Contractor intelligence · computed from public award records
SWECO INTERNATIONAL AB
- Awards won
- 19
- Known value
- USD 14.5M
- First award
- 01 Apr 2004
- Most recent
- 30 Oct 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 19 | USD 14.5M | 30 Oct 2024 |
Where the work is
TZ · 2BW · 1KE · 1KG · 1ZM · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- WELLFIELD CONSULTING SERVICES PTY. LTD. · 1 shared contract
- CHALMERS UNIVERSITY OF TECHNOLOGY · 1 shared contract
- LLC EXPERTIZA AND TECHNICHESKIY NADZOR (KYRGYZSTAN) · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- CONSULTING SERVICES FOR THE DESIGN, PREPARATION OF BIDDING DOCUMENTS, TENDER MANAGEMENT, IMPLEMENTATION SUPERVISION, AND DEFECT LIABILITY PERIOD OBSERVATION FOR THE ZTIP · 30 Oct 2024 · USD 3.3M · World Bank
- Construction Supervision of Implementation of Energy Efficiency and Seismic Safety Measures (part B "Performance of post construction tasks ") · 01 Feb 2024 · USD 3K · World Bank
- Consultancy services for Ecological Impact assessment of downstream risks and impacts of Mwache Multi-purpose dam project · 06 Apr 2022 · USD 635K · World Bank
- Review and Upgrade of Feasibility Study and Undertake Conceptual Design for Mbeya- Tunduma- Sumbawanga Section and Preparation of EPC Bidding Documents for the Proposed Iringa-Kisada-Mbeya-Tunduma-Sum · 04 Jan 2020 · USD 607K · World Bank
- Technical Evaluation for the study on Managed Aquifer Recharge at Palla Road Wellfield · 28 Oct 2019 · USD 342K · World Bank
- Provision of consultancy services for review of feasibility study and undertaking of conceptual design of the Mbeya-Tunduma-Sumbawanga Section of the proposed Iringa-Kisada-Mbeya-Tunduma-Sumbawanga · 12 Feb 2018 · USD 394K · World Bank
- Technical Assistance for Identification of Near-term Priority Investments and Preparation of their Technical Specifications and Tender Documents · 27 Feb 2012 · USD 515K · World Bank
- Supervision of works for grid extension and intensification · 25 Oct 2011 · USD 1.7M · World Bank
- Supervision of work on Construction of Phase 0 of the Wastewater Treatment Plant Zivinice · 07 Oct 2011 · USD 141K · World Bank
- Consultancy services for implementation support for the design and construction of grid based rural electrification schemes · 09 Aug 2011 · USD 2.7M · World Bank
- CONTRACT FOR CONSULTING SERVICES FOR STRENGTHENING DAM SAFETY MANAGEMENT · 13 Nov 2009 · USD 185K · World Bank
- S-2: Consultancy Services for Water Quality & Industrial Pollution Monitoring System · 30 Sept 2009 · USD 414K · World Bank
- Preparation of specifications and supervision og introduction of water disinfection system · 12 Aug 2009 · USD 130K · World Bank
- URBAN DISTRIBUTION REHABILITATION AND EXPANSION (PHASE II) · 26 Jun 2008 · USD 1.5M · World Bank
- DS-2:WASTE WATER STUDIES IN DHAKA CITY · 14 Dec 2006 · USD 205K · World Bank
- WASTEWATER TREATMENT STRATEGIC STUDY · 25 Jun 2004 · USD 100K · World Bank
- DESIGN, SUPERVISION AND MANAGEMENT OF DISTRIBUTION NETWORKS CONSUTRUCTION WORKS - URBAN DISTRIBUTION REHABILITATION AND EXTENSION PR · 10 Jun 2004 · USD 1.1M · World Bank
- WASTEWATER TREATMENT PLANT IN VUKOVAR - PRELIMINARY DESIGN · 04 Jun 2004 · USD 236K · World Bank
- TECHNICAL FEASIBILITY STUDY · 01 Apr 2004 · USD 199K · World Bank
Method
Computed from 19 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.