Contractor intelligence · computed from public award records
SAFEGE
- Awards won
- 30
- Known value
- USD 24.6M
- First award
- 31 Aug 2000
- Most recent
- 17 May 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 26 | USD 23.5M | 17 May 2024 |
| Inter-American Development Bank | 4 | USD 1.1M | 01 Nov 2018 |
Where the work is
HT · 3TR · 3GE · 2TT · 1LK · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- OPTIMAL · 3 shared contracts
- SPEA ENGINEERING S.P.A · 1 shared contract
- SAFEGE D.O.O. · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Technical Control of Designs and Supervision Services for Improvement of Railway Level Crossings · 17 May 2024 · USD 1.3M · World Bank
- Port-au-Prince Water and Sanitation Project II · 01 Nov 2018 · USD 301K · Inter-American Development Bank
- Port-au-Prince Water and Sanitation Project II · 01 Nov 2018 · USD 252K · Inter-American Development Bank
- Preparation of Main Design for Heavy Maintenance (Road Rehabilitation-Upgrading) of the State Road IB 21, Section: Po ega Ivanjica, L=40.340 km · 01 Jun 2017 · USD 93K · World Bank
- Make appropriate amendments/update to the Strategic Environmental Assessment of the Waste Management Plan of the Republic of Croatia . · 03 Jun 2016 · USD 32K · World Bank
- Consulting Services for Preparation of Main Design for Heavy Maintenance (Road Rehabilitation-Upgrading) of the State Road IA 3 Sect ion: Border CRO/SER (Batrovci) - Kuzmin 1 (highway) (full profile) · 25 Apr 2016 · USD 235K · World Bank
- Consulting Services for Preparation of Main Design for Heavy Maintenance (Road Rehabilitation-Upgrading) of the State Road IB 35 Sec tion: Kladovo - Brza Palanka L=23.565 km · 25 Apr 2016 · USD 289K · World Bank
- Preparation of Main Design for Heavy Maintenance of the State Road IB35 Section Kladovo - Bela Palanka L 23.565km · 25 Apr 2016 · USD 247K · World Bank
- Consulting Services for preparation of Main Design, Heavy Maintenance IA3 BATROVCI-KUZMIN · 25 Apr 2016 · USD 210K · World Bank
- Pre-contract services and Construction Supervision for Reconstruction of Wastewater and Sludge Treatment Facilities in the City of K harkiv · 11 Mar 2016 · USD 3.7M · World Bank
- Supervision for Flood Protection Works under Floods Emergency Recovery Project · 16 Dec 2015 · USD 1.6M · World Bank
- Expertise préalable à l'Etablissement d'un Guide Méthodologique des Etudes Hydrauliques en Haiti · 25 Aug 2015 · USD 58K · World Bank
- PREPARATION OF THE FEASIBILITY STUDY FOR EU CO-FINANCING OF REMEDIATION DIKLO LANDFILL WITH LEACHATE CAPTURE AND LEACHATE TREATMENT PLAN · 08 May 2015 · USD 353K · World Bank
- Multi-Phase Wastewater Rehabilitation Program- Phase I · 23 Dec 2014 · USD 560K · Inter-American Development Bank
- Preparation of design documentation for water utility facilities and Studies for application for EU funds for the area of city of Pu la · 13 Oct 2014 · USD 1.2M · World Bank
- RECRUTEMENT D' UN BUREAU D' ETUDES POUR LA REVISION ET L' ACHEVEMENT DE LA DEFINITION D' UN MECANISME DE PAIEMENT DES CONSOMMATIONS D' EAU DES ORGANISMES PUBLICS FACTURES PAR LA STE · 06 Jun 2014 · USD 21K · World Bank
- REVISION & COMPLETION BY "STE" OF A PAYMENT MECHANISM OF PUBLIC ORGANIZATIONS' WATER CONSUMPTION INVOICES · 06 Jun 2014 · USD 21K · World Bank
- MISE A JOUR DU SHEMA DIRECTEUR D' ALIMENTATION EN EAU POTABLE DE LA VILLE DE NDJAMENA, ETUDE TARIFAIRE ET COUT DE BRANCHEMENTS · 26 Mar 2013 · USD 292K · World Bank
- Drinking Water and Sanitation Sector Reform · 19 Apr 2011 · USD 20K · Inter-American Development Bank
- Project Supervision Services for Design and Build Contract for Construction of Sanitary Landfill "Mozura" in Bar, Montenegro · 11 Feb 2011 · USD 575K · World Bank
- N'DJAMINA WATER DISTRIBUTION MASTERPLAN INCLUDING TARIFF STUDY (ETUDE D'ELABORATION DU SCHEMA DIRECTEUR DU RESEAU DE DISTRIBUTION D' · 18 Oct 2006 · USD 401K · World Bank
- STUDY ON WATER SUPPLY ON PRECARIOUS EREA OF NOUAKCHOTT · 21 Sept 2001 · USD 250K · World Bank
- CONSULTANCY SERVICES FOR ENGINEERING STUDIES - LILONGWE WATER BOARD · 02 May 2001 · USD 414K · World Bank
- FEASIBILITY STUDY AND DETAILED DESIGN FOR POCHENTONG AIRPORT AREA · 31 Aug 2000 · USD 100K · World Bank
Method
Computed from 30 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.