Skip to main content

Contractor intelligence · computed from public award records

ULTRA GROUP

Awards won
19
Known value
USD 726K
First award
09 Apr 2019
Most recent
10 Feb 2026

Wins by funder

FunderAwardsKnown valueMost recent
World Bank19USD 726K10 Feb 2026

Where the work is

UZ · 19

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • Comprehensive renovation of the existing buildings of General Secondary School No. 33 in Faravon MCA, Mingbuloq District · 10 Feb 2026 · USD 10K · World Bank
  • Consulting services for the preparation of detailed design estimates and tender documentation for the reconstruction of the Central Park in the city of Guzar and National Park in the city of Kitab in · 07 Aug 2025 · USD 98K · World Bank
  • Laying of 0.4 kV electric network 28.5 km and installation of 10/0.4 kV transformer substation along the streets of MCA "Chiganok" Papsky district · 06 Dec 2024 · USD 11K · World Bank
  • Repair (asphalting) of internal roads 13 km on the section of the MCA "Barkamol" (Barkamol, Choshtepa, Urikzor streets) Yangikurgan district · 18 Nov 2024 · USD 22K · World Bank
  • Repair (asphalting) of internal roads 4 km on the section of the MCA "Guliston" (Istiklol, Toshlok, Ulugchinor, Ilgor streets) of the Yangikurgan district · 05 Nov 2024 · USD 7K · World Bank
  • Laying of 0.4 kV electric network 11.1 km and installation of 10/0.4 kV transformer substation along the streets of MCA "Chinor" Papsky district · 05 Nov 2024 · USD 5K · World Bank
  • Laying of 0.4 kV electric network 11.5 km and installation of 10/0.4 kV transformer substation along the streets of MCA "Obi Khaet" Papsky district · 05 Nov 2024 · USD 6K · World Bank
  • Construction of asphalt concrete pavements of internal roads 12.7 km on the section of the MCA "Galaba" (Khayotbakhsh, Ulugnor, Navbahor, Ozodlik, Sokhilbuyi, Iskovot streets) of the Yangikurgan distr · 05 Nov 2024 · USD 21K · World Bank
  • Installation of asphalt concrete pavements of internal roads 3 km on the section of the MCA "Bog" (Mustakillik, Yangiobod, Istiklol streets) of the Yangikurgan district · 05 Nov 2024 · USD 6K · World Bank
  • Repair (asphalting) of internal roads 10 km on the section of the MCA "Bekobod" (Oltin Vodiy, Nuraliobod, Diydor, Mardlik, Orzu, Guzar, Osuda, Ilgor streets) of the Yangikurgan district · 05 Nov 2024 · USD 16K · World Bank
  • Replacement of the heating system of school No. 54 in the MCA "Navruz" of the Pap district · 06 Oct 2023 · USD 4K · World Bank
  • Repair of internal roads (engraving and asphalting) (11 km) in the MSG “Pilol” of the Chust district · 07 Aug 2023 · USD 16K · World Bank
  • Repair of internal roads (engraving, asphalting) (16.6 km) in the MSG “Munchoktepa”, Chust district · 07 Aug 2023 · USD 45K · World Bank
  • Improvement of power supply (16 km) in MCA "Yangiobod" of Pap district · 07 Aug 2023 · USD 18K · World Bank
  • Design services for the subprojects ""Reconstruction of drinking water supply systems of "Urta" MCA of Yangikurgan district · 13 Jun 2022 · USD 16K · World Bank
  • Design services for the subprojects ""Reconstruction of drinking water supply systems of "Zarkent", "Hadikent" MCA of Yangikurga · 13 Jun 2022 · USD 43K · World Bank
  • Consultant for Development of Detailed Designs and Bid documents, and Construction Supervision for the Construction / Repair of Garage Premises in the cities of Chartak, Kagan and Yangiyul · 15 May 2020 · USD 92K · World Bank
  • Consulting services for the development of detailed design, bidding documents and construction supervision of the Chartak Eco-Trail for non-motorized mobility in the city of Chartak · 22 Apr 2020 · USD 212K · World Bank
  • the scope of work developed for a specific period of 10 months for the development of a Feasibility Study (FS), (ii) the preparation of Detailed Designs (DD) and Bidding Documents, as well as 6 months · 09 Apr 2019 · USD 80K · World Bank

Method

Computed from 19 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.