Contractor intelligence · computed from public award records
Stichting Deltares
- Awards won
- 15
- Known value
- USD 15.0M
- First award
- 22 Jan 2011
- Most recent
- 01 Jul 2025
Wins by funder
| Funder | Awards | Known value | Most recent |
|---|---|---|---|
| World Bank | 14 | USD 14.7M | 01 Jul 2025 |
| Inter-American Development Bank | 1 | USD 297K | 30 Sept 2020 |
Where the work is
MZ · 2BD · 1GH · 1LA · 1LR · 1VN · 1WS · 1
Frequent co-participants
Organizations awarded within the same contracts — partners on some, rivals on others.
- TPF - CONSULTORES DE ENGENHARIA E ARQUITETURA, S.A. · 2 shared contracts
- TPF ENGENHARIA, LTDA · 2 shared contracts
- CDR INTERNATIONAL B.V. · 2 shared contracts
- ROYAL HASKONINGDHV · 1 shared contract
- HYDRO-ENGINEERING INSTITUTE · 1 shared contract
- THE ENERGY AND RESOURCES INSTITUTE (TERI) · 1 shared contract
- Haskoning Nederland B.V. · 1 shared contract
- VODOPRIVREDNO-PROJEKTNI BIRO, d.d. · 1 shared contract
- Dhi A/S · 1 shared contract
- HASKONINGDHV VIETNAM CO. LTD. · 1 shared contract
Sources
The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.
- Consultancy Services for the Conduct of Feasibility Studies, Preparation of Technical Designs, Bidding Documents, Environmental and Social Safeguards Instruments · 01 Jul 2025 · USD 581K · World Bank
- Procurement of a firm for the development of Master Plan for controlling plastic pollution in the selected Rivers in Sri Lanka · 03 Apr 2025 · USD 97K · World Bank
- The main goal of this assignment is to improve the forecasting of flood and low-flow events and related warning procedures in the Sava River basin to better inform decision-making on the management · 03 Feb 2025 · USD 420K · World Bank
- Consultancy Service for Technical Assistance to SASB for Operation and Maintenance of Beira – Phase 2 Drainage System · 04 Dec 2024 · USD 324K · World Bank
- Selection of a Service Provider to Develop, Implementation, operation and Hand-over of Flood Early Warning Response System Accra, including training · 03 May 2024 · USD 1.0M · World Bank
- Supervision for Phase 2 of Drainage Works in the city of Beira · 18 Nov 2021 · USD 469K · World Bank
- Modernization of the Salto Grande Binational Hydropower Complex · 30 Sept 2020 · USD 297K · Inter-American Development Bank
- Hydromet Observation System Integrator · 09 Jul 2020 · USD 1.4M · World Bank
- Consultant (firm) for Capacity building and research on hydrological modelling of reservoirs for forecasting and assessment of hydropower production · 30 Apr 2020 · USD 193K · World Bank
- Geomorphology studies and coastal dynamics and vegetative options for coastal protection of communities · 26 Oct 2018 · USD 352K · World Bank
- Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone (Sustainable Polder Adapted to Coastal Dynamics) under Coastal Embankment Improvement Project, Phase-1 (CEIP-1) · 04 Oct 2018 · USD 6.9M · World Bank
- Development of the Decision Support System (DSS) for Sesan and Srepok River Basins · 27 Apr 2018 · USD 717K · World Bank
- Contract for PREPSamoaCON14 / System Integrator Consultant / STITCHING DELTARES · 16 Apr 2018 · USD 1.3M · World Bank
- Review of "Beach Erosion Studies and Engineering Mitigation Measures" for Visakhapatnam conducted by NOIT. · 11 Nov 2015 · USD 30K · World Bank
- Upgrading of Tools, Water Resources Database, Management Systems and Models Under Sub-Component #B1# of WCAP · 22 Jan 2011 · USD 886K · World Bank
Method
Computed from 15 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.