Contractor intelligence · computed from public award records
STUDIO GALLI INGEGNERIA (SGI)
- Awards won
- 10
- Known value
- USD 7.2M
- First award
- 01 Mar 2010
- Most recent
- 31 Oct 2023
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 10 | USD 7.2M | 31 Oct 2023 |
Where the work is
KE · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- EAST AFRICAN ENGINEERING CONSULTANTS LTD · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- INFRASTRUCTURE UPGRADING PLANS, DETAILED ENGINEERING DESIGNS, PREPARATION OF PROCUREMENT DOCUMENTS AND CONSTRUCTION SUPERVISION OF INFRASTRUCTURE IMPROVEMENT WORKS · 31 Oct 2023 · USD 1.1M · World Bank
- Contract for Provision of Consultancy Services for Updating of the Kampala Drainage Master Plan. · 22 May 2015 · USD 1.6M · World Bank
- CONSULTANCY SERVICES FOR DEVELOPMENT OF CATCHMENT/WATER SOURCE PROTECTION PLANS FOR THE WATER SUPPLY IN SMALL TOWNS LOT 2: RUKUNGIRI, KATWE-KABATORO AND KOBOKO · 20 May 2015 · USD 139K · World Bank
- Comprehensive Situation Assessment and Preparation of a Water Management Zone (WMZ) Strategy and Action Plan for Upper Nile WMZ · 12 Mar 2015 · USD 777K · World Bank
- Consultancy Services for Preparation of Two (2) Catchment Water Resources Development and Management Plans in Upper Nile Management Zone · 12 Mar 2015 · USD 883K · World Bank
- Design Review, Feasibility Study, Detailed Engineering Design and Construction Supervision of the Small Towns Lot II: Rukungiri, Katwe-Kabatoro & Koboko · 20 Feb 2014 · USD 905K · World Bank
- Time Based Contract: Design Review, Feasibility Study, Detailed Engineering Design And Construction Supervision Of The Small Towns Lot II: Rukungiri, Katwe-Kabatoro & Koboko · 20 Feb 2014 · USD 1.1M · World Bank
- Etudes detaillees exectuion elaboration DAO supervision et controle travaux de construction station de traitement des boues de vidange ville de Niamey · 15 Jan 2014 · USD 231K · World Bank
- STUDY FOR DEVELOPMENT OF MASTER PLAN FOR WASTEWATER TREATMENT OF JOAL · 29 Dec 2010 · USD 281K · World Bank
- Water Supply System in Badawa Quarter # Erbil Governorate # Kurdistan Region # Construction Supervision · 01 Mar 2010 · USD 306K · World Bank
Method
Computed from 10 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.