Contractor intelligence · computed from public award records
COBA - CONSULTORES DE ENGENHARIA E AMBIENTE, S.A.
- Awards won
- 20
- Known value
- USD 7.1M
- First award
- 07 Jul 2017
- Most recent
- 08 Jul 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 20 | USD 7.1M | 08 Jul 2026 |
Where the work is
MZ · 9AO · 8ST · 2
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- COBA ANGOLA · 4 shared contracts
- CONSULTEC - CONSULTORES ASSOCIADOS LDA · 2 shared contracts
- ARTELIA · 2 shared contracts
- ARTELIA EAU ET ENVIRONMENT (FRANCE)WITH SUBCONSULTANTSNIPPON KOEI (JAPAN), MYANMAR KOEI (MYANMAR), ARTELIA MYANMAR · 2 shared contracts
- COBANGOLA – CONSULTORES DE ENGENHARIA, LDA · 2 shared contracts
- DAR AL-HANDASAH CONSULTANTS (SHAIR & PARTNERS) · 1 shared contract
- PEGASYS (PTY) LTD · 1 shared contract
- ADP - ÁGUAS DE PORTUGAL INTERNACIONAL, SERVIÇOS AMBIENTAIS, S.A. · 1 shared contract
- INTERTECHNE CONSULTORES S.A. · 1 shared contract
- SALOMON LIMITADA · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- CONSULTANCY SERVICES FOR THE PREPARATION OF AN INTEGRATED WATER RESOURCES MANAGEMENT PLAN FOR BENGUELA RIVER BASINS · 08 Jul 2026 · USD 520K · World Bank
- Consulting Service for Preparation of an Integrated Water Resources Management Plan for Cunene River Basin · 08 Jul 2026 · USD 407K · World Bank
- Owner's Engineer for review and approval of EPC's design and supervision of works for distribution networks rehabilitation and expansion - Package A (Huambo and Luanda 1 Cities), ENDE. · 25 Feb 2026 · USD 647K · World Bank
- OWNER’S ENGINEER FOR SUPERVISION OF THE IMPLEMENTATION OF THE CONTRACT FOR THE SITE PREPARATION AND REPAIR OF ACCESS TRACK | AGUA CASADA SOLAR PARK · 22 Apr 2025 · USD 402K · World Bank
- Consulting services for detailed design and construction supervision of an auxiliary spillway and a new water intake at corumana dam · 30 May 2024 · USD 1.4M · World Bank
- OWNER’S ENGINEER FOR THE DESIGN AND SUPERVISION FOR THE CONSTRUCTION OF A SOLAR PARK IN SAO TOME · 01 Feb 2023 · USD 138K · World Bank
- THE ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) OF THE REHABILITATION AND EXPANSION OF THE EXISTING MUCARI WATER SUPPLY SYSTEM IN THE CITY OF N?DALATANDO · 01 Nov 2022 · USD 139K · World Bank
- Preparation of the Environmental and Social Impact Assessment for priority sewerage works in Quelimane and Tete · 10 Oct 2022 · USD 309K · World Bank
- Serviços de Consultoria para Assistência Técnica das Obras de Reabilitação das Pontes Cais do Ibo na Província de Cabo Delgado e Búzi na Província de Sofala · 08 Jul 2022 · USD 54K · World Bank
- Serviços de Consultoria para a Fiscalização das Obras de Reabilitação das Pontes Cais do Ibo na Província de Cabo Delgado e Búzi na Província de Sofala · 08 Jul 2022 · USD 226K · World Bank
- DESIGN CHECKING AND WORKS SUPERVISION OF WATER SUPPLY NETWORK AND HOUSE CONNECTIONS IN THE CITY OF N’DALATANDO. · 13 Dec 2021 · USD 518K · World Bank
- CONSULTING SERVICES FOR THE PREPARATION OF PARTICIPATORY SANITATION MASTER PLANS WITH TECHNICAL SPECIFICATIONS FOR BIDDING DOCUMENTS FOR FOUR CITIES, IN LINE WITH THE CITYWIDE APPROACH · 09 Sept 2021 · USD 300K · World Bank
- Contratação de Serviços de Consultoria para Elaboração do Estudo do Impacto Ambiental e Social para a Reabilitação da Estação de Tratamento de Águas Residuais de Infulene · 31 Aug 2021 · USD 134K · World Bank
- CONTRATAÇÃO DE SERVIÇOS DE CONSULTORIA PARA ELABORAÇÃO DO ESTUDO DO IMPACTO AMBIENTAL E SOCIAL PARA A REABILITAÇÃO DA ESTAÇÃO DE TRATAMENTO DE ÁGUAS RESIDUAIS DE INFULENE · 06 Feb 2020 · USD 123K · World Bank
- ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR UIGE WATER SUPPLY SYSTEM · 26 Aug 2019 · USD 70K · World Bank
- PREPARATION OF PARTICIPATORY SANITATION MASTERPLANS WITH TECHNICAL SPECIFICATIONS FOR BIDDING DOCUMENTS FOR UÍGE, MALANJE, AND LUBANGO · 19 Aug 2019 · USD 310K · World Bank
- Environmental and Social Impact Assessment (ESIA) for Infulene Waste Water Treatment Plant · 31 Aug 2018 · USD 129K · World Bank
- Supervision of Rehabilitation and Construction of Distribution Centres and Network, Pemba · 16 Mar 2018 · USD 828K · World Bank
- Design of Rehabilitation and Construction of Distribution Centres and Network, Pemba · 16 Mar 2018 · USD 304K · World Bank
- Consultancy Services for the Sábie Water Treatment Plant bypass Design and Feasibility Study for temporary WTP · 07 Jul 2017 · USD 112K · World Bank
Method
Computed from 20 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.