Contractor intelligence · computed from public award records
PT. ARKONIN ENGINEERING MANGGALA PRATAMA
- Awards won
- 14
- Known value
- USD 1.9M
- First award
- 13 Mar 2020
- Most recent
- 03 Jul 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 14 | USD 1.9M | 03 Jul 2024 |
Where the work is
ID · 14
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- PT BINA LESTARI LINGKUNGAN SEJAHTERA · 2 shared contracts
- YODYA KARYA (PERSERO) WILAYAH IV · 2 shared contracts
- PT. WASECO TIRTA · 1 shared contract
- PT. CIRIAJASA ENGINEERING CONSULTANT · 1 shared contract
- PT. POLA TEKNIK KONSULTAN · 1 shared contract
- DEKAMA SEKATA · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Development of WPI design standards (10, 50, 150 TPD), covering process units, technical drawings, SOPs, BoQ, cost estimate, and tender docs. · 03 Jul 2024 · USD 195K · World Bank
- Konsultan Manajemen Konstruksi Terintegrasi Rancang Bangun Pembangunan Tempat Pengolahan Sampah Terpadu (TPST) Kota Cilegon · 17 Nov 2023 · USD 114K · World Bank
- PROJECT PLANNING CONSULTANT FOR PUSDALOPS · 18 Oct 2023 · USD 375K · World Bank
- Supervisi Pembangunan IPLT Samosir · 14 Sept 2023 · USD 66K · World Bank
- Bantuan Teknis Penyusunan Rencana Induk Sistem Pengelolaan Sampah di Kabupaten Tuban · 04 Aug 2023 · USD 86K · World Bank
- Penyusunan Rencana Induk Sistem Pengelolaan Sampah di Kota Cilegon · 01 Aug 2023 · USD 85K · World Bank
- Supervisi Pembangunan SPAM KSPN Mandalika Tahap II Kabupaten Lombok Tengah · 25 Jul 2023 · USD 55K · World Bank
- Supervisi Pembangunan TPA Samosir · 21 Jun 2023 · USD 50K · World Bank
- Penyusunan Studi Kelayakan (Feasibility Sudy) dan Rancangan Awal (Basic Design) Tempat Pengolahan Sampah Terpadu (TPST) Kota Depok, Kota Bandung, Kabupaten Indramayu dan Kabupaten Cianjur · 16 May 2023 · USD 82K · World Bank
- Supervisi Pembangunan Gedung Tower dan Pengadaan/Instalasi Radar Cuaca X-Band dan Pendukung Lainnya · 09 Jan 2023 · USD 76K · World Bank
- Supervisi Pembangunan SPAM Berbah Mendukung KSPN BYP · 21 Dec 2022 · USD 134K · World Bank
- Procurement Of Construction Management Consultant Services Inatews Operational System Development (Building) · 28 Oct 2022 · USD 284K · World Bank
- the CSC of NUWSP that will advise and assist Provincial Project Implementing Unit (PPIU) in monitoring, supervising, managing, and controlling the construction work of NUWSP implementation · 29 Oct 2021 · USD 217K · World Bank
- Contract no: PPJ-019/SMI/0320 dated 13 March 2020 · 13 Mar 2020 · USD 43K · World Bank
Method
Computed from 14 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.