Contractor intelligence · computed from public award records
SGI INGENIERIE SA
- Awards won
- 18
- Known value
- USD 10.6M
- First award
- 27 Dec 2001
- Most recent
- 12 Dec 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 18 | USD 10.6M | 12 Dec 2024 |
Where the work is
TZ · 2ET · 1SN · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- SGI SENEGAL SARL · 1 shared contract
- VSI AFRIQUE · 1 shared contract
- SGI CONSULTING ENGINEERS LTD · 1 shared contract
- ALMADIUS SRL · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Consulting Services for the Study and Preparation of a Comprehensive Framework for Sustainable Groundwater Resources Development, Abstraction Management and Groundwater Modeling Study. · 12 Dec 2024 · USD 580K · World Bank
- Etudes hydrogéologiques, études d'APS, d’APD et Elaboration du DAO pour les systèmes d'alimentation en eau potable des sites prioritaires des provinces du Kasaï Central et du Kasaï Oriental · 30 Aug 2024 · USD 737K · World Bank
- Consultancy Services for design Review, Feasibility Study, Updated Landscape and Engineering Designs, Preparation of Environmental and Social Safeguards Documents, and Construction Supervision of Two · 07 Jun 2024 · USD 1.2M · World Bank
- SECTORISATION · 20 Mar 2024 · USD 197K · World Bank
- Provision of Consultancy Services for Construction Supervision for Water Loss Reduction Contract in Dar es Salaam · 23 Dec 2022 · USD 95K · World Bank
- AVENANT CONTRAT - MODELISATION ET MISE EN PLACE D'UN PROGRAMME DE REDUCTION DES PERTES EN EAU DU RESEAU D'AEP DE LA VILLE DE BUJUMBURA · 27 Dec 2012 · USD 79K · World Bank
- WORK CONSTRUCTION SUPERVISION OF 700M3POTABLE WATER RESERVOIR (SUPERVISION, CONTROLE DES TRAVAUX DE LA CONSTRUCTION D'UN RESERVOIR D'EAU POTABLE DE 700M3) · 08 Feb 2011 · USD 219K · World Bank
- MONITORING AND SUPERVISION OF WATER SUPPLY WORKS IN MATADI · 09 Nov 2010 · USD 1.5M · World Bank
- "MODELISATION" STUDY AND SET-UP OF A REDUCTION PROGRAM FOR WATER LOSSES OF THE "AEP" NETWORK OF THE CITY OF BUJUMBURA · 02 Jun 2010 · USD 588K · World Bank
- MONITORING OF THE WORK OF THE SLOW FILTER AT THE WATER FACTORY OF THE REGIDESO'S LAKE IN BUJUMBURA · 17 Aug 2009 · USD 240K · World Bank
- SUPERVISION OF WORKS FOR POTABLE WATER SUPPLY TO THE CITY OF BISSAU · 30 Sept 2007 · USD 373K · World Bank
- SUPERVISION OF ROAD CONSTRUCTION WORK ON FIGUEIRA - ALCATRAZ ROAD · 18 Nov 2005 · USD 672K · World Bank
- CONTROL AND SUPERVISION OF ROAD CONSTRUCTION IN PIKINE · 10 Nov 2004 · USD 379K · World Bank
- ETUDE D'ACTUALISATION DU PROG. DE RENFORCEMENT DES INSTALLATIONS DE PRODUCTION ET DISTRIBUTION D'EAU · 16 Sept 2004 · USD 146K · World Bank
- CONSULTANCY SERVICES FOR UPDATING WASTE DRAINAGE SYSTEM PLAN · 04 Dec 2003 · USD 1.4M · World Bank
- WORKS SUPERVISION IN DOSSO - TAHOUA · 20 Feb 2003 · USD 294K · World Bank
- SUPERVISION OF WORKS · 26 May 2002 · USD 1.2M · World Bank
- CONTROLE & SUPERVISION OF REHABILITATION WORKS OF THE STEP OF CAMBERENE · 27 Dec 2001 · USD 647K · World Bank
Method
Computed from 18 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.