Skip to main content

Contractor intelligence · computed from public award records

SU-YAPI ENGINEERING AND CONSULTING INC.

Awards won
16
Known value
USD 30.5M
First award
07 May 2001
Most recent
18 Oct 2023

Wins by funder

FunderAwardsKnown valueMost recent
World Bank16USD 30.5M18 Oct 2023

Where the work is

GE · 2KG · 2TR · 2LB · 1UA · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Preparation of Detailed Design, Assistance in procurement and Supervision of civil works (Lump Sum) · 18 Oct 2023 · USD 2.1M · World Bank
  • Construction supervision and quality control - Time Based · 18 Oct 2023 · USD 1.2M · World Bank
  • Supervision of sewage network to connect to the Anjar WWTP · 15 Nov 2021 · USD 576K · World Bank
  • CONSTRUCTION SUPERVISION SERVICES FOR KVEMO SAMGORI, TBISI-KUMISI AND ZEDA RU IRRIGATION SYSTEM'S SECONDARY AND TERTIARY NETWORK TO BE IMPLEMENTED UNDER IRRIGATION AND LAND MARKET DEVELOPMENT PROJECT · 31 Jan 2019 · USD 2.7M · World Bank
  • Preparation of Detailed Engineering Design for Kvemo Samgori, Tbisi-Kumisi and Zeda Ru irrigation system's secondary and tertiary network - Irrigation and Drainag · 31 Jan 2019 · USD 1.2M · World Bank
  • Construction Supervision Services for Sewerage Project · 20 Sept 2018 · USD 3.3M · World Bank
  • Design, Review of Final Designs, Preparation of Tender Documents for Sewerage Project · 20 Sept 2018 · USD 792K · World Bank
  • procurement and project management consultant services Project "Reconstruction, capital repairs and technical re-equipping of the main gas pipeline Urengoy - Pomary - Uzhgorod" · 10 Jul 2017 · USD 1.0M · World Bank
  • Procurement and Project Management Consultant Services - Project Reconstruction, capital repairs and technical re-equipping of the m ain gas pipeline Urengoy - Pomary - Uzhgorod · 16 May 2016 · USD 851K · World Bank
  • Design & Supervision of On-farm Infrastructure Rehabilitation · 27 Mar 2012 · USD 13.5M · World Bank
  • Preparation of 12 rayons' WSS feasibility studies · 27 Aug 2009 · USD 2.6M · World Bank
  • SUPERVISION OF THE REPARIR AND IMPROVMENT OF FLOOD PROTECTION INFRASTRUCTURE IN WEST BLACK SEA FLOOD REGION · 17 Apr 2002 · USD 119K · World Bank
  • SUPERVISION OF THE REPAIR AND IMPROVEMENT FLOOD PROTECTION INFRASTRUCTURE IN WEST BLACK SEA FLOOD REGION · 17 Apr 2002 · USD 119K · World Bank
  • SUPERVISION OF THE REPAIR AND IMPROVEMENT OF FLOOD PROTECTION INFRASTRUCTURE IN WEST BLACK SEA FLOOD REGION · 17 Apr 2002 · USD 115K · World Bank
  • SUPERVISION OF THE REPAIR AND IMPRVEMENT OF FLOOD PROTECTION INFRASTRUCTURE IN WEST BLACK SEA FLOOD REGION · 17 Apr 2002 · USD 115K · World Bank
  • CONSULTING SERVICES -RURAL POLICY FOR ADCP PROJECT · 07 May 2001 · USD 150K · World Bank

Method

Computed from 16 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.