VA TECH WABAG LIMITED
- Awards won
- 16
- Known value
- USD 729.6M
- First award
- 01 Mar 2004
- Most recent
- 16 May 2023
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 16 | USD 729.6M | 16 May 2023 |
Where the work is
IN · 7TN · 2BD · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- EMS INFRACON · 2 shared contracts
- BONNA TUNISIE · 1 shared contract
- BONNA BETON MATERIAUX PREFABRIQUES · 1 shared contract
- SOCIETE VA TECH WABAG TUNISIE · 1 shared contract
- SOCIETE VATECH WABAG LIMITED · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Reconstruction, Expansion and Operation of Pagla STP · 16 May 2023 · USD 94.7M · World Bank
- Development of STP projects at Digha and Kankarbagh in Patna, through Hybrid Annuity based PPP mode · 30 Dec 2019 · USD 168.7M · World Bank
- Development of STP projects at Digha and Kankarbagh in Patna, through Hybrid Annuity based PPP mode. · 30 Dec 2019 · USD 132.6M · World Bank
- Development of STPs and Integration of existing assets at Howrah, Bally and Baranagar & Kamarhati under Hybrid Annuity based PPP mode · 05 Jun 2019 · USD 83.3M · World Bank
- Development of STPs and Integration of existing assets at Howrah, Bally and Baranagar & Kamarhati under Hybrid Annuity based PPP mode · 05 Jun 2019 · USD 61.1M · World Bank
- Survey, review the designs, redesign where necessary and build new sewerage network of about 97 km length and all appurtenant structures and Operation and Maintenance of Sewerage network for a period · 11 May 2018 · USD 18.5M · World Bank
- Survey, review the designs, redesign where necessary and build new sewerage network of about 97 km length and all appurtenant structures and Operation and Maintenance of Sewerage network for a period · 11 May 2018 · USD 13.4M · World Bank
- Design and Build 60 MLD STP including MPS 97 MLD all appurtenant Structures and allied works, O&M of 15 years at Pahari in Patna, Bihar · 09 May 2018 · USD 22.7M · World Bank
- Réalisation en clé de la 2ème phase de la station de traitement ST4 · 22 Jul 2016 · USD 1.5M · World Bank
- Projet de réhabilitation de la ST4 à GEG · 22 Jul 2016 · USD 1.5M · World Bank
- Construction of the South Pasig Package 1A Sewerage System · 13 Mar 2015 · USD 19.1M · World Bank
- Design and Build of 60MLD Valenzuela Sewage Treatment Plant · 23 Dec 2014 · USD 27.5M · World Bank
- MWMP-13-01a Design and Build of Muntinlupa (Tunasan) Sewage Treatment Plant · 27 Nov 2014 · USD 15.5M · World Bank
- DESIGN AND CONSTRUCTION OF THE ILUGIN SEWAGE TREATMENT PLANT FOR THE PASIG RIVER WASTEWATER CATCHMENT (PASIG CITY, METRO MANILA) · 27 Sept 2013 · USD 59.9M · World Bank
- Providing Sewerage Facilities to Pallavaram, Municipility [Slice - I [Package V]] · 28 Aug 2009 · USD 3.7M · World Bank
- SUPPLY, INSTAL AND COMMISSIONING OF TAIPINGMEN PUMPING STATION AND PROCUREMENT OF PLANT AND EQUIPMENT · 01 Mar 2004 · USD 6.0M · World Bank
Method
Computed from 16 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.