Contractor intelligence · computed from public award records
CDR INTERNATIONAL B.V.
- Awards won
- 10
- Known value
- USD 4.5M
- First award
- 29 Jun 2018
- Most recent
- 25 Mar 2026
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 9 | USD 3.8M | 25 Mar 2026 |
| Inter-American Development Bank | 1 | USD 660K | 24 Oct 2022 |
Where the work is
MZ · 3TZ · 3BS · 1GY · 1ST · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- TPF - CONSULTORES DE ENGENHARIA E ARQUITETURA, S.A. · 3 shared contracts
- TPF ENGENHARIA, LTDA · 3 shared contracts
- DELTARES · 2 shared contracts
- Stichting Deltares · 2 shared contracts
- WISSING URBAN DESIGN · 2 shared contracts
- NORPLAN TANZANIA LTD. · 1 shared contract
- PROJECT PLANNING & MANAGEMENT · 1 shared contract
- SIZWE JACKSON CONSULTANCY SERVICE · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Designs, Bidding Documents and Construction Supervision and Capacity Building Activities for Guyana Coastal Adaptation and Resilience Project (CARes) · 25 Mar 2026 · USD 694K · World Bank
- Consultancy Services for Screening of Flood and Erosion Control Interventions in the Middle & Upper Basin of the Msimbazi River and Preparing Feasibility Studies, Detailed Designs & Bidding Documents · 15 Jan 2026 · USD 466K · World Bank
- Consultancy Service for Technical Assistance to SASB for Operation and Maintenance of Beira – Phase 2 Drainage System · 04 Dec 2024 · USD 324K · World Bank
- Consulting Service for the development of “Transboundary Integrated Flood Management Plan and Assessment of the Unyama River Catchment at Elegu Border Post, South Sudan · 13 Sept 2024 · USD 133K · World Bank
- Designs for the mitigation of the erosion problem in Chimaloa, for the construction of a protective wall, drainage ditch and embankment in Ribeira Afonso,as well as their respective ESIA · 30 May 2024 · USD 268K · World Bank
- Climate Resilient Coastal Mangement and Infrastructure Program · 24 Oct 2022 · USD 660K · Inter-American Development Bank
- Consultancy Service for Feasibility Study and Detailed Design for Phase 2 of Drainage Works in the city of Beira · 18 Nov 2021 · USD 527K · World Bank
- Supervision for Phase 2 of Drainage Works in the city of Beira · 18 Nov 2021 · USD 469K · World Bank
- Consultancy Services to undertake Hydrological Study, Detailed Engineering Design and Preparation of Bidding Documents for Flood Prevention Measures at Jangwani Valley in Dar es Salaam · 22 Jan 2019 · USD 905K · World Bank
- Provision of Consultancy Services for Reviewing Special Planning Area Boundary for the Msimbazi River Valley · 29 Jun 2018 · USD 38K · World Bank
Method
Computed from 10 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.