Contractor intelligence · computed from public award records
SETEC HYDRATEC
- Awards won
- 5
- Known value
- USD 793K
- First award
- 04 Mar 2021
- Most recent
- 15 Mar 2023
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 5 | USD 793K | 15 Mar 2023 |
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- TERRABO INGENIEUR CONSEIL · 4 shared contracts
- SETEC CI · 2 shared contracts
- SETEC · 1 shared contract
- GROUPEMENT TERRABO-INGÉNIEUR CONSEIL/SETEC AFRIQUE · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- SUIVI ET CONTRÔLE DES TRAVAUX D'ADDUCTION EN EAU POTABLE ET DE CONSTRUCTION DE BLOCS DE LATRINES DANS LES ÉCOLES ET CENTRES DE SANTÉ SÉLECTIONNES DE LA VILLE DE BINGERVILLE · 15 Mar 2023 · USD 144K · World Bank
- Selection d'une entreprise pour le suivi et le contrôle des travaux de construction des ouvrages de drainages des eaux pluviales de Grand-Bassam · 10 Feb 2023 · USD 247K · World Bank
- ETUDES TECHNIQUES D'AVANT-PROJET DETAILLE POUR LA SECURISATIOB DE LA RESSOURCE EN EAU BRUTE DES VILLES DE KORHOGO ET FERKESSEDOUGOU · 10 Mar 2021 · USD 91K · World Bank
- ETUDES D’AVANT-PROJET DÉTAILLÉ (APD) POUR LE RENFORCEMENT DE L’ALIMENTATION EN EAU POTABLE DE LA VILLE DE NIAKARA ET DES LOCALITÉS ENVIRONNANTES · 08 Mar 2021 · USD 133K · World Bank
- RÉALISATION DES ÉTUDES TECHNIQUES POUR LE RENFORCEMENT DE L'ALIMENTATION EN EAU POTABLE DES VILLES DE ISSIA, ZUENOULA ET VAVOUA · 04 Mar 2021 · USD 178K · World Bank
Method
Computed from 5 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.