Skip to main content

Contractor intelligence · computed from public award records

STUDIO PIETRANGELI (SP)

Awards won
9
Known value
USD 10.5M
First award
09 Feb 2021
Most recent
06 Jun 2024

Wins by funder

FunderAwardsKnown valueMost recent
World Bank9USD 10.5M06 Jun 2024

Where the work is

MW · 2AO · 1BT · 1CM · 1TZ · 1XK · 1

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Consulting firm to carry out feasibility study for the expansion of the Network (Eastern connection to Northern) · 06 Jun 2024 · USD 1.7M · World Bank
  • Construction Supervision of Temporary Intake/Conveyance · 24 Jan 2024 · USD 2.2M · World Bank
  • Design of Temporary Conveyance · 24 Jan 2024 · USD 194K · World Bank
  • Reservoir in The Kike-Kremenata System / Phase 1: Site investigations and Basic Design.- FLOW-CS-QCBS-06 . · 30 Oct 2023 · USD 820K · World Bank
  • Consultancy Services to Undertake EAPP Operational Readiness Phase II Study · 03 Aug 2023 · USD 520K · World Bank
  • RFP for Consultancy Services for Technical Advisory Services for Update of Detailed Project Report of Dorjilung Hydropower Project · 29 Dec 2022 · USD 1.3M · World Bank
  • Basin-Wide Dam Inventory and Development of dam Safety Risk Management Framework · 07 Jun 2022 · USD 417K · World Bank
  • FEASIBILITY STUDY AND PREPARATION OF BIDDING DOCUMENTS · 05 Mar 2021 · USD 1.7M · World Bank
  • ETUDE D’OPTIMISATION DE LA MISE EN VALEUR DU POTENTIEL HYDROELECTRIQUE DU BASSIN VERSANT DE LA SANAGA · 09 Feb 2021 · USD 1.6M · World Bank

Method

Computed from 9 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.