Contractor intelligence · computed from public award records
PRECISION SURVEY CONSULTANCY
- Awards won
- 12
- Known value
- USD 197K
- First award
- 10 May 2021
- Most recent
- 26 Dec 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 12 | USD 197K | 26 Dec 2024 |
Where the work is
IN · 12
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Shifting of Height reference Datum from the new Height reference system of survey of India to RTDAS stations in West Bengal · 26 Dec 2024 · USD 16K · World Bank
- Traverse survey by using Digital Level from Amta to Arambag via Bakshi,Bandar & via Champadanga for a length of 130.438 km in connection with WBMIFMP. · 08 Aug 2024 · USD 8K · World Bank
- Bank line survey along left bank of River Rupnarayan for a length of 16.858Km in between Panseuli and Hotel Larica within District Hooghly & Howrah. · 18 Mar 2024 · USD 1K · World Bank
- Bank line survey along left bank of River Rupnarayan for a length of 16.800Km in between Outfall of Mundeswari River and Bandar within District Hooghly. · 18 Mar 2024 · USD 1K · World Bank
- Bank to Bank detailed hydrographic survey between Tribeni - Farakka stretch (Schedule A) on NW-1 under JMVP-II (Arth Ganga) · 13 Apr 2023 · USD 76K · World Bank
- Cross Section Survey of Dhansiri River at Dimapur under National Hydrology Project · 13 Oct 2022 · USD 19K · World Bank
- Topography & Cross section survey of Lower Rampur khal & Khoribon Khal of Howrah Irrigation Division under WBMIFMP. · 09 Mar 2022 · USD 3K · World Bank
- Topo & Contour Survey by using GPS system with RTK/ DGPS and hydrographic survey by using ADCP inst in Damodar from Ch. 30.60 km to Ch. 54.26 km and Hurhurah Khal incl char within Hooghly & Hwh Dist. · 08 Mar 2022 · USD 6K · World Bank
- Shifting of RL from permanent GTS location to the Gauge and water level sensor locations at different places of Sundarban and North 24 Paraganas (Majdia, Bongaon, Tipi and Taki) with river cross secti · 17 Jan 2022 · USD 26K · World Bank
- Fixation of Permanent Kilometre posts on top of right embankment of river Damodar · 13 Dec 2021 · USD 5K · World Bank
- Hydrographic & topographic survey of Kangsabati & kumari Reservoir · 03 Dec 2021 · USD 24K · World Bank
- Hydrographic & Topographic Survey of reservoir area and dams/weirs of 10(ten) nos. of Irrigation Schemes in Purulia District under NHP of I&W Deptt.,GoWB. · 10 May 2021 · USD 13K · World Bank
Method
Computed from 12 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.