Skip to main content

Contractor intelligence · computed from public award records

TPF - CONSULTORES DE ENGENHARIA E ARQUITETURA, S.A.

Awards won
17
Known value
USD 8.6M
First award
06 Sept 2017
Most recent
19 Dec 2025

Wins by funder

FunderAwardsKnown valueMost recent
World Bank17USD 8.6M19 Dec 2025

Where the work is

MZ · 10AO · 2BR · 2CM · 1

Frequent co-participants

Organizations awarded within the same contracts — partners on some, rivals on others.

Sources

The most recent award records behind the figures above. Every number on this page is computed from records like these — nothing is estimated or editorial.

  • CONSULTANCY SERVICES FOR FEASIBILITY STUDY, ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) OF THE REHABILITATION OF SENDI AND QUIMAIA DAMS AND IRRIGATION SYSTEMS IN HUILA PROVINCE · 19 Dec 2025 · USD 434K · World Bank
  • Consultancy Service for Technical Assistance to SASB for Operation and Maintenance of Beira – Phase 2 Drainage System · 04 Dec 2024 · USD 324K · World Bank
  • CONTRATA??O DE EMPRESA PARA ELABORA??O DE PROJETOS EXECUTIVOS DE ENGENHARIA SISTEMAS DE ABASTECIMENTO DE ?GUA SAA NO MEIO RURAL, PARA ATENDIMENTO DE 15.000 FAM?LIAS, NO ?MBITO DO PDRS/PSJ III 2 · 25 Nov 2022 · USD 266K · World Bank
  • Preparation of Preliminary and Detailed Plans and Designs for the Implementation of the Maputo Sanitary Landfill and Closure of the Hulene Dump · 31 Oct 2022 · USD 593K · World Bank
  • Supervision for Phase 2 of Drainage Works in the city of Beira · 18 Nov 2021 · USD 469K · World Bank
  • Consultancy Service for Feasibility Study and Detailed Design for Phase 2 of Drainage Works in the city of Beira · 18 Nov 2021 · USD 527K · World Bank
  • CONSULTANCY SERVICES FOR PROCUREMENT OF PUBLIC-PRIVATE PARTNERSHIP (PPP) TRANSACTION ADVISOR FOR THE WATER SUPPLY IN CABINDA – ANGOLA · 14 Oct 2021 · USD 412K · World Bank
  • Etude de Faisabilité et Avant-Projet Sommaire pour le renouvellement de la ligne ferroviaire Douala - Yaoundé · 08 May 2020 · USD 106K · World Bank
  • ELABORAÇÃO DE DOIS PROJETOS EXECUTIVOS DE SISTEMA DE ABASTECIMENTO DE ÁGUA NOS MUNICÍPIOS DE MIGUEL CALMON E JAGUARARI · 20 Apr 2020 · USD 64K · World Bank
  • Suivi et contrôle des travaux de réhabilitation de cinquante-cinq (55) ponts ferroviaires sur la ligne Douala Ngaoundéré · 28 Dec 2019 · USD 190K · World Bank
  • Elaboration of the National Marine Spatial Plan · 08 Apr 2019 · USD 1.2M · World Bank
  • Consultancy Service for the preparation and implementation of an institutional study for integration of stormwater drainage management entity within SASB of the Municipality of Beira · 03 Jul 2018 · USD 910K · World Bank
  • Consultancy for supervision of Works for the implementation of the integrated designs of selected natural drainage system · 03 Jul 2018 · USD 976K · World Bank
  • Updating Hydrological Modelling in the Zambezi River Basin · 27 Apr 2018 · USD 135K · World Bank
  • Preparation of national spatial planning plan · 18 Jan 2018 · USD 1.5M · World Bank
  • Preparation of Monographs, Scenarios and Strategic Plans for the Integrated Development of Water Resources of Meluli, Monapo, Mecuburi, Ligonha and Motomonho River Basins in Nampula Province · 06 Sept 2017 · USD 279K · World Bank
  • Preparation of Monographs, Scenarios and Strategic Plans for the Integrated Development of Water Resources of Melela, Molocue, Nipiode, Raraga And Moniga River Basins in Zambézia Province · 06 Sept 2017 · USD 268K · World Bank

Method

Computed from 17 award records ingested from official disclosure sources (World Bank, Inter-American Development Bank, and published contract-award notices). Values are shown in USD where the source published one; entity identity is resolved conservatively and reviewed. GLODA is not affiliated with any funder or contractor shown. Last computed 15 Sept 2026.