Contractor intelligence · computed from public award records
TRACTEBEL ENGINEERING S.A
- Awards won
- 48
- Known value
- USD 70.6M
- First award
- 19 Feb 2004
- Most recent
- 19 Feb 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 47 | USD 70.0M | 19 Feb 2024 |
| Inter-American Development Bank | 1 | USD 683K | 29 Apr 2019 |
Where the work is
GN · 2IN · 2MA · 2MG · 2NG · 2PK · 2RO · 2GY · 1BJ · 1CM · 1GE · 1GH · 1ID · 1KE · 1MW · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- O. T. OTIS ENGINEERING · 2 shared contracts
- VIGUIER · 1 shared contract
- XPLORER CONSULTANCY SERVICES PRIVATE LIMITED · 1 shared contract
- International Marine and Dredging Consultants · 1 shared contract
- TRACTEBEL ENGINEERING PRIVATE LIMITED · 1 shared contract
- COMPAGNIE NATIONALE DU RHÔNE (CNR) · 1 shared contract
- AFRY · 1 shared contract
- C12 CONSULTANTS · 1 shared contract
- RUO CONSULTANT LTD · 1 shared contract
- TRACTEBEL GKW GMBH · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Power Utility Upgrade Program · 29 Apr 2019 · USD 683K · Inter-American Development Bank
- OWNER'S ENGINEER FOR THE CONSTRUCTION & GUARANTEE PERIOD (PHASE.2) · 17 Nov 2016 · USD 11.4M · World Bank
- Recencement populations et plan action reinstallation (PAR) pour populations 2eme vague de deplacement involontaire du Programme Kandadji · 06 Jul 2016 · USD 1.1M · World Bank
- ASSISTANCE TECHNIQUE POUR L'ELABORATION D'UNE STRATEGIE D'ACCES A L'ELECTRIFICATION Ã MADAGASCAR · 16 Jun 2016 · USD 267K · World Bank
- Nurek HPP Rehabiliation and Dam Safety Study · 28 Oct 2015 · USD 731K · World Bank
- ELABORATION DU PLAN DE DEVELOPPEMENT DE L'ELECTRICITE AU MOINDRE COUT - PDMC · 05 Oct 2015 · USD 444K · World Bank
- STRATEGIC STUDY FOR INTEGRATION IN RENEWABLE ENERGY MIX AND DEFINITION OF PLANNING AND IMPLEMENTATION OF STRATEGY (ETUDE STRATEGIQUE POUR L'INTEGRATION DES ENERGIES RENOUVLABLES DANS LE MIX ENERGETIQU · 03 Jun 2015 · USD 322K · World Bank
- Contract for Technical Assistance and Construction Supervision for Emergency Rehabilitation Works of the Macarretane Barrage · 31 Oct 2014 · USD 2.3M · World Bank
- preparation of bidding documents for rehabilitation of Haghtanak, Charentsavan-3, Vanadzor-1, Ashnak and Yerevan TPP substations, and 220 kV Lori and 110 kV Tumanyan-1,2 Overhead Transmission Lines · 24 Sept 2014 · USD 485K · World Bank
- kV Lori Overhead Tranmission Line · 24 Sept 2014 · USD 235K · World Bank
- Techno-Economic Assessment Study for Rehabilitation of Nurek HPP and dam safety provisions · 21 Aug 2014 · USD 1.2M · World Bank
- Feasibility Study of and Project Implementation Support for 110 kV Noyemberyan and Lalvar Overhead Transmission Lines · 23 Jul 2014 · USD 495K · World Bank
- Reconstruction Supervision of 110 kV Noyemberyan and Lalvar Overhead Transmission Lines, Part B · 23 Jul 2014 · USD 491K · World Bank
- Contrat relatif a la réalisation d'un plan directeur des ouvrages de production et de transport d'énergie électrique de la CI pour la période 2012-2030 · 17 Sept 2013 · USD 956K · World Bank
- Etude de faisabilité du barrage régulateur de Fempona d'une capacité de 100 millions de m3 environ pour la centrale hydroélectrique d'Andekaleka · 09 Jan 2013 · USD 759K · World Bank
- FEASIBILITY STUDY AND DETAILED DESIGN OF FARKWA DAM AND WATER CONVEYANCE SYSTEM TO DODOMA CITY · 26 Sept 2012 · USD 919K · World Bank
- FEASIBILITY STUDY FOR 4 SMALL MULTIPURPOSE DAMS AT KIREMBA, TABU-GAKOMERE, OMUMUKRA AND KARAZI IN THE KAGERA RIVER BASIN · 22 Sept 2011 · USD 1.2M · World Bank
- SELECTION D'UN CONSULTANT POUR LA REALISATION DES ETUDES DE FAISABILITE D'AVANT PROJET DETAILLE (APD) ET L'ELABORATION DU DOSSIER D'APPEL D'OFFRES (DAO) DE L'AMENAGEMENT HYDROELECTRIQUE DE KOUKOUTAMBA · 14 Apr 2010 · USD 397K · World Bank
- ENGINEERING SUPERVISION & SITE MANAGEMENT FOR THE INSTALLATION OF SYSTEM REACTIVE POWER COMPENSATION EQUIPMENT · 18 Jun 2008 · USD 1.0M · World Bank
- NATIONAL LOAD DEMAND STUDY · 03 Aug 2007 · USD 1.7M · World Bank
- ASSISTANCE TO BIDDING PROCESS FOR THE SUBSTATIONS REHABILITATION PROJECT · 19 Feb 2004 · USD 77K · World Bank
Method
Computed from 48 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.