unit · 23 Jun 2017 · USD 43K · World Bank
  • CRIPAF/WORKS/ID-AMP/NCB/09 Improvements to Karadikkulam and Padarakkal Kulam in Deegawapi Unit · 20 Apr 2017 · USD 59K · World Bank

Method

Computed from 80 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.