Contractor intelligence · computed from public award records
PEARL CONSTRUCTION
- Awards won
- 80
- Known value
- USD 7.5M
- First award
- 20 Apr 2017
- Most recent
- 30 Dec 2025
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 80 | USD 7.5M | 30 Dec 2025 |
Where the work is
LK · 80
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Improvements to Access road to Kanniyammai Anicut Navakari Scheme,Navakari Division · 29 Dec 2023 · USD 40K · World Bank
- Construction of the 25m long damaged cantiliver wall section at stn.9+100 RB side of the EMYE main canal · 07 Dec 2023 · USD 34K · World Bank
- Demolishing old damaged hump pipe trough at stn 0+830 & construction rectangular trough structure and rectangular canal lining stn 0+730 to stn 0+920 in Jamburewela DCFO area · 07 Dec 2023 · USD 47K · World Bank
- Improvement to Pilayarady Anicut/Regulator in Kalvankai River,Rugam Scheme,Rugam Division · 27 Oct 2023 · USD 66K · World Bank
- Improvements to LB Main Channel bund access road at Stn.0 + 336 in Wadamunai Scheme in Rugam Division, Baticaloa · 27 Oct 2023 · USD 84K · World Bank
- Improvements to Peelimadu Bridge cum regulator in Vahanery Scheme, Rugam Division · 27 Oct 2023 · USD 44K · World Bank
- Rehabilitation of Anicut No 05 & 06 Maha Ara ASC Wellawaya Divisional Secretary's Division in Monaragala District. · 19 Dec 2022 · USD 143K · World Bank
- Rehabilitation of tank bund (1.5 km) including Rip Rap and sluice of Mahalindawewa Tank · 23 Dec 2021 · USD 238K · World Bank
- Rehabilitation of Haththota Anicut Scheme (1st to 5th Km canal) · 10 Nov 2021 · USD 257K · World Bank
- Rehabilititation of Haththota Anicut Scheme (6th to 10th Km canal) · 10 Nov 2021 · USD 123K · World Bank
- Improvement to Bathalagoda main bund road ch from 0 to 1+525 · 10 Nov 2021 · USD 158K · World Bank
- Improvements to Bathalagoda Anicut & Anicut inlet CHL road from CH0 to 3+775 · 10 Nov 2021 · USD 353K · World Bank
- Construction of upstream and Downstream protection of Kaliodai Additional spillway in Veerayadi unit, Akkaraipattu division in Ampara Region · 15 Aug 2019 · USD 312K · World Bank
- Construction of Addition Spillway and Downstream protection of Kaliodai anicut in Veerayadi Unit, Akkaraipattu Division, Ampara Range · 19 Sept 2018 · USD 294K · World Bank
- CRIPAF/WORKS/ID-TRI/NCB/59 Improvements to LB/2 D6 off LB Main Channel in Allai Extension Scheme in Muthur Division, Trincomalee Region · 26 Mar 2018 · USD 220K · World Bank
- Flood damage repairs and improvements to RB-04,15,19,17 Channels in Damana unit in Ampara Division ,Ampara · 03 Jan 2018 · USD 312K · World Bank
- Flood damage repairs and Improvements to L.B. Main canal from stn 0+000 km to 10+000 km, Construction of Nethravil Anicut & Flood damage repairs and Improvements to LB 1A & LB 1 canals in Ampara Unit · 03 Jan 2018 · USD 156K · World Bank
- CRIPAF/WORKS/ID-AMP/NCB/10 Flood damage repairs andImprovements to Pallakkadu Anicut, Malayadi Anicut & Kaliodai anicut with addional spillway in Veerayadi unit · 28 Sept 2017 · USD 70K · World Bank
- Widening of Aarapaththai bridge across Nellikadu river in Block J Unit · 23 Jun 2017 · USD 43K · World Bank
- CRIPAF/WORKS/ID-AMP/NCB/09 Improvements to Karadikkulam and Padarakkal Kulam in Deegawapi Unit · 20 Apr 2017 · USD 59K · World Bank
Method
Computed from 80 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.