Contractor intelligence · computed from public award records
Z AND A CONSULTING ENGINEERS INTERNATIONAL LIMITED
- Awards won
- 17
- Known value
- USD 11.0M
- First award
- 15 Dec 2016
- Most recent
- 22 Nov 2024
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 17 | USD 11.0M | 22 Nov 2024 |
Where the work is
MW · 7MZ · 3GH · 2ZM · 2AL · 1KE · 1RW · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- DESIGN MANAGEMENT CONSULTANTS · 5 shared contracts
- STUDIO GAILLIINGEGNERIA S.R.I · 4 shared contracts
- SWS CONSULTING ENGINEERING-STRUCTURES, WATER & SURVEY SRL · 3 shared contracts
- BETA STUDIO S.R.L · 3 shared contracts
- BETA STUDIO SRL-Z &A CONSULTING ENGINEERS INT'L LTD · 2 shared contracts
- HMR CONSULTORES LDA · 2 shared contracts
- HE SK11 · 1 shared contract
- GEOMATICS CIVIL ENGINEERING SURVEYORS · 1 shared contract
- (JV) SGI STUDIO GALLI INGEGNERIA SRL & STUDIO MARTINI INGEGNERIA SRL – ITALY, · 1 shared contract
- SGI STUDI GALLI INGEGNERI · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Consultancy Services for Feasibility and Detailed Design of Mulanje Dam, Mombezi Multipurpose Dam and Associated Structures · 22 Nov 2024 · USD 809K · World Bank
- Supervision and Elaboration of Environmental and Social Instruments for Nampula Water Supply Systems – Package 4 · 12 Sept 2024 · USD 704K · World Bank
- Design and Elaboration of Environmental and Social Instruments for Nampula Water Supply Systems – Package 4 · 12 Sept 2024 · USD 244K · World Bank
- contract for Hiring a consultancy firm for Review design study for Cyohoha hillside and marshland · 21 Aug 2024 · USD 718K · World Bank
- Supervision of Multipurpose Water Harvesting Structures. · 24 Apr 2024 · USD 403K · World Bank
- Consultancy Services for Detailed Designs and Project Supervision of Blantyre Water Supply Network Upgrades- Phase 2–construction supervision and DMA establishment and commissioning. · 13 Mar 2024 · USD 796K · World Bank
- Consultancy Services for Detailed Designs and Project Supervision of Blantyre Water Supply Network Upgrades- Phase 1 detailed design and tender documentation · 13 Mar 2024 · USD 324K · World Bank
- CONSULTANCY SERVICES FOR THE PREPARATION OF A MASTER PLAN FOR PEMBA AND NACALA WATER SUPPLY SYSTEMS · 19 May 2023 · USD 621K · World Bank
- Feasibility Study, Detailed Design Multipurpose Water Harvesting Structures · 06 Oct 2022 · USD 407K · World Bank
- Consultancy Services to Conduct Review of Detailed Designs, Detailed Feasibility Study, Detailed Design Studies, of Irrigation Schemes in Balaka, Dedza, Machinga, Chikwawa · 22 Aug 2022 · USD 312K · World Bank
- Construction Supervision of Irrigation Schemes in Balaka, Dedza, Machinga, Chikwawa · 22 Aug 2022 · USD 384K · World Bank
- Consultancy services for initial assessment of suitability and for development of Performance-Based Contracts (PBCs) for Non-Revenue Water (NRW) reduction for a cluster of five (5) WSPs · 26 Jul 2021 · USD 139K · World Bank
- Consulting Service for Preparation of Community Facilitation, Planning, Preliminary and Detailed Engineering Designs for Three low-income Communities · 27 May 2021 · USD 180K · World Bank
- Consulting Service for Construction Supervision and Contract Management for three low-income Communities · 27 May 2021 · USD 200K · World Bank
- Supervisory Services for Irrigation and Drainage Works: Consulting Services for Supervisory Services for rehabilitation works of six irrigation schemes (Tregtan2, Tregtan3, Leminot, Slanica, etc. · 26 Feb 2019 · USD 157K · World Bank
- Contract for the Supervision of Lusitu, Mwomboshi and Musakashi Irrigation Schemes and Preparations of Maintenance Plans · 15 Dec 2016 · USD 2.3M · World Bank
- Construction Supervision of the Lusitu, Mwomboshi and Musakashi Irrigation Schemes and Preparation of Maintenance Plans · 15 Dec 2016 · USD 2.3M · World Bank
Method
Computed from 17 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.