Contractor intelligence · computed from public award records
RAVINDER KUMAR
- Awards won
- 32
- Known value
- USD 286K
- First award
- 17 Aug 2016
- Most recent
- 01 Sept 2025
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 32 | USD 286K | 01 Sept 2025 |
Where the work is
IN · 32
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- 26.Construction of Community Water Harvesting Structure under (Primary Water Harvesting & Storage) · 23 Dec 2021 · USD 2K · World Bank
- 7.Construction of Sub Surface Dykes (Mackhowal) under (Primary Water Harvesting and Storage Structure) · 22 Dec 2021 · USD 5K · World Bank
- 1.Construction of Cement Concrete Check Barriers under Treatment of Drainage Line (Soil Conservation Works) · 22 Dec 2021 · USD 6K · World Bank
- Construction of OHSR, Pump Chamber, P/F new machinery, Development of water works, distribution system and HH connection at W/S Scheme Sherpur Gidderpur, Block Gharota, Distt. Pathankot. · 09 Sept 2021 · USD 61K · World Bank
- Construction of OHSR, Pump Chamber, Prov. & Installing Machinery, Development of W/W, Distribution system and House Hold Connection At WSS Papial, Block Gharota, Distt. Pathankot. (Pkg-2 C/W) · 10 Jun 2021 · USD 56K · World Bank
- 7. Construction of ponds (manual excavation) at different locations (3 APO units) in two phases i.e. during December 2020(20 ponds) and may 2021. · 05 Feb 2021 · USD 2K · World Bank
- Construction of pump chamber, OHSR, Development of water works & distribution system at wss Jhanjeli Nihalpur Block Sujanpur, Distt. Pathankot (Pkg-2 C/W) · 05 Nov 2020 · USD 46K · World Bank
- Fencing of plantation area with wooden fence post and barbed wire(400 plants per/ha) · 27 Jul 2020 · USD 6K · World Bank
- Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal Pradesh · 27 Jul 2020 · USD 6K · World Bank
- COMPARASION OF JOB NO. 2 PREPARED · 13 Mar 2020 · USD 5K · World Bank
- Eradication of Lantana Weeds · 12 Feb 2020 · USD 6K · World Bank
- Site Development for Nursery at Bari & Karloti under APO Ghumarwin · 12 Feb 2020 · USD 2K · World Bank
- Providing, Laying, Jointing, Fixing & Testing of PVC pipes, Sluice Valve, S/V Chamber, Making Connection, & painting M.S. Sign Board etc at village Bani Lodhi Block Sujanpur, Distt. Pathankot (Under W · 18 Apr 2017 · USD 2K · World Bank
- Prov. laying, jointing, fixing G.I. pipe line, Gun Metal, Brick paving, Restoration of cement concrete, Disinfection Unit & household connection vill. kathana block N.J. Singh distt. pathankot. · 03 Jan 2017 · USD 7K · World Bank
- Providing, Laying, fixing & jointing of PVC Pipe, Sluice Valve, S/V Chamber, Disinfection unit, water meter and house hold connection at Vill. Chack Mansinghpur Block N.J. Singh Distt. Pathankot · 03 Jan 2017 · USD 13K · World Bank
- Providing, Painting and writing of M.S. sign board & Household connection at village Killpur Block Narot jaimal Singh Distt. Pathankot (Under World Bank Project sub component 2B) · 21 Sept 2016 · USD 2K · World Bank
- Providing, painting and writing of M.S. sign board & Household connection at village Kohlian Block N.J. Singh, Distt. Pathankot (Under World Bank Project Sub Component 2b) · 21 Sept 2016 · USD 1K · World Bank
- Providing, Laying, Jointing, Fixing & Testing of PVC pipes & Providing & fixing Household connection etc at village Akhrota Block Pathankot, Distt. Pathankot (Under World Bank Project Sub Component 2b · 15 Sept 2016 · USD 669 · World Bank
- Providing, Laying, Jointing, Fixing & Testing of PVC pipes, Disinfection Unit, M.S. Painting Sign Board, Household connection & Bulk Meter etc at village Panjore Block Sujanpur, Distt. Pathankot (Unde · 01 Sept 2016 · USD 5K · World Bank
- Providing, Laying, Jointing, Fixing & Testing of PVC pipes, Providing and fixing Household connection etc at village Wadala Block Pathankot, Distt. Pathankot · 17 Aug 2016 · USD 1K · World Bank
Method
Computed from 32 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.