Skip to main content

Contractor intelligence · computed from public award records

STUDIO GALLI INGEGNERIA (SGI)

Awards won
10
Known value
USD 7.2M
First award
01 Mar 2010
Most recent
31 Oct 2023

Wins by funder

FunderAwardsKnown valueMost recent
World Bank10USD 7.2M31 Oct 2023

Where the work is

KE · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • INFRASTRUCTURE UPGRADING PLANS, DETAILED ENGINEERING DESIGNS, PREPARATION OF PROCUREMENT DOCUMENTS AND CONSTRUCTION SUPERVISION OF INFRASTRUCTURE IMPROVEMENT WORKS · 31 Oct 2023 · USD 1.1M · World Bank
  • Contract for Provision of Consultancy Services for Updating of the Kampala Drainage Master Plan. · 22 May 2015 · USD 1.6M · World Bank
  • CONSULTANCY SERVICES FOR DEVELOPMENT OF CATCHMENT/WATER SOURCE PROTECTION PLANS FOR THE WATER SUPPLY IN SMALL TOWNS LOT 2: RUKUNGIRI, KATWE-KABATORO AND KOBOKO · 20 May 2015 · USD 139K · World Bank
  • Comprehensive Situation Assessment and Preparation of a Water Management Zone (WMZ) Strategy and Action Plan for Upper Nile WMZ · 12 Mar 2015 · USD 777K · World Bank
  • Consultancy Services for Preparation of Two (2) Catchment Water Resources Development and Management Plans in Upper Nile Management Zone · 12 Mar 2015 · USD 883K · World Bank
  • Design Review, Feasibility Study, Detailed Engineering Design and Construction Supervision of the Small Towns Lot II: Rukungiri, Katwe-Kabatoro & Koboko · 20 Feb 2014 · USD 905K · World Bank
  • Time Based Contract: Design Review, Feasibility Study, Detailed Engineering Design And Construction Supervision Of The Small Towns Lot II: Rukungiri, Katwe-Kabatoro & Koboko · 20 Feb 2014 · USD 1.1M · World Bank
  • Etudes detaillees exectuion elaboration DAO supervision et controle travaux de construction station de traitement des boues de vidange ville de Niamey · 15 Jan 2014 · USD 231K · World Bank
  • STUDY FOR DEVELOPMENT OF MASTER PLAN FOR WASTEWATER TREATMENT OF JOAL · 29 Dec 2010 · USD 281K · World Bank
  • Water Supply System in Badawa Quarter # Erbil Governorate # Kurdistan Region # Construction Supervision · 01 Mar 2010 · USD 306K · World Bank

Method

Computed from 10 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.