PREM KUMAR

Awards won
13
Known value
USD 4.5M
First award
07 Jul 2016
Most recent
26 May 2020

Wins by funder

FunderAwardsKnown valueMost recent
World Bank13USD 4.5M26 May 2020

Where the work is

IN · 13

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Construction of T08-RAHARIYA TO MADHEPURA BORDER (Forbisganj) · 26 May 2020 · USD 2.2M · World Bank
  • Construction of MRL01-SH 65 Rangpura Teenmuhani Road To Milky Kajra (Dhamdaha) · 16 May 2020 · USD 537K · World Bank
  • Lowest Responsive Bidder is PREM KUMAR, whose price is 69627557. Construction Cost = 58532619 Maintenance Cost = 11094938 Total Cost = 69627557 · 15 May 2020 · USD 909K · World Bank
  • Lowest Responsive Bidder is PREM KUMAR, whose price is 60789279. Construction Cost = 51130067 Maintenance Cost = 9659212 Total Cost = 60789279 · 15 May 2020 · USD 794K · World Bank
  • Supply Installation of complete set Pen Culture fitting with GI Pipes under Fisheries Component · 10 May 2018 · USD 2K · World Bank
  • Reference No. : DWSS-W-DIV39-4161-1House Hold connection, minor repair and laying of pipe line at villageMangewal Block Doraha Distt Ludhiana Under Sub Comporent 2a · 27 Dec 2016 · USD 3K · World Bank
  • Providing Improved Access to waterthrough Household Connections, repairof structure i.e. water works site andwater supply pipe line in existingscheme Harion Kalan of BlockKhanna District Ludhiana · 22 Dec 2016 · USD 11K · World Bank
  • Ref. No. : DWSS-W-DIVN39-4148-1 Providing WSS Lalheri Malakpur, Blk- Khanna Providing Improved Access to water through Household Connections, repair of structure i.e. OHSR, water works · 22 Dec 2016 · USD 13K · World Bank
  • Reference No. : DWSS-W-DIV39-4156-1House Hold connection, minor repair and laying of pipe line at village Sirthala Block Doraha Distt Ludhiana Under Sub Comporent 2a · 19 Dec 2016 · USD 9K · World Bank
  • Reference No. : DWSS-W-DIV39-4160-1House Hold connection, minor repair and laying of pipe line at village Jargari Block Doraha Distt Ludhiana Under Sub Comporent 2a · 16 Dec 2016 · USD 6K · World Bank
  • WSS Purbia Colony, block & Dist Patiala: Prov. Tubewell, PVC Rising Main and Distribution System, Pumping Machinery, Pump Chamber, Disinfection unit,Construction of OHSR, Sluice Valve chamber, Househo · 06 Dec 2016 · USD 45K · World Bank
  • WSS Vill kheri manian, Block & Dist Patiala: Repair of Submersible Pumping set & OHSR, control panel,Head works, P/F chlorination Plant, water controller, households connection , PVC Pipes ,Bulk Meter · 13 Oct 2016 · USD 8K · World Bank
  • Repair OHSR, Water Works, Chlorination, Pipeline, Providing & making water connection to Household, P/F PVC Pipe 6kg/cm2 including specials, Sluice Valve and other work · 07 Jul 2016 · USD 5K · World Bank

Method

Computed from 13 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.