Skip to main content

Contractor intelligence · computed from public award records

SGI INGENIERIE SA

Awards won
18
Known value
USD 10.6M
First award
27 Dec 2001
Most recent
12 Dec 2024

Wins by funder

FunderAwardsKnown valueMost recent
World Bank18USD 10.6M12 Dec 2024

Where the work is

TZ · 2ET · 1SN · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Consulting Services for the Study and Preparation of a Comprehensive Framework for Sustainable Groundwater Resources Development, Abstraction Management and Groundwater Modeling Study. · 12 Dec 2024 · USD 580K · World Bank
  • Etudes hydrogéologiques, études d'APS, d’APD et Elaboration du DAO pour les systèmes d'alimentation en eau potable des sites prioritaires des provinces du Kasaï Central et du Kasaï Oriental · 30 Aug 2024 · USD 737K · World Bank
  • Consultancy Services for design Review, Feasibility Study, Updated Landscape and Engineering Designs, Preparation of Environmental and Social Safeguards Documents, and Construction Supervision of Two · 07 Jun 2024 · USD 1.2M · World Bank
  • SECTORISATION · 20 Mar 2024 · USD 197K · World Bank
  • Provision of Consultancy Services for Construction Supervision for Water Loss Reduction Contract in Dar es Salaam · 23 Dec 2022 · USD 95K · World Bank
  • AVENANT CONTRAT - MODELISATION ET MISE EN PLACE D'UN PROGRAMME DE REDUCTION DES PERTES EN EAU DU RESEAU D'AEP DE LA VILLE DE BUJUMBURA · 27 Dec 2012 · USD 79K · World Bank
  • WORK CONSTRUCTION SUPERVISION OF 700M3POTABLE WATER RESERVOIR (SUPERVISION, CONTROLE DES TRAVAUX DE LA CONSTRUCTION D'UN RESERVOIR D'EAU POTABLE DE 700M3) · 08 Feb 2011 · USD 219K · World Bank
  • MONITORING AND SUPERVISION OF WATER SUPPLY WORKS IN MATADI · 09 Nov 2010 · USD 1.5M · World Bank
  • "MODELISATION" STUDY AND SET-UP OF A REDUCTION PROGRAM FOR WATER LOSSES OF THE "AEP" NETWORK OF THE CITY OF BUJUMBURA · 02 Jun 2010 · USD 588K · World Bank
  • MONITORING OF THE WORK OF THE SLOW FILTER AT THE WATER FACTORY OF THE REGIDESO'S LAKE IN BUJUMBURA · 17 Aug 2009 · USD 240K · World Bank
  • SUPERVISION OF WORKS FOR POTABLE WATER SUPPLY TO THE CITY OF BISSAU · 30 Sept 2007 · USD 373K · World Bank
  • SUPERVISION OF ROAD CONSTRUCTION WORK ON FIGUEIRA - ALCATRAZ ROAD · 18 Nov 2005 · USD 672K · World Bank
  • CONTROL AND SUPERVISION OF ROAD CONSTRUCTION IN PIKINE · 10 Nov 2004 · USD 379K · World Bank
  • ETUDE D'ACTUALISATION DU PROG. DE RENFORCEMENT DES INSTALLATIONS DE PRODUCTION ET DISTRIBUTION D'EAU · 16 Sept 2004 · USD 146K · World Bank
  • CONSULTANCY SERVICES FOR UPDATING WASTE DRAINAGE SYSTEM PLAN · 04 Dec 2003 · USD 1.4M · World Bank
  • WORKS SUPERVISION IN DOSSO - TAHOUA · 20 Feb 2003 · USD 294K · World Bank
  • SUPERVISION OF WORKS · 26 May 2002 · USD 1.2M · World Bank
  • CONTROLE & SUPERVISION OF REHABILITATION WORKS OF THE STEP OF CAMBERENE · 27 Dec 2001 · USD 647K · World Bank

Method

Computed from 18 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.