Skip to main content

Contractor intelligence · computed from public award records

SEURECA

Awards won
24
Known value
USD 18.8M
First award
04 Mar 2010
Most recent
01 Dec 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank24USD 18.8M01 Dec 2025

Where the work is

AO · 3KE · 2KG · 2BI · 1GM · 1MZ · 1NE · 1TZ · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Procurement of Consultancy for Financial Framework Review · 01 Dec 2025 · USD 199K · World Bank
  • Consultancy Services for The Analysis of Alternatives To Subsidize Low Income Population And Identification of Potential Beneficiaries · 04 Nov 2025 · USD 356K · World Bank
  • RECRUTEMENT D’UN CONSULTANT/ BUREAU CHARGE DE LA REDACTION DU CONTRAT DE PERFORMANCE ENTRE LA REGIDESO ET L’ETAT DU BURUNDI · 26 Dec 2024 · USD 171K · World Bank
  • CONSULTANCY SERVICES FOR DEVELOPMENT OF A NATIONAL SANITATION STRATEGY (Urban and Rural Areas) · 08 Aug 2024 · USD 341K · World Bank
  • Consultancy Services For Design Checking And Works Supervision Of The Construction Of A Distribution Network And Household Connections In The City Of Malanje – Lot 2 132CS3/MALANJE/UCP/22 · 13 Jun 2024 · USD 716K · World Bank
  • Assessment of Energy Efficiency, Load Management and Renewable Energy Options · 25 Jun 2021 · USD 58K · World Bank
  • Consultant Assignment to Prepare the Tender Documents for Vostok Transmission Line and to Assist in Project Implementation · 12 Feb 2018 · USD 133K · World Bank
  • Consultancy Services for Design and Construction Supervision of Lunga Lunga, Mwasambeni, Kwale and Ukunda Water Supply Rehabilitation and Expansion Work- Stage I- Lump Sum Contract · 26 May 2017 · USD 692K · World Bank
  • Consultancy Services for Design and Construction Supervision of Lunga Lunga, Mwasambeni, Kwale and Ukunda Water Supply Rehabilitation and Expansion Work- Stage II Time Based Contract · 26 May 2017 · USD 602K · World Bank
  • Operation and Management of N'Dalatando Water Supply System · 08 Jun 2015 · USD 4.3M · World Bank
  • ADDITIONAL MANAGEMENT SUPPORT TO EAGB (APPUI A LA GESTION COMPLEMENTAIRE D'UNE ANNEE A EAGB) · 21 May 2015 · USD 455K · World Bank
  • APPUI A LA GESTION COMPLEMENTAIRE D'UNE ANNEE A EAGB · 21 May 2015 · USD 450K · World Bank
  • MISSION D'ELABORATION DES PLANS DIRECTEURS D'ASSAINISSEMENT DES EAUX USEES DE LA CONURBATION DE COTONOU, ABOMEY-CALAVI, SEME-PODJI ET DE LA VILLE DE PORTO-NOVO · 20 Jan 2014 · USD 1.1M · World Bank
  • TECHNICAL ASSISTANCE TO EAGB MANAGEMENT (APPUI A LA GESTION D'EAGB) · 25 Nov 2013 · USD 946K · World Bank
  • Preparation of the feasibility study for Ulaanbaatar district heating supply improvement, Mongolia · 23 Sept 2013 · USD 797K · World Bank
  • Preparation of Feasibility Study of WWTP in Tskaltubo Town, Imereti Region, Georgia · 23 Apr 2013 · USD 120K · World Bank
  • Design Checking of Water Network and Home Connections for Huambo · 02 Feb 2012 · USD 116K · World Bank
  • Works Supervision of Water Network and Home Connections for Huambo · 02 Feb 2012 · USD 1.8M · World Bank
  • IMPLEMENTATION OF THE COMMUNICATION PLAN ON THE WATER SECTOR REFORM AND THE REINFORCEMENT PLAN OF REGIDESO CAPACITIES IN THE COMMUNICATION AREA · 30 May 2010 · USD 371K · World Bank
  • RECRUTEMENT D UN CONSULTANT POUR ASSISTANCE TECHNIQUE A LA CAMWATER · 04 Mar 2010 · USD 383K · World Bank

Method

Computed from 24 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.